2023 Detection work summary 5 articles

2023 Detection Work Summary Part 1

In July 20__, I graduated from ___ and joined the work in the same year.In July 20__, I was employed by the company as an assistant engineer, and in January 20__, I passed the title of ___ engineer. Since the current position, I am mainly engaged in highway engineering testing and inspection, technical services, scientific and technological research and development and related professional and technical work. Over the past few years, I based on their own duties, love and dedication, hard work, with strong professionalism and dedication, hard-working, proactive, practical style, hard thinking, clear thinking, can combine practical work with theoretical research, and actively contribute to the long-term development of the unit's own wisdom and strength.

First, the main work performance

1, do a good job in the daily management of the laboratory, to ensure that the normal operation of the equipment, test report data accuracy.

In the company I am responsible for traffic engineering, aggregates, asphalt mixtures, geosynthetics, etc. all 14 functional test room, in the maintenance of equipment and daily testing and inspection formed a set of more perfect management mode. Laboratory **** more than 200 sets of test equipment, for some of the use of high frequency, fragile equipment I developed a more detailed maintenance plan, to achieve special operations, specialists regularly maintenance, over the years the laboratory equipment running well, calibration calibration qualified to ensure that all types of test data objective and accurate; in the daily test and inspection, I led the section personnel in accordance with the requirements of the company's procedural documents, strictly control all aspects of the test and inspection, the test and inspection. Strictly check all aspects of the test, training a large number of excellent test personnel. 5 years, my company in the Ministry of Transportation, the provincial Department of Transportation and Communications Organization 's various types of engineering materials than the results of the test are satisfactory, for the healthy development of my company has laid a good foundation.

2, innovative technical services, improve the level of technical services, escorting the quality of the project.

In recent years, I have been responsible for leading colleagues to complete the ___ highway, ___ highway, ___, from the raw material testing, proportion design, test section paving to the normal stage of the whole tracking service. Technical service process, we give full play to the collective wisdom, active innovation, rigorous and realistic, in the specification requirements of the Marshall design method based on the use of the Bayley method, high-performance asphalt pavement (superpave) method, such as verification, and a variety of materials and a variety of proportioning ratio performance verification, in the asphalt mixture of high and low temperature performance has accumulated a large amount of data in response to the site of the material source changes, In response to the changes in the field material sources, construction process influencing factors such as the solution of the problem has been better applied to the commissioning unit to solve a large number of technical and construction problems, for the smooth progress of the project has laid a good foundation for the level of technical service has been commissioned by the unit and the owner of the project is fully recognized and praised.

Second, scientific research

In recent years, as the person in charge or the main personnel have participated in the implementation of the company's scientific research topics of testing and inspection and professional and technical services.

The above three topics are the first practical application of new materials in our province, through the later monitoring and testing to prove that the project have achieved the desired purpose.

Since joining the work, and strive to learn the theoretical knowledge of the profession and professional skills, and attach importance to constantly improve their business level and ability. Through years of hard work, my professional skills and business work ability has been greatly improved, for better completion of various work tasks laid a solid foundation, but also recognized by the leadership. Since 20__ to 20__ year for five consecutive times by the company as the annual "excellent staff", in all kinds of professional journals published "___", "___", "___", "___", "___" and other academic papers.

Third, continue to learn

In order to better adapt to the current work, in an effort to do their jobs at the same time, I actively study, participate in various types of continuing education, in order to improve their own business level. In obtaining __, in December 20__, to participate in the Ministry of Transportation and Communications organized by the supervision engineer safety and environmental protection education training and examination pass, in February 20__ to participate in Shandong Province highway engineering test and inspection personnel continuing education training examination pass.

In the future work, I will certainly be more active in learning, and constantly improve the work methods, improve work efficiency, down-to-earth, conscientious, hard-working, and strive to become an excellent engineering technology professionals.

I promise: the personal information and supporting materials provided are true and accurate, and I will take responsibility for the consequences of providing relevant information and documents that are inaccurate or in violation of relevant regulations.

20__ I was transferred to the ___ as a test and inspection engineers, in the leadership of the support and active cooperation with colleagues, in line with the "strict supervision, enthusiastic service, impartiality, meticulous" principle, the successful completion of this year's engineering testing work, is now summarized as follows: < /p>

First, I have been working on the project, and I am very pleased to be able to help you with the project. /p>

First, constantly improve the rules and regulations

Since the resident office into the field, for the needs of the project and the requirements of the contract conditions, and actively buy test equipment and instruments, installation, debugging, calibration, apply for temporary qualification of the site, and constantly improve the test implementation rules, supervision of the rules and regulations, a variety of charts on the wall, by the provincial quality inspection station acceptance of the first time through, with the construction of the preparatory phase of the test conditions. The test conditions in the construction preparation stage. In the construction of the resident laboratory at the same time, supervision, check the contractor into the test personnel, equipment to meet the construction and contractual requirements and the development of the work, and require the contractor to establish a sound quality self-inspection system, to lay the foundation for the smooth start of construction.

Second, strictly follow the specification requirements

Before the start of construction, first of all, in accordance with the design drawings and specifications, the contractor put forward a variety of raw materials, concrete ratio, soil and lime soil standard compaction standards, verification tests, so that the indicators are to meet the requirements of construction specifications and design drawings for the overall construction to provide a reliable and accurate test basis.

Third, do a good job of material quality control

Material quality control, quality control of our test supervision is the focus of quality control, qualified products is the prerequisite that must have qualified raw materials, which I engaged in the construction of highway projects the most personal experience, the quality of the material factory certificates of quality and the site into the material type, specification, date of delivery and other verification, the contractor's self-inspection and supervision of the control of sampling, investigation and retesting of suspect materials. Suspicious material investigation and retesting are the main content of our daily material quality control work, and refuse to enter the construction site of unqualified materials.

Fourth, strict control of the construction process

Construction process control, each sub-project or single project before the start of the construction, the supervision of the test personnel on the concrete ratio test confirmation, before construction, the construction process at any time to observe the ease of concrete, always within the scope of the design requirements, to ensure that the concrete of the intrinsic quality of the contractor and the supervision at the same time to produce a representative of the concrete test specimens as one of the indicators of quality control of the project. As one of the quality control indicators of the project.

V. Work experience

20__ year is about to pass, looking back on this year's supervision work, the deepest experience is to do a good job of supervision, we must be strict and conscientious, have a strong sense of responsibility, no matter how complex the project as long as the supervisors are able to meticulously in accordance with the construction specifications, regulations to perform their duties, can fully grasp the entire project dynamics, control the entire quality of the project, while the supervisor has a high level of quality, and the project is not only to ensure the quality of the project, but also to ensure the quality of the project, the contractor has a high level of quality. At the same time, the supervisory staff has a high quality of business, it can be every process, every link, to do beforehand tips, the possible quality problems nipped in the bud, and may cause quality hazards in advance to prevent the link, both of which are very helpful to our supervision work will be a powerful impetus to our work.

Six, shortcomings and improvement measures

Although we have been working hard to do every job, but there are still shortcomings, poor supervision of the external control, the phenomenon of chaotic filling of the internal data from time to time, according to the existence of problems to remind us to continue to study the construction specifications, test procedures, familiar with the design drawings, improve the level of business and their own qualities, and strengthen supervision! Strength, increase the frequency of sampling, at any time to grasp the dynamics of construction, construction quality control.

In the __ project office, the director of the office of the strong support and the contractor's active cooperation, as always, to do a good job of supervision of the test work, the task is arduous, the project is large, more stringent requirements for our test work, which requires us to do a test personnel to do the control beforehand, to put an end to after the fact processing, holding a serious attitude towards the work, with a strong sense of responsibility, and fully familiar with and master the business Knowledge and skills, to make up for past deficiencies, strictly good quality of engineering materials into the field, construction site quality inspection, as a good guardian of project quality, for ___ company in ___ construction to establish a good corporate image.

2023 Detection Work Summary Part 2

At the beginning of the job, coincided with the center of the cma metrological certification work is in full swing. Because it has not been engaged in testing work before, so it really is from nothing to start the work. Undertook the asphalt and asphalt mixture two categories of parameters. This also fully reflects the center's leadership of my trust. Because asphalt and asphalt mixture two categories of parameters, parameters and complex, practical difficulties. And before many years did not carry out related business, the relevant information is generally not complete, can also be said to be a newborn calf is not afraid of tigers, it can also be said that the ignorance of the fearless, although I do not understand, I also took a copy of the specification from scratch to make up for the record of the form, testing rules, operating procedures, training records, etc., and finally in the support from the project to come back to the former Zeng Qianqian's assistance in the handling of practical operations, and ultimately, without any risk through the The company's website has been updated with the latest information on the company's website, including its website.

After the completion of cma certification, water transport certification began, during the period, because Mr. Xu water transport certification work is busy and irreplaceable, according to the center of leadership arrangements, to take over the geotechnical room, which has a long history of inheritance of the section. Due to the delay in the production of the previous license change, resulting in a large number of soil samples backlog, while the commissioning unit is eagerly waiting for the results, while there are a large number of new soil samples kept sending over. The production pressure is very big. In the face of difficulties, all colleagues in the geotechnical room flow operation, cyclic testing, daily open samples, to achieve full-load operation, a single week to complete 140 groups of soil samples, so adhere to a month and a half, and finally digested all the backlog of soil samples and new delivery of soil samples.

After the geotechnical laboratory on track, soon ushered in the center of 19 years, the first major event, comprehensive a certificate. Our geotechnical room in not affecting the normal production at the same time to complete the center arranged to meet the inspection of the work, and finally submitted the report and field practice have successfully passed the examination, did not disgrace the reputation of the geotechnical room.

In the production blitz after the synthesis of A, according to the center of leadership arrangements, to go to the road room to assist in the road test work, completed the Yichang, Changzhang, Changshaolou, Changyue Expressway external and part of the internal work. Back to the material room to assist Minister Tang to complete the adjustment of the unit price of indoor testing related work, in the Du General Manager, Mr. Dai's full support, although a few twists and turns, but still realized the unit price increase. It is also a good start for the subsequent development of the material room.

In addition, while working, I passed the examination of testing engineer and secondary structural engineer without any risk.

In summary, into the center of the year, is a full and busy year, but also a year full of harvest, but also a year of personal learning to improve, can do all of these, all rely on the center of these excellent leadership and colleagues, thank you again for a year of support and help. Thank you all.

2023 Detection Work Summary Part 3

In order to do a good job of epidemic prevention and response work, the city branch set up an epidemic prevention and control work leading group, by Liu Liao Feng, president of the city branch as the leader, the city branch of the other leaders of the bank as deputy leader, leading group members of the city branch of the main departments responsible for each branch of the counties and districts of the branch president; the work of the leading group. The leading group set up an office under the leadership of the xx vice president as the leader, xx vice president as deputy leader, the municipal branch office, trade unions, three rural financial business unit, personal finance department main person in charge of the members. And the development of a special emergency plan, requiring each level of sub-branches, compared to the city branch to set up a leading group and office, a special study of the unit of the epidemic prevention and control work, according to the party committees and governments at all levels of the unified arrangements, according to the municipal branch of the plan, according to the local conditions, the development of a special emergency plan and the immediate start.

In accordance with the municipal party committee, the municipal government and regulatory authorities, the deployment of the parent bank, co-ordinate the arrangements for the business work of the outlets and outlets security protection work, and effectively protect the health of employees and customers, to maintain normal business order.

First, pay close attention to the local epidemic situation, make timely adjustments to the business hours of the key areas of the business outlets, and do a good job of customer announcements.

Secondly, the business places are equipped with medical masks, hand sanitizers, disinfectants and other safety supplies, as well as infrared temperature testers. The business personnel through the body temperature test normal after the duty, business on duty personnel wearing masks, and do a good job of hand cleaning and other personal hygiene. Spray the ground with 84 disinfectant solution after dilution, wipe the self-service machines and hall keyboards with medical alcohol, and fully disinfect the business hall at least three times a day according to the flow of people. Emphasis on frequent contact with outsiders place protection, such as customer reception room, lobby guide desk, counter, etc..

The third is to do a good job of answering questions, publicizing and explaining disputes to customers, doing a good job of customer service and security, and effectively guaranteeing the normal operation of the outlets. The company's main goal is to provide the best possible service to its customers," he said. The fourth is that in order to facilitate customers to handle donations through the Bank's mobile banking and personal online banking, the Bank exempted all interbank transfer transaction fees for mobile banking from January 27 to April 30, 20xx, and exempted interbank transfer transaction fees for single transactions of 50,000 yuan (inclusive) or less for personal online banking.

In order to fully cooperate with the prevention and control of the new coronavirus-infected pneumonia epidemic, play a good financial services to protect the epidemic prevention and control of an important role:

First, do a good job in the fight against the epidemic personnel financial services. For medical and nursing staff, government workers and their immediate family members fighting on the front line of the epidemic, we provide personal credit loan (including the preferential loan, provident fund credit consumer loans, etc.) services, and can enjoy the most favorable interest rate within the scope of the branch's authorization.

The second is to extend the repayment period for special people. For people affected by the epidemic who have temporarily lost their source of income, the credit policy is appropriately tilted to flexibly adjust the repayment arrangements for personal consumer credit such as housing mortgage, reasonably delay the repayment period, and apply for a maximum of six months of loan interest suspension.

Third, with the relevant overdue interest relief work. The company's newest product is a new, more advanced version of its original product, which is now available for sale in the U.S. and other countries, including the U.S. and Canada.

Fourthly, for the wholesale and retail, accommodation and catering, logistics and transportation, aquaculture, culture and tourism industries which are greatly affected by the epidemic, the loans will be "not drawn out, not broken, not suppressed", and if the customers have difficulties in repayment, they can be prioritized in accordance with the relevant requirements of the loan rollover. If the loan expires and the customer still has a need for money, it will be renewed in a timely manner in accordance with the relevant requirements, and will be given a certain `interest rate preference'.

Fifth, the application of new customer service, to ensure business continuity. For customers with loan needs, first guide eligible customers to go online loan application channels, minimize offline contact;

For urgent use of money and can not get loans through online channels, simplify the investigation process, reported to the head office for the record, to be the end of the epidemic to supplement the relevant procedures;

For the epidemic prevention and control to provide support for the medical equipment and other industries, to open up the green channel

The city's leading cadres at all levels of the branch stick to their posts, implement grid-based management of personnel throughout the jurisdiction, clear straight-line management responsibilities, and do a good job of caring for employees. The staff education reminder in place, accurate grasp in place, before the epidemic is effectively controlled do not arrange to travel to the epidemic concentrated area, do not convene a meeting of the epidemic concentrated area personnel, do not organize all kinds of large-scale meetings, marketing activities and other large-scale gatherings of activities. Both strict defense, but also not excessive panic, in the prevention and control of the epidemic to grasp the work, to ensure that all levels of the normal working order of the organization.

Strengthening emergency duty, strict implementation of 24-hour duty and leadership system, to ensure smooth communication. In case of problems and emergencies such as confirmed or suspected cases in the jurisdiction, the first time to report according to the regulations, and the implementation of the whole bank "zero report" system.

Postal Savings Bank XX City Branch insists on maintaining a high degree of consistency with the municipal party committee and municipal government's decision-making and deployment regarding the response to the epidemic, analyzes the situation in a timely manner in accordance with the announced development of the epidemic, responds to the risks scientifically, strengthens publicity and guidance, strengthens the publicity of the risk of the epidemic and the knowledge of prevention and control, and constantly raises the awareness of the whole bank's safety precautions, strengthens publicity and guides the customers to use the bank's various electronic channels to carry out their business. The Bank has strengthened publicity to guide customers to use the Bank's various electronic channels to conduct business, and guided employees to pay attention to cold protection, indoor ventilation and personal hygiene, and to avoid going to crowded places. The company's main goal is to provide the best possible service to its customers, and to provide the best possible service to its customers in the future.

2023 Detection Work Summary Article 4

Over the past year, I conscientiously abide by labor discipline, on time attendance, effective use of working time; stick to their posts, need to work overtime to complete the work on time overtime to ensure that the work can be completed on time. Seriously study knowledge; have a strong sense of responsibility. Proactively study the quality control lab technician professional knowledge, work attitude is correct, serious and responsible for each job.

Second, the work position and work ability

My work position is a tester, an important position to grasp the quality inspection of the project. I am aware of the importance of my work, said I in line with the "do a better job" goal, do a good job, and in the work of my efforts to learn professional knowledge to enrich their own, although in the work of many setbacks but I believe in myself. As the saying goes, "from where you fall, from where you get up" I'm still very young in line with the idea of the stupid bird fly first, I believe that as long as I pay more than others can certainly make up for the lack of professional knowledge of my experimenter in the quality control.

Third, summed up the work of the year, although a little bit of success, they have made great progress, but there are still the following shortcomings:

1, sometimes work with the leadership of the requirements of the gap. On the one hand, due to personal ability and quality is not high enough, on the one hand is the workload, and time is relatively tight, the work efficiency is not high. Work is not strong sense of responsibility, a little sloppy.

2, sometimes work sensitivity is not very strong. The leadership of the matter is not sensitive enough, sometimes the work is not in advance, not timely enough to report the situation.

3, in the workplace play is not obvious. The whole section of the work of the situation is not fine, but also can not take the initiative, early to think of ways, many of the work can only be regarded as general.

4, is in the social aspect I still have a great lack of, sometimes the heart of the expression can not ...

2023 Detection Work Summary Part 5

Time passes, the years shuttle, in the blink of an eye 20_year in the tension and busy in the past, looking back at the 20_years, I as the company's quality control department an inspector, there are many progress, but there are also some shortcomings. Six months, in the leadership of the care and guidance, in the support of colleagues to help, I not only diligently and pragmatically complete the work, but also the successful completion of the leadership of the various temporary tasks assigned by the leadership of their own in all aspects of the enhancement. In order to do a better job in the future, sum up the experience, draw lessons, I summarize the first half of the work of the following items:

First, professional ethics

Since entering the company, I abide by the company's rules and regulations, to the factory as a home, and adhere to only do what is good for the company, but also y appreciate the "people and business *** development

Second, professional knowledge, work ability and specific work

1, professional knowledge in the six months, I more fully understand the nature of the company's products and testing methods, learning the detection of fertilizers, so that my professional knowledge is more abundant, the level of detection has also improved.

2, the ability to work in these six months, my management ability to improve, thanks to the leadership of my trust and support, let me have been serving as a team leader of this position, so that I have a deeper and broader understanding of the detection work, broaden my knowledge and improve my ability.

3, specific work

(1), the daily testing work in the first half of 20_ years, I have been doing testing work. 1-4 months, I am responsible for incoming materials, production process and warehouse deployment process samples of the test. At that time is the busy season, every day there are 5-6 chili powder shipped to my company, there are 5-6 batches of chili particles in the processing plant caused, plus sporadic incoming materials and the process of sample testing, every day too busy, but also often overtime. That period of time is tense and exciting, although the work is very busy, but are relatively smooth completion, basically no delay in the company's production because of the test.

5-7 months, the inspection staff regrouped, I was assigned to the incoming materials group, responsible only for the incoming materials testing, and then because of the incoming chili powder gradually quite a lot, my work is not so busy. During this time, I did some other work, such as workload statistics, ten days report, monthly report, overtime summary and registration, quality report, evaluation of group members, laboratory work arrangement for the next production quarter, statistics of the first layer of glassware, looking for the relevant personnel to deal with the residual problems after the upgrading of the u8 and so on.

(2), testing experiments in this half year I did 2 testing experiments: First, the 4 # solvent extraction chili pepper grain effect experiment, the 4 # solvent after 2 times and water 1:4 mixing and separation, can be basically removed from this 4 # solvent solvent in the part of the water to achieve the original 4 # solvent and the original 4 # solvent is basically the same as the extraction effect. Second, the loss of color value experiment, mainly done red chili, paprika at 43 degrees, 37 degrees, refrigerator placed in the conditions of the color value of the change, paprika in the workshop placed in the process of the loss of chili powder, concluded that red chili, paprika at 43 degrees, 37 degrees, refrigerator placed in the night, the color value did not change, and paprika in the workshop placed in the process of the loss of color value of the experimental conclusions of the serious.

(3), Xinjiang staff and the second workshop staff training in May-June Xinjiang Chenguang company's several employees and the second workshop of the two employees to the laboratory training, during this period I was responsible for their part of the color, spiciness, content, soluble residues and other training and assessment work. They basically mastered the laboratory routine testing in a short period of time, to achieve the purpose of training.

Summarize the work of six months, although there is a certain progress and achievements, but there are still shortcomings in some areas, such as: the company's new products do not know enough, as a team leader of the management of the lack of experience, the individual work is not perfect, which is to be improved in the future work. In the future work, I will work harder, learn more, improve their own quality in all aspects, keep up with the pace of development of Chenguang company, for the development of the company to contribute their own strength!