In China, the diversification of the export direction of electrical products, so that Europe, Australia, Southeast Asia and other regions of the importers have to put forward such as GS (Germany), BEAB (British), IMQ (Italy) and other safety certification and CE marking requirements. And most of the whole plant in the certification process and these requirements into zero, the requirements of their respective electrical safety parts supplier manufacturers to ensure that they get a high level of safety certification mark, which is more and more parts manufacturers want to get the VDE logo outside the promotion of the reason.
Test areas where VDE is applicable
- Electrothermal and electric appliances
- Data processing and medical equipment
- Lamps and electronic products
-Lamps and electronic products
-Cables and insulating materials
-Installation equipment and control devices
-Electronic components
-These are the areas to which VDE applies. -Electronic components
-EMC testing
VDE certification process
?
1 Submit the official application form and structural parameter table --- is an important document to apply for VDE,
2 Application Confirmation --- VDE receives the official application form and structural parameter table, about 2-4 weeks to the application of the official written confirmation, and to send invoices, factory inspection questionnaires and other information.
3 Sample delivery --- VDE application is confirmed at the same time, will inform the specific requirements of the sample delivery and its testing based on the relevant standards. After the sample is completed, it must be self-tested or sent to the relevant domestic laboratory for prediction according to the standard requirements. After passing the prediction, the samples can be safely and accurately sent to VDE for testing by express mail.
1) The applicant will be notified as soon as all the test items have been passed.
2) The test results may also have defects. Some minor defects, the certification body communicated with VDE, as long as a small correction, do not have to re-send the sample, VDE will be able to issue a license.
3) When there is a significant defect in the test results, the certification body will discuss with the applicant the reasons for failure. If necessary, the VDE will be asked to test the failed samples sent back for reference and analysis. When the sample is modified and perfected for re-testing procedures, send the sample again until qualified. If the sample is re-sent within six months, the cost of re-testing will be much more favorable.
4 factory inspection --- sub-factory review before the issuance of certificates and certified factory review after a fixed or irregular supervision and review. Before the factory review, the certification body appointed experts to assist the manufacturer of production facilities, laboratory equipment, measurement and the entire quality system against the VDE requirements for self-check. If the review, the inspector puts forward the rectification requirements, to assist the manufacturing plant as soon as possible to discuss the rectification measures and the rapid implementation of the implementation until the re-inspection of qualified.
5 Issuance of certificates --- In the factory inspection successfully passed the premise, if the sample test passes, then VDE will notify the applicant of the results in a timely manner, VDE certificates will also be issued soon.
Documents to be submitted for VDE certification
1. product description
2. description of model differences
3. wiring diagrams
4. instructions in German
5. parts and materials lists
6. CB test reports
7. other required materials
VDE certification factory review
VDE in principle twice a year factory review. The content of the factory review mainly examines the consistency of the products and samples, but also at the same time to review the inspection procedures, records, measurement and other quality management documents.