Local people's governments at or above the county level to organize housing and urban-rural construction, ecological environment, water administration and other departments to prepare the administrative region of urban drainage and sewage treatment facilities construction planning.
Local people's governments at or above the county level shall incorporate urban drainage and sewage treatment into the national economy and social development planning, territorial spatial planning, the implementation of integrated planning, supporting the construction. Article IV of the provincial people's government department in charge of housing and urban-rural construction is responsible for the supervision and management of urban drainage and sewage treatment in the province.
The local people's governments at or above the county level to determine the competent authorities of urban drainage and sewage treatment (hereinafter referred to as the competent authorities of urban drainage) is responsible for the supervision and management of urban drainage and sewage treatment within the administrative area.
Other relevant departments of the local people's governments at or above the county level are responsible for the supervision and management of urban drainage and sewage treatment in accordance with the provisions of these Regulations and other relevant laws and regulations, within their respective areas of responsibility for the work related to the supervision and management of urban drainage and sewage treatment. Article 5 Any unit or individual has the right and obligation to use and protect urban drainage facilities in accordance with the law, the violation of these regulations have the right to stop and report.
The units and individuals who have made outstanding contributions to urban drainage and sewage recycling work, by the local people's governments at or above the county level in accordance with the relevant provisions of the state to give recognition. Chapter II planning and construction of Article 6 local people's governments at or above the county level, the competent department of urban drainage shall, in conjunction with the relevant departments, according to law, the preparation of urban drainage and urban sewage treatment planning, planning content should include precipitation, water, reclaimed water and comprehensive utilization of sludge disposal, etc., reported to the people's government of this level for approval after the implementation of the organization and the people's government of the next level of urban drainage department for the record.
Towns prone to flooding, should also be prepared for the prevention and control of urban flooding special planning, and into the administrative region of the urban drainage and sewage treatment planning.
Local people's governments at or above the county level shall improve the collection rate of urban sewage in the administrative region and the treatment rate. Article VII new urban drainage facilities should be implemented rainwater, sewage diversion. The original rainwater, sewage combined urban drainage facilities, shall be in accordance with the requirements of urban drainage and sewage treatment planning, rainwater, sewage diversion or rainwater collection facilities.
Prohibit any unit or individual sewage pipe and rainwater pipe mixed. Article VIII of the new construction, reconstruction and expansion of urban drainage and sewage treatment facilities projects, should be prioritized for the construction of sewage collection system. Construction of urban sewage treatment facilities, should be used in line with national standards and stable and reliable, economic and energy-saving new technologies, new techniques, new materials, new equipment.
New construction, alteration, expansion of urban drainage, sewage treatment facilities, projects should be approved in accordance with national regulations of the basic construction procedures, and urban drainage and sewage treatment facilities connected to the construction project, should be in accordance with the relevant national technical specifications for the design and construction of construction projects.
New construction, alteration and expansion of urban outfalls shall be set up by the competent ecological and environmental authorities with jurisdiction to review and agree to ensure that the outfalls are set up in line with the water function zoning, water resources protection planning and flood control planning requirements. Article IX of sewage treatment facilities project construction scale and process design into the bidding documents before the construction unit shall organize the relevant industry registered practice experts for evaluation, the evaluation experts shall sign the evaluation documents in accordance with the law, and is responsible for the evaluation opinion. The construction unit is responsible for the conclusions of the evaluation report, the implementation of the construction scale and process design of the design unit is responsible for the quality of the design. Construction units, design units and construction units shall not change the winning construction scale and design process, local process optimization adjustments should be reported to the competent authority for urban drainage validation.
Provincial people's government departments in charge of housing and urban-rural construction, in conjunction with the relevant departments in accordance with the relevant provisions of the state and province to issue incentives and elimination of sewage treatment process guide directory, and regularly updated.
Sewage treatment facilities project construction scale, emission standards, process design should be adapted to local conditions and pragmatic. Construction scale should be based on the resident population, the actual amount of sewage discharged and other factors to determine the scientific evidence; discharge standards based on the local sewage water quality, water quality, the environmental capacity of the receiving water body to determine; process design should be given priority to the use of mature and advanced, low-cost, low-energy technology solutions, government investment projects should be prioritized to encourage the selection of class guidance directory.
Sewage treatment facilities project process special acceptance should be incorporated into the project completion joint acceptance. Article X centralized sewage treatment facilities in cities and towns and supporting pipeline network has been covered by the region, no new septic tanks and related activated sludge interceptor tanks, ponds, the original has lost the functional role of septic tanks, should be removed in the transformation of old neighborhoods.
Not covered by urban drainage and sewage treatment facilities in residential areas, scenic spots, tourist attractions, resorts, airports, railroad stations and other areas of discharge of domestic sewage and economic development zones, independent industrial and mining areas, such as discharge of sewage, wastewater discharge units should be in accordance with national or local standards for the establishment of medium-sized and small-scale wastewater treatment facilities for wastewater treatment to ensure that their discharge of sewage in line with the pollutant emission standards. standards.