Hazardous materials management and disposal management regulations:
1. Types of hazardous wastes: Waste mineral oil (HW08): oily waste cotton yarn, waste gloves; waste emulsion (HW09); dyes and paints waste (HW12): paint residue, thinner barrels, paint drums, waste activated carbon, ink residue waste; photographic material wastes (HW16): waste developer, fixing solution, asbestos wastes (HW36): waste developer, asbestos wastes, asbestos wastes, asbestos wastes, asbestos wastes, asbestos wastes, asbestos wastes. Asbestos waste (HW36), etc.
2. Storage of hazardous waste
3. Disposal of hazardous waste: Hazardous waste disposal is entrusted to a unit with hazardous waste management qualification, and sign a contract of entrusted disposal, and no unauthorized dumping and piling of hazardous waste.
Storage requirements
1, the storage place ground must be hardened to prevent leakage. The place should have a canopy, cofferdam or wall, set up waste water conduit or channel to prevent leakage of waste liquid leakage.
2, different types of hazardous waste should be categorized storage, prohibit mixing. There are obvious intervals (such as aisles, fences, etc.).
3, prohibit open storage of hazardous waste, hazardous waste room roof closed to prevent dispersion, and locked to prevent loss.
4, the collection of hazardous waste stored in a timely manner to the hazardous waste room, while the establishment of hazardous waste storage accounts, truthful records of hazardous waste storage and disposal.
5, the storage place should be set up warning signs, hazardous waste containers and packaging must be affixed with hazardous waste identification mark, equipped with weighing equipment.
6, the storage period of hazardous waste shall not exceed one year, the extension of the storage period, need to be reported to the environmental protection department for approval
Enterprises dispose of hazardous wastes on their own need for conditions:
Construction of solid waste projects and construction of storage, utilization, disposal of solid waste projects, must be carried out in accordance with the law of the environmental impact assessment, and to comply with the national environmental protection construction projects management.
Units generating hazardous wastes must dispose of them in accordance with the relevant provisions of the state, and may not dump or pile them up without authorization; if they do not dispose of them, the competent administrative department for environmental protection of the local people's government at or above the county level of the place where they are situated shall order them to be corrected within a certain period of time; if they do not dispose of them within the period of time or if their disposal does not conform to the relevant provisions of the state, the competent administrative department for environmental protection of the local people's government at or above the county level of the place where they are situated shall designate a unit to dispose of them for them on behalf of the state. The relevant provisions of the state on behalf of the disposal.
Units generating, collecting, storing, transporting, utilizing or disposing of hazardous wastes shall formulate precautionary measures and emergency plans for accidents and record them with the administrative department for environmental protection of the local people's government at or above the county level where they are located; the administrative department for environmental protection shall carry out inspections
Legal basis
The Law of the People's Republic of China on the Prevention and Control of Environmental Pollution by Solid Wastes
Article 19 Units and other producers and operators collecting, storing, transporting, utilizing, and disposing of solid wastes shall strengthen the management and maintenance of the relevant facilities, equipments, and premises, and ensure their normal operation and use.