Construction site safety inspection content?
According to the relevant state departments to develop building construction safety inspection standards JGJ59-99 implementation. (A) site enclosure 1. The height of the enclosure according to the division of the local administrative area, the height of the enclosure set up around the site of the main sections of the urban area is not less than 2.5m; the height of the enclosure set up around the site of the general section is not less than 1.8m. 2. Enclosure materials should be selected masonry, metal plates and other hard materials, prohibit the use of colorful striped fabrics, bamboo fences, safety nets and other deformable materials, so as to achieve a firm, balanced, clean, and beautiful. 3. The setup of the enclosure must be along the line of the masonry. 3. The setup of the enclosure must be continuous along the perimeter of the site, there can be no gaps, or elsewhere not solid and other issues. (ii) Enclosure management 1. In order to strengthen the site management, the construction site should have fixed entrances and exits. The entrance and exit should be set up to facilitate the management of the gate. 2. There should be full-time guards and guard management system at the entrance and exit to play the role of guards. 3. 3. In order to strengthen the management of the personnel in and out of the site, it is stipulated that the personnel entering the construction site should wear the work card to show the proof, and the work card should be worn neatly. 4. The form of entrance and exit gate, each enterprise and each region can be designed according to their own characteristics. (C) the construction site 1. the ground of the site, the conditions of the concrete floor, no conditions can be used to harden the ground of other measures to make the site ground level and solid. But such as mixer shed and other places where water is likely to accumulate, should be made of concrete and good drainage measures. 2. 2. The construction site should have circulating trunk road, and keep it open frequently, without stacking components, materials, roads should be smooth and solid, without large areas of water. 3. The construction site should have good drainage facilities to ensure smooth drainage. 4 engineering construction of wastewater, slurry should flow through the water tank or pipeline to the site catchment basin unified precipitation treatment, shall not be discharged to pollute the construction area outside the river, road surface. 5. There should be no running, bubbling, dripping, leaking or large waterlogging phenomenon in the pipeline of the construction site. 6 construction site should be prohibited smoking to prevent danger, should be set up in accordance with the project situation of fixed smoking room or smoking place, smoking room should be far away from the danger zone and set up the necessary fire extinguishing equipment. 7. The site should be as green as possible, especially in the urban areas of the main road site should be the first to do. (D) material stacking 1 construction site tools, components, materials must be placed in accordance with the location of the general plan. 2 various materials, components stacked in accordance with the location of the general plan. 2. all kinds of materials, components must be stacked according to species, specifications stacking, and set up obvious signage. 3 all kinds of materials must be stacked neatly, brick into a ding, gravel and other materials into a square, large tools should be a head to see Qi, steel, components, steel moldboard should be stacked neatly with wooden cushions. 4. The working area and the building floor should be cleaned up as soon as it is finished. In addition to the construction layer of poured concrete, the lower floors where the strength with the demolding with the timely cleanup and transportation, can not be immediately transported away must be placed neatly. 5. the floor cleanup of the garbage shall not be long-term piling up in the floor should be transported away in a timely manner, the construction site of the garbage should also be separate types of centralized piling. 6. flammable and explosive substances can not be mixed, in addition to the site has a centralized storage place outside the team to use a variety of scattered flammable and explosive substances, must be stored in accordance with relevant regulations. (E) on-site accommodation 1. construction site must be strictly separated from the construction work area and living area can not be mixed. In the construction project shall not be used as a dormitory, because accommodation in the construction area will bring a variety of dangers, such as falling objects injury, electric shock or inside the hole, the edge of the protection is not strict and cause accidents. Such as two-shift operation, construction noise affects the rest of workers. 2. The construction work area and the office area and living area are clearly divided, and there are isolation and safety protection measures to prevent accidents. 3. Winter accommodation in cold areas should have measures to keep warm and prevent gas poisoning. The stoves should be uniformly set up and managed by special persons with post responsibilities. 4. 4. In the hot season, the dormitory should have measures to eliminate summer heat and prevent mosquito bites, so as to ensure that the construction workers have enough sleep. 5. Inside the dormitory, beds and all kinds of daily necessities are placed neatly, the number of people in the room should be limited, there is a safe passage, the door of the dormitory is open to the outside, the bedding is folded neatly and cleanly, and there is no bad smell in the room. Dormitory outside the surrounding environmental health is good, not splashing and pouring, should be set up dirt barrels, cesspools, housing around the road level, indoor lighting below 2.4m, using 36V safety voltage, not allowed to dry clothes on the 36V wires. (F) on-site fire prevention 1. construction site should be based on the construction conditions of fire fighting system or fire fighting measures, and record the effect of implementation. 2. 2. According to different operating conditions, reasonably equipped with fire extinguishing equipment. Such as electrical equipment should be set up near the dry powder class non-conductive fire extinguishing equipment; for the set of foam fire extinguishers should be changed date and sun protection measures. The location and quantity of fire extinguishing equipment should be in accordance with the relevant fire regulations. 3 when the building construction height of more than 30m, in order to solve the problem of relying solely on the fire fighting equipment to extinguish the problem of insufficient effect, the requirements of adequate fire fighting water sources and self-help water, riser diameter in more than 2 when there is enough head of high-pressure pumps to ensure that the water pressure and fire fighting water connections on each level. 4. construction site should be established fire approval system. Where open-flame operations must be approved by the competent authorities (approval should be written requirements and precautions), the operation, should be set up in accordance with the provisions of the guardian, after the operation, must confirm that there is no danger of fire before leaving. (VII) Comprehensive management of law and order 1. The construction site shall appropriately set up workers' amateur learning and recreation places in the production area so that the personnel after labor can also have reasonable rest. (2) The construction site shall establish the security system and the division of responsibility and have the person in charge of checking the implementation of the system. (3) Security work not only directly affects the safety of the construction site and important work, but also necessary for social stability, should be effective measures, the effect is obvious. (H) construction site signage 1. construction site should be neatly obvious at the entrance to the "five signs and a map. Five signs: project profile sign management list and supervisory telephone number sign fire protection sign production safety sign civilized construction sign a map: the construction site plan If some areas that the content should be added, according to the regional requirements. The contents of five signs are not specified, but can be combined with the requirements of the region, the enterprise and the characteristics of the project. 2. sign is an important construction site signs a content, so not only the content should be targeted, at the same time, sign production, labeling should be standardized and neat, neat font. 3. In order to further do a good job of safety publicity for workers, so the construction site in the obvious place, there should be the necessary safety content of the slogan. 4. construction site should be set up to read newspaper columns, blackboards and other propaganda garden, enrich the content of learning, praising good deeds. (Ix) living facilities 1. construction site should be set up in line with the health requirements of the toilet, there should be a flush toilet, toilet should be responsible for the management. 2. (2) Maintain hygiene in the building and construction site, and do not allow urination and defecation. When the high-rise building is under construction, mobile simple toilets can be set up at intervals of several floors to practically solve the practical problems of the construction workers. 3. Cafeteria building, cafeteria health must meet the relevant health requirements. Such as cooks must have health epidemic prevention department issued by the medical examination certificate, raw and cooked food should be stored separately, canteen cooks wear white overalls, canteen health regular inspection. 4. The canteen should be in the obvious place to hang the health responsibility system and the implementation of the person. 5. construction site workers should be able to drink white water in line with health requirements. There are fixed water containers and specialized management. 6. the construction site should be set according to the number of workers enough to use the shower facilities, shower room in the cold season should be heated, hot water, shower room should be management system and management. (7) The domestic garbage shall be cleaned up in time and transported into the container centrally, and shall not be mixed with the construction garbage, and shall be managed by special person. (X) health care and first aid 1. The larger construction sites should have infirmary, full-time doctor on duty. General site conditions are not set up infirmary, there should be health care medicine box and general common medicines, and a doctor tour medical. 2. 2. In order to adapt to the temporary occurrence of accidental injury, the site should be equipped with first aid equipment (such as stretcher, etc.) in order to timely rescue, not to expand the injury. 3 construction site should be trained and qualified first-aiders, know the general first aid knowledge. 4. (4) In order to protect the health of workers, should be in the epidemic season timely and regularly carry out hygiene and disease prevention publicity and education. (XI) Community services 1. The construction site shall not disturb the people, and dust and noise prevention facilities shall be set up for the construction process, so as not to exceed the standard (the noise requirement of the construction site shall not be more than 85 decibels). 2. 2. According to local regulations, when construction must be carried out outside the permitted construction time, there should be approval procedures by the competent authorities, and the surrounding work should be done well. 3. No burning of toxic and hazardous substances is allowed on site, and they should be disposed of in accordance with the relevant regulations. 4. Non-disturbance measures should be established on site. There is a responsible person to manage and check, or with the community to regularly contact to listen to the views of reasonable views should be dealt with in a timely manner, the work should be documented. The "three treasures" "four mouths" protection I. Basic provisions 1. In the actual construction of the actual situation of the project, the safety and technical measures for work at height and the materials and equipment required, must be included in the project's construction design; 2. The person in charge of the construction of the unit project should be the project's The person in charge of the construction of the unit project should be responsible for the safety technology of the work at height, and establish the corresponding hierarchical responsibility system; 3. Before construction, the safety technology education and briefing should be carried out step by step, and all the safety technology measures and personal protective equipment should be implemented, and the construction should not be carried out without implementation. 4. safety signs, tools, instruments, electrical facilities and various equipment in the work at height, must be checked before construction to confirm its integrity before being put into use; 5. climbing and suspended work at height personnel 鈥馺 build safety facilities for work at height personnel must be licensed after professional and technical training and professional examination, and regular physical examination; 6. construction of safety and technical facilities for work at height When defects and hidden dangers are found, they must be solved in time to jeopardize personal safety, and the operation must be stopped; 7. The materials used in the work at height at the construction site should be piled up in a smooth manner, so as not to hinder the passage and loading and unloading. Tools should be put into the tool bag, the work of the aisle, access panels and climbing gear, should be cleaned up in a timely manner, shall not be arbitrarily placed or thrown down, passing objects are strictly prohibited to throw; 8. rainy and snowy days for work at height, must take reliable anti-skid, cold, and anti-freezing measures, where water, ice, frost, snow should be removed in a timely manner; for work at height of the towering buildings, should be set up beforehand to avoid lightning facilities, and the construction site must be stopped. In the event of more than 6 strong winds, fog and other bad weather, to stop open-air climbing and suspended elevated work, snowstorms and typhoons and rainstorms, should be timely to check the safety of work at height facilities one by one, found to have a loose, deformation, damage or dislodgement and other phenomena, should be repaired immediately to improve; 9. Because of the operational necessity, the temporary demolition or change of safety protection facilities must be agreed to by the person in charge of the construction and the adoption of appropriate and reliable measures 10. protection shed erected and dismantled into, should be set up a cordon area, and send a person to monitor, strictly prohibit the demolition of the upper and lower at the same time; 11. high-rise work safety facilities of the main force bar, mechanical calculations in accordance with the general structural mechanics formula, the strength and deflection calculations in accordance with the current relevant norms, but the calculation of the strength of the steel bending member does not take into account the effects of plasticity, the structure should be consistent with the requirements of the corresponding norms currently in force. The second edge and hole work safety protection 1. edge of the high work, must be set up to protect measures, including the perimeter of the base edge, has not yet installed railings or railings of the balcony, platforms and platforms around the perimeter of the canopy and eaves edge, no external scaffolding roof and floor perimeter and water tanks and water towers around the perimeter of the place, and in line with the following provisions: the first wall height of more than 3.2 meters around the two floors, as well as the height of the height of the external scaffolding more than 3.2 meters around the floor, the first wall height of more than 3.2 meters, as well as the height of the external scaffolding more than 3.2 meters around the floor. The perimeter of the first floor wall height exceeds 3.2 meters, and the height of the floor without external scaffolding exceeds 3.2 meters, must be set up in the periphery of the safety net a; layered construction of the stairway and ladder section side, must be installed temporary guardrail, the top stairway should be followed by the engineering structure of the formal protective railing; derrick and construction elevator and scaffolding and other buildings on both sides of the channel must be set up to protect the railings, the ground level access to the upper part of the safety protection should be equipped with trellis, double-cage derrick channel in the middle, should be separated from the closure; a variety of vertical All kinds of vertical transportation receiving platform, in addition to both sides of the protective railing, the platform should also be set up at the mouth of the safety gate or activity protective railing.