Mechanical equipment typhoon emergency plan (selected 5)
In daily life or work and study, there will inevitably be accidents, in order to reduce the consequences of accidents, often need to be prepared in advance for the preparation of emergency plans. Emergency preparedness should be how to prepare it? The following is my mechanical equipment for you to organize the typhoon emergency plan (selected 5), I hope to be able to help you.
Mechanical equipment typhoon emergency plan 1
I. Purpose:
The establishment of flood prevention, typhoon rescue emergency plan, through the training of the emergency response detachment and hands-on training, to strengthen the management of the service area to prevent flooding and rescue the ability of the danger occurs when the danger is more effective and timely exclusion, to reduce the loss to a minimum, to ensure that the flood, typhoon rescue emergency plan. To ensure that the flood control and typhoon rescue work is foolproof.
Second, the responsibility:
management director for flood prevention, typhoon rescue commander-in-chief;
management supervisor for the deputy commander-in-chief, responsible for the full range of equipment group;
security host for the deputy commander-in-chief, is responsible for the full range of work of the rescue group;
environment host for the deputy commander-in-chief, is responsible for the full range of logistics group;
the environment host for the deputy commander-in-chief, is responsible for Logistics group of the overall work;
control center is responsible for the accurate communication of information, coordination;
management office of all off-duty staff for flood prevention, typhoon rescue emergency response team members.
Third, the division of group responsibilities:
3.1 rescue group: by the safety host and not on duty all the safety members of the group
3.1.1 to take all the measures to deal with the danger;
3.1.2 responsible for flood sandbags filling, handling and stacking;
3.1.3 Utilizing various ways and means to remove dangerous situations in time. p> 3.1.4.4 safety organizer to lead the rescue team to take all other effective methods to do all kinds of rescue work.
3.2 equipment group: by the management office supervisor and management office of two technicians.
3.2.1 is responsible for all kinds of pumps and power supply equipment on;
3.2.2 technical guidance on the scene of the rescue;
3.2.3 on-site equipment for emergency repair.
3.3 Logistics group: consists of environmental organizers, housekeeping attendants, lifeguards, front desk attendants, cashiers, clubhouse attendants.
3.3.1 Guarantee the normal supply of various types of relief supplies;
3.3.2 Responsible for on-site rescue of the injured;
3.3.3 Actively assist the other groups;
3.3.4 Personnel division of labor
3.3.4.1 Unduty two five post is responsible for the protection of logistics supplies;
3.3. 4.2 front desk attendant, cashier, clubhouse attendant is responsible for the evacuation of people and rescue the injured, transfer the injured to a safe location and timely report to the municipal emergency center;
3.3.4.3 lifeguards and domestic helpers are responsible for the rescue of property.
3.4 On-duty personnel
4.1.1 The on-duty personnel shall promptly notify the center and the shift supervisor on duty after discovering the dangerous situation;
4.1.2 The duty officer of the center shall take measures such as emergency assembly after receiving the information and convene the personnel who are not on duty to dislodge the dangerous situation in time;
4.1.3 The duty officer of the center shall notify the manager of the Management Office and the supervisor of the Management Office and the
4.1.4 The center watchman should inform the positions on duty;
4.1.5 The positions on site should do a good job of order maintenance and personnel and vehicle diversion;
4.1.6 The center watchman should pay close attention to the situation on the scene, and if necessary, seek other support.
4.1.7 Before the arrival of the typhoon, the management office positions need to carefully check the post range of potential safety hazards, and timely elimination of dangerous situations, the situation is serious and timely report to the superiors.
Note: All members must obey orders, follow the command; all members of the rescue. In the process need to pay attention to their own safety.
Mechanical equipment typhoon emergency plan 2
(a) the division of responsibility for each position
1, the Security Department seriously do a good job of storm emergency ` information transfer, resource deployment and related logistics support work.
2, engineering and maintenance departments are responsible for water supply and drainage, power supply, air conditioning, elevators and other electromechanical equipment ` fault and emergency treatment.
3, the property services company security and fire department is responsible for the "three defenses" and security, volunteer fire and other emergency response, and is also responsible for disaster relief work.
4, cleaning and greening department is responsible for greening, environmental protection and disaster recovery work.
(B) typhoon flood prevention and emergency treatment
1, the property services company received a typhoon or rainstorm warning signal notification, should be immediately mobilized urgently, the departments in a state of alert, while the establishment of the command team manager as commander-in-chief, the department heads as members of the three prevention of the temporary command, the relevant personnel should be implemented 24 hours a day. Duty system, make good preparations for flood control and flood relief.
2, before the typhoon or rainstorm, should do a good job of windproof, waterproof flooding measures, such as: emergency windproof, waterproof flooding work, close the doors and windows of the public ****, check and clean up the flood equipment, facilities, advertising signboards, flower pots and so on.
(1) Check whether all doors and windows, especially double-glazed doors, are adequately protected and stabilized.
(2) Secure all loose objects, especially those located on rooftops and terraces, and move or tie down objects that are easily blown over, such as flower pots.
(3) Check all drains, manholes, stormwater drains, etc. and remove garbage, sand and debris that may cause blockage.
(4) Ensure that all emergency equipment is readily available, such as sandbags, raincoats, helmets, water boots, ropes, backup lighting, square logs (for securing glass doors), etc.
(5) Check whether the drainage pump system is normal and smooth.
(6) Check whether the power generation system and its oil supply device are normal or not, and test drive the generator set according to the regulations.
(7) Turn off the neon power.
(8) Intelligent system equipment for normal operation.
(9) After the inspection, found that the problem is solved in a timely manner, if the problem can not be dealt with, should immediately report to the leadership.
3, in the event of a typhoon, rainstorms, the security guard on duty to windproof, waterproof immersion key areas and parts of the strengthened patrol, check the status of the doors and windows, such as issued by the window glass broken, as fast as possible to rush to the scene, and with the temporary sealing of the plate. Engineering Department maintenance staff centralized standby, all levels of management services staff to hold their positions, if there is a complaint of equipment failure as well as the discovery of potential accidents should take urgent measures to solve them in a timely manner.
4, staff at all levels to assist maintenance technicians to do a good job of flooding and drainage of water.
5, in the typhoon, flooding and other natural disasters and accidents, to prevent the occurrence of crime cases.
(C) post-disaster treatment
After the typhoon, thunderstorms, the Ministry of Engineering to organize the maintenance of people in the equipment and facilities under the jurisdiction of the inspection, found that the damage and timely repair. Cleaning Department to check the damage of the tree situation, and to restore, and strive to minimize the impact of the disaster. The property manager reported to the general manager of the company in a timely manner on the damage and losses.
Mechanical equipment typhoon emergency plan 3To ensure the safety of all teachers and young children's lives and property, to ensure the healthy and harmonious development of education and sports, to do a good job in the prevention and disposal of rainstorms, floods and typhoons, to ensure that the rescue and relief work is carried out in a scientific, orderly and efficient manner, and to improve the comprehensive emergency response capacity of flood and typhoon prevention and disposal. According to the Zichuan District Bureau of Education and Sports documents, combined with the actuality of our park, specially formulated this plan.
First, the establishment of the flood and typhoon rescue and relief leadership group
Leader:
Deputy Leader:
Members: teachers of all classes
Second, the emergency leadership group division of labor
Leader's responsibility: Under the leadership of the relevant departments of the higher level, carry out the implementation of the district's emergency management system. Under the leadership of the department, the implementation of the district flood control and typhoon rescue and relief flood control headquarters instructions, the overall command of the Zihe Center Kindergarten rescue and relief work.
Deputy head of the responsibility: according to the kindergarten risk, put forward the drainage, rescue program. Timely reporting to the central school security office, analysis and summary of the disaster, to provide a scientific basis for decision-making team leader. According to the instructions of the team leader, command the rescue team to carry out rescue. Organize enough emergency supplies to be delivered to the rescue school site. Contact the medical department, mobilize medical personnel, medical equipment, medical teams to participate in the school rescue and relief work. Contact the public security department to maintain school traffic order, organize the evacuation and transfer of young children and garden staff.
Members of the responsibility
1 comprehensive grasp of the disaster and all kinds of dynamic news, according to the important information reporting system in the first time to send important information about the disaster, to ensure that the information channel is open.
2 is responsible for checking the implementation of disaster prevention measures in the class, to maintain the normal order of teaching and activities in the class.
3 in accordance with the requirements of the higher level, do a good job in the park disaster relief work, to stabilize the mood of the children, so that all the work is carried out smoothly.
3, the implementation of the flood season, the typhoon during the schools responsible for the emergency measures to strengthen the flood control and rescue efforts.
1. According to the "who is in charge, who is responsible for" principle, the organization of flood and typhoon working group, the implementation of the necessary rescue measures, strict implementation of flood and typhoon work.
2. Pay attention to listen to and record weather forecasts, take precautions in a timely manner, close doors and windows and electrical equipment in a timely manner.
3. In case of danger, disaster, should be based on the work plan, the organization to carry out rescue work, and immediately reported to the next level.
4. The implementation of leadership, 24-hour duty, immediately on duty, flood and typhoon prevention work, and waterlogged sections of the erection of a temporary walkway, to quickly and independently rescue, to ensure the safety of young children.
Mechanical equipment typhoon emergency plan 4A. Guiding ideology:
Typhoon, rainstorm prevention work is related to the lives of teachers and students and national property safety important work, in order to effectively protect the safety of teachers and students and property safety, enhance the kindergarten flood control and prevention of typhoon disposal capacity, in line with the "prevention-oriented, safety first" principle, the development of the plan.
II. Preventive steps:
1, the leading group list and contact number
Leader: Bi Yijun director
Members: Gong Fei logistics team leader
Yao Yihua director of preservation
Zhang Yan, chairman of the labor union
The kindergarten started the flood control plan, the implementation of the 24-hour leadership, 24 duty system.
III. Emergency measures:
1. Strengthen the communication of information, to achieve the upper situation, the lower situation reported.
In the event of a major flood, all the leaders in place, flood control and Taiwan work leading group began to operate; the leaders in charge of flood control and Taiwan work leading group to report on the flood; the full deployment of anti-Taiwan flood control work.
2. Prevention-oriented:
Clear the corridor. Before the typhoon landed, the balcony, corridor debris, flower pots, etc. should be cleaned up to prevent the typhoon landed, was blown down by the wind to hurt people.
Close the doors and windows. When a typhoon or rainstorm comes, the wind and rainfall are large, so you should close the doors and windows to prevent the wind and rain from damaging the doors, windows, furniture and causing casualties.
The janitor of the whole school sewer and the main catchment well to carry out a comprehensive dredging.
Unclogging of gutters and downpipes on school buildings and houses, and pruning and strengthening of large trees throughout the school.
A comprehensive safety check of lightning protection facilities and outdoor wiring on all school buildings.
Comprehensive safety inspection of outdoor antennas, air conditioning outdoor units, and external hangings.
Indoor power supply, sockets, doors and windows of all departments to do a comprehensive inspection.
When circuits and wires are interrupted due to a typhoon, power switches should be turned off and emergency lights, torches or candles should be activated.
IV. Safeguards:
After the plan is activated, the kindergarten to do a good job of early warning and information records. Convene an emergency meeting, in the shortest possible time, by telephone and other forms of kindergarten flood control and Taiwan work deployment, inform the Taiwan flood dynamics, the arrangement of flood control and Taiwan, rescue and relief requirements and tasks.
At any time with the higher departments and units to maintain close contact, strengthen information communication, to do the upper situation, the lower situation reported.
Mechanical equipment anti-typhoon emergency plan 5
In order to effectively do a good job in the town of xx xx hazardous rock body unstable slopes and half of the mountain hazardous rock body unstable slopes geologic disaster point prevention and control, maximize the reduction of accidental disasters, to avoid the masses of personal safety and property suffered losses, is now combined with the town of the actual situation, and specially formulated the following emergency rescue plan.
A disaster point situation
(a) xx dangerous rock body unstable slope
xx dangerous rock body unstable slope is located in the town of Liyang Longshan Temple back of the mountain, the top of the mountain there are a few bumps of dangerous rock, affecting the safety of the Longshan Temple people and property. In the event of prolonged heavy rainfall may occur landslides, in the event of prolonged heavy rainfall timely notification of the evacuation of people in the Longshan Temple.
(B) half of the mountain dangerous rock body unstable slope
half of the mountain dangerous rock body unstable slope is located in the town of Liyang Xiaolongshan south, the half of the mountain is almost vertical, the surface of the surface of a lot of raised rock, very easy to fall, dangerous rock near the Huangshan City Special Police School and residential houses. In case of prolonged heavy rainfall may occur landslides. The first thing you need to do is to get a good look at the color of the skin and the texture of the skin, and the color of the skin.
Second, the emergency work leading group
Leader:
Deputy Leader:
Members:
Third, the emergency response and action
(a) Emergency personnel
Detecting: xx
The person: xx
The person: xx
The person: xx
The person: xx
Settlement: xxContact: xxx
Transfer personnel: Shi Chengzhong
(B) emergency response team: xxx
(C) emergency material reserves
The town's flood control and disaster relief materials mainly include: 12 sets of raincoats, steel helmets, 12, folding rechargeable recording shouting microphone 4, shovels 10, sacks 100, sand A number of. The above flood control materials stored in the town equipment room, by comrade Lin Tianyou unified deployment.
(D) emergency response:
1, the town of flood control and disaster relief leading group held a meeting, an urgent briefing on the jurisdiction of the disaster and disaster relief work, analyzing and predicting the possibility of larger disasters, the deployment of the jurisdiction of the disaster relief work. Immediately the jurisdiction of the disaster and disaster relief work reported to the district people's government and the district flood control and drought relief headquarters, requesting support from the district government.
2, the organization of the town staff according to the degree of urgency of the flood season, the use of telephone, cell phone text messaging, shouting microphone and other means of flood information to inform residents in a timely manner; special emergency situation or power supply, communication interruptions, divided into households to notify the residents of disaster-prone points, especially at night when the relevant disaster may occur, to ensure the reliability of information transfer, so as not to omit a household, not to omit a person.
3, emergency personnel according to their respective job duties and tasks, received a disaster weather forecast, to be on standby at all times, not to go out, received a collection of orders, should be rushed to the designated location within 15 minutes, in accordance with the command of the rescue organization.
4, the release of the disaster. The town command office to summarize the disaster, reported to the district flood control and drought relief headquarters.
Fourth, the post-disaster relief work
1, timely production and life of self-help work conference, quickly organize the restoration of production, life and other work.
2, seriously organize the work of disaster investigation and verification, focusing on the verification of the disaster caused by the collapse of the house, especially the total collapse of households and other special victims of the loss.
3, according to the verification of the disaster, the development of disaster relief programs, step by step implementation.
Fifth, the basic requirements of flood control and rescue work and work discipline
1, the leading group of flood control and disaster relief office in the implementation of flood control during the twenty-four-hour duty system. Strict work discipline, conscientiously do a good job of duty records, timely reporting down. Command members in the flood control period, if there is something out of the need to leave the local, must be approved by the unit principal, and arrange for their own responsibility within the scope of the flood control work.
2, the person in charge of flood control and disaster prevention work is responsible for, must ensure that the phone is open 24 hours a day, the arrangements for the jurisdiction of the duty duty, supervise the duty record, duty handover and other work, found that the danger should be reported within 30 minutes, shall not be delayed rescue work.
3, where the flood duty and flood rescue and relief work, negligence, irresponsibility, reporting delays or personnel are not in place in a timely manner, we must seriously investigate the responsibility of the relevant personnel; caused serious consequences, the main responsible person shall be held accountable according to law.
;