The second is to strengthen safety management and carry out safety evaluation. Decompose the responsibility of safety objectives and implement them layer by layer, and formulate and implement the governance plan in time through key work such as safety assessment and self-examination. Strengthen on-site safety supervision, closely monitor key areas, implement tracking, supervision, analysis and reporting systems for weak safety links, and implement emergency plans for equipment failures. Strengthen on-site law enforcement, organize professionals to conduct a comprehensive inspection of the equipment status of the whole plant, and check violations and hidden dangers. At the same time, do a good job in accident prediction, dangerous point analysis and pre-control, find existing problems and make timely rectification to eliminate equipment defects and hidden dangers.
The third is to strengthen the preparation for gas turbine production and give play to the incremental role of new machines. Strengthen the preparation for the production and operation of No.2 and No.3 gas turbines, speed up the construction progress of gas turbine projects on the premise of ensuring the quality of gas turbine projects, and strive to achieve the production target of "two guarantees and three competitions" proposed by the group company within this year. 1 The gas turbine was officially put into operation on August 1 this year, which increased the power generation during the peak summer and effectively eased the power shortage in Zhejiang.
Fourth, strengthen the implementation of flood control work to prevent emergencies. All departments of the company conduct self-inspection on the flood control and typhoon prevention projects under their jurisdiction, incorporate the required flood control and typhoon prevention materials into the plan, and ensure that "personnel, measures and work" are in place. Strengthen flood control inspections in key areas such as main workshop, oil pump pit, ash yard and circulating water outlet below zero meters; Define the responsibility areas of machine room, booster station, cable trench, coal yard, pump room and outdoor equipment; For the special climate where high temperature and rainy weather may occur, it is necessary to plan ahead and do a good job in moisture prevention, lightning protection, aging prevention, fire prevention and small animals prevention.
The fifth is to strengthen the management of coal burning and ensure the fuel supply. The fuel sector should establish a sense of the overall situation, handle the relationship between rising coal prices and power generation, and put power generation first. In view of the shortage of coal resources, rising coal prices, declining coal quality and other unfavorable factors, actively take countermeasures, seize the favorable opportunity, purchase high-quality and cheap coal, and control power generation costs; At the same time, we will focus on the receiving and unloading of incoming coal and the prevention of flood, waterlogging and spontaneous combustion in the coal yard to ensure the safe and stable operation of the unit.