Time flies like an arrow, years like a shuttle, in the blink of an eye 2014 is about to pass, looking back on this year's work, I'm in the company's leadership and the support and help of all my colleagues, and to strictly require themselves. In accordance with the requirements of the company, better complete their own work, so that I have made new progress in theory and practice
Practice and other aspects, fundamentally get rid of the past can only bury their heads in the sand, do not know the phenomenon of summarizing experience. Now the work of this year is summarized as follows:
One, daily work
1, love their own work, work attitude is correct, serious and responsible, able to correctly and seriously treat every job. Repeatedly every day to do the inspection, equipment switch, health cleaning work looks very boring and dull, even the usual holiday breaks are not, but I have no complaints, the work needs to give up the point of sacrifice a little bit of that and how. No matter how big or small, if you don't take small things seriously will cause irreversible consequences. The work is trivial, but in order to do a good job, I'm not afraid of trouble, to the leadership to ask for advice, to colleagues to learn, their own practice, and seriously study the relevant business knowledge, and constantly improve their theoretical level and overall quality. I stick to my position and strictly require my team members to abide by the labor discipline and rules and regulations. Seriously, on time, and efficiently complete the tasks assigned by the leadership of the Division.
2, but also actively cooperate with colleagues in other sections to do a good job, and in other colleagues have something to be able to take over. For example: the pump room of the plant to clear the work of the garbage, the original plan was to ask people outside the clear, because of the relevant reasons people do not do, so the leadership of the plant under the leadership of the whole plant personnel actively cooperate with the pump room in 2 days to clean up the garbage, and the maintenance of the pumps. There is also the maintenance of 3 # 4 # biological pool, the rectification of coarse grating, 1 # two sinking pool guide rod scraper maintenance, plant lightning protection facilities installation, South Gate Pond pumping station to install 5 # pumps when the influent interceptor, contact centrifuge manufacturers, and with the maintenance section of the 1 # 2 # centrifuges repair work, so that the thickening workshop as soon as possible to return to normal sludge. Installation and debugging of pump dry protection device, so that the enrichment workshop equipment can be more secure, rest assured that the use of operation. And in the production operation of small problems can be dealt with in a timely manner, for example, rainy days, river water backflow can be made in a timely manner emergency solutions to ensure the normal indicators of the plant.
Two, learning
Actively discuss the weekly team meeting to discuss and learn, at any time to understand and listen to the spirit of the various meetings, and actively contribute to the timely discussion and solution of the daily work of all the problems. Proactive study of sewage treatment expertise. Encountering problems not afraid of trouble, to the leadership to ask for advice, to colleagues to learn, their own feel practice, and constantly improve their theoretical level and comprehensive quality.
Three, style
Can comply with the rules and regulations, solidarity with colleagues, pragmatic, optimistic and progressive, always maintain a rigorous work attitude and meticulous work style. Diligent, conscientious, hard-working, diligent, thrifty and patient, always do honestly and diligently.
In a year of work and study, the main gains are the following:
(1) learning with an open mind, diligent in practical operation, theory and practice, can skillfully do the work of the post.
(2) conscientiously, on time, efficiently do other work assigned by leaders at all levels. At the same time, I also actively cooperate with colleagues in other sections to do a good job.
Four, there are shortcomings and ways to improve.
Despite certain progress and achievements, but in some areas there are still deficiencies. For example, there are creative ideas for work is not a lot of individual work is not perfect, in the work of more careless, in the theoretical aspects of the understanding is still too little.
In the future, I will bring a solid work style, serious work attitude, mature work experience, and continue to overcome the shortcomings in the work. Strive to be a good employee and make greater contributions to the company!
Water treatment plant work summary (2)
2014 is the Yichun city center city sewage treatment plant into production and operation of the fourth year, in July-August this year, the maintenance department of our company carried out a large-scale overhaul and replacement of equipment throughout the plant, in the normal overhaul process there are some emergencies, resulting in ammonia nitrogen exceeds the standard, after a series of rectification at a later stage, at present, my plant is running After a series of rectification, the plant is now operating normally and the water output has reached the standard agreed in the contract. From the overall situation this year, whether from process control or personnel management or equipment operation, have made some progress and growth in the process of operation, in the city, the district leaders concerned about the company's leadership with the support of the leadership of the central city of Yichun sewage treatment plant throughout the year the production and operation of the basic stability of the plant, no major accidents occurring in the production of safety. Now the treatment plant this year's work is summarized as follows:
Operation Overview
1, process control
My plant 1-12 months of cumulative treatment of sewage treatment plant is expected to reach 13.2 million tons of domestic sewage, the average daily capacity of about 36,000 tons, the highest daily capacity of 44,000 tons, an average of inlet COD184mg / L, the effluent COD43.7 mg/L, the cumulative reduction of COD is 1852 tons; average influent ammonia nitrogen 22.5mg/L, effluent ammonia nitrogen 8.3mg/L, the cumulative reduction of ammonia nitrogen is 187 tons; January to December produced 2860 tons of residual sludge, *** consumed 1 ton of PAM flocculant, the average sludge moisture content is less than 80%, of which the 2860 tons of residual sludge has been transported to the landfill in Yichun District life Harmless treatment; January-December treatment plant *** total electricity consumption of 2.28 million degrees, the average monthly power consumption of about 190,000 degrees; average daily power consumption of 6,246 degrees, the average ton of water consumption of 0.173kw/h/ton.
We overhauled the aeration equipment in the reaction tank from the end of July to the end of August 2014, and after resuming the use at the end of the overhaul, the activated sludge in the reaction tank appeared to be lost and reduced to different degrees, resulting in the decline of biochemical treatment efficiency, and the effluent exceeded the ammonia nitrogen standard. After taking a series of restoration measures, our plant is running stably at present, and the average value of each index of the effluent water is as follows: CODcr36mg/L (standard value ≤60mg/L), BOD58.1mg/L (standard value ≤20mg/L), SS8mg/L (standard value ≤20mg/L), total phosphorus 0.3mg/L (standard value ≤1.0mg/L), ammonia nitrogen 4.0mg/L, total phosphorus 0.3mg/L (standard value ≤1.0mg/L), and ammonia nitrogen 4.3mg/L (standard value ≤1.0mg/L). Ammonia nitrogen 4.5mg/L (standard value ≤15mg/L), in line with the "urban sewage treatment plant pollutant discharge standards" (GB18918-2002) national level B standards.
2, equipment operation
Since October 2010 since the operation of the plant has been running for more than four years, in order to protect the treatment plant equipment safety, high efficiency, normal and sustainable operation of the equipment this year, a full range of overhaul of the equipment, replacement, in addition to the equipment in accordance with the instructions to do a good job on the parts of the oil lubrication and maintenance to extend the service life of the equipment, the main work that has been completed for: 3 Taiwan aeration fan lubricant and belt replacement; 3 sets of lifting pump lubricant replacement and check valve overhaul; 4 sets of reasoner replacement lubricant; mud press system to replace the lubricant and high-pressure cleaning system; 8 sets of water valves and valve overhaul; 16 sets of return pumps and sludge pumps overhaul; 3 # aeration fan fan to replace the fan blades; 3 # decanter to replace the hydraulic screw; ultraviolet disinfection equipment to replace the lamps, casing and ballasts; on the Biochemical pool aeration disk for a comprehensive overhaul, replacement; biochemical pool online monitoring equipment (sludge concentration meter, dissolved oxygen meter, level meter) for a comprehensive overhaul, replacement,; completion of the sewage plant of the pool next to the protective railing painting, anticorrosion work; improve the centralized control system and so on. I plant according to the actual operation of the problem, and gradually improve the equipment and facilities operating procedures, and all staff training to ensure that the normal operation of sewage treatment plant facilities and equipment.
3, laboratory analysis
Water treatment plant laboratory through the incoming and outgoing water quality to carry out various testing work, guidance with the operation. According to the laboratory monitoring results show that: January to August this year, my plant is running stable, the water basically meets the standard, in September, October water ammonia nitrogen appeared in part of the period of time exceeding the standard phenomenon, laboratory in the routine testing of water quality on the basis of increasing the frequency of testing of ammonia nitrogen in the water out of the various pools, to provide a basis for technological adjustments. From the end of October this year, the water gradually returned to standard, the current pool is running normally, the pollutant indicators are up to discharge. In addition, the laboratory monthly with the Yichun City Environmental Protection Bureau monitoring station on the water quality of sewage plants to take pieces of monitoring; with online monitoring equipment, operation and maintenance of online monitoring equipment to do comparison tests to ensure the accuracy of the equipment; in addition to doing a good job in the daily testing and analysis of the treatment plant at the same time, the laboratory also undertakes the reporting of relevant data.
4, other
This year, the plant received foreign visits and leaders at all levels of departmental inspections up to more than 10 times, each time we strive to meet the best state of the inspection and visit the task of the leaders at all levels of the issues raised by us to actively rectify the problem of good advice to be actively adopted. On December 2 this year, the municipal government, Mayor Bai, the district government Lu District Governor, the park director Zhang, the city environmental protection bureau Zheng, the district environmental protection bureau high director and so on led a group of experts to visit our plant, in listening to the work of the sewage treatment plant report on the basis of the actual operation of the plant on-site inspections, the rectification of the situation of the plant and the operation of the plant have given a full affirmation of the situation, the group of experts has also put forward valuable for the operation of our plant The group of experts also put forward valuable opinions for the operation of the plant.
Two, personnel management
1, personnel training
Currently, the sewage treatment plant on duty 18 personnel, including 3 managers, operating duty personnel 8, 2 laboratory tests, 1 financial, electrical maintenance 2, 1 procurement, 1 chef. This year, combined with the actual operation of the treatment plant, through the form of coaching + examination, the organization of the whole plant personnel training 6 times, 1 assessment. Through a series of training and assessment, on the one hand, so that the whole plant staff a more detailed understanding of the plant's operation of the process and the process will have a greater change in the factors affecting the process, so that in the daily operation of the operation in a timely manner to control the various process parameters; on the other hand, also improves the staff's professional and technical knowledge and operational level, for the construction of a professional wastewater treatment plant staff team to lay a better foundation.
2, control system
Institutionalized, standardized management is the main direction of the development of sewage treatment plants, this year, I plant to develop and improve a series of rules and regulations, including the position of job responsibility system, production safety management system, shift handover system, the system of accountability for dereliction of duty, sanitation management system, the system of morning meeting, laboratory management system, canteen management system, duty record filling system and operation report management system. In addition, according to the actual operation situation, the company has improved the operation procedures of equipment, various reports and production materials. Through the implementation of the above series of rules and regulations and standardized procedures, the management of the plant is a step forward, laying a solid foundation for the normal operation of the future.
Three, the second phase of the project construction
1, the second phase of the project progress
Due to the needs of Yichun city development, the second phase of the project, which has been launched by the plant, is expected to invest 65 million yuan, mainly to build two CASS tanks, a grille room and ancillary equipment, piping and electrical installation works. The second phase of the project in June 1, 2014 officially started construction, has invested a total of 38 million yuan, the two CASS biochemical reaction pool civil construction is completed, the main project of the fine grille room has been completed, the remaining grille room decorative decoration is expected to be completed before May 20 next year, the rest of the second-phase supporting the civil part of the project will be completed and equipment installation before May 30, about 8 The end of the month to complete all the work, and strive for September to start water, commissioning, operation.
2, the current focus of the work of the second phase of the project
Currently has entered the winter, due to the geographical and climatic factors in Yichun City, it is not appropriate to continue construction, the current focus of the work of the second phase of civil engineering winter protection work for the next year's work to lay a good foundation for the implementation of the measures we are prepared to implement are:
1, the outer wall using gravel and soil non-expansion materials such as backfill 2 meters;;
2, the outer wall with a sandy soil and other non-expansion materials.
2, the inner pool wall paste 1.2m high insulation board, pool water injection 3m deep; 24-hour manned inspections, broken, cut the pool ice water on the pool wall of the internal pressure.
3, exposed beams and columns around the use of insulation board or insulation cotton cover protection.
4, pool and pool wall around the device protection railing and warning signs, strengthen the daily management and maintenance.
5, track the weather at any time, according to the specific circumstances, take appropriate precautions, in strict accordance with the implementation of my company's project department wintering program implementation, maximize the safe and smooth transition through the winter.
Four, 2015 work ideas
2015 for Yichun city center sewage treatment plant is an extraordinary year, next year, the second phase of the project will enter into formal operation, when the entire sewage treatment plant will reach 100,000 tons of daily capacity, more pressure on behalf of more power, after this year's overhaul of the whole plant equipment, we believe that in the new year, in the city, the district, the leadership at all levels and the company's leadership. We believe that the new year, in the city, district leaders at all levels of concern and support of the company's leadership, our staff will, as always, go all out and do our best to complete the new year's tasks and work objectives, to ensure that the sewage treatment plant stable operation, normal operation of the equipment, the discharge of water to meet the standards for the cause of sewage treatment to hand over a satisfactory answer sheet.