References:
The specific amount of compensation and resettlement standards are different everywhere. For details, you should consult the local government land resource management department. Generally speaking, the local government's land resource management department and the price department will clarify the specific standard of compensation amount in the form of a joint document.
Additionally, the state's management of the conversion of agricultural land into construction land is extremely strict, so if arable land is expropriated, the first thing to look at is whether the construction party has gone through the relevant procedures. If you have not done so, you should immediately report the case to the local land management and law enforcement authorities.
Unit: yuan/mu
Compensation Name Compensation standard Compensation unit price
Water field Calculated on the basis of the average annual production value of 1,162 yuan of water field in the three years before the project occupancy, and the land compensation fee for each mu of water field will be calculated as six times of the annual production value 6972
Dryland Calculated on the basis of the average annual production value of 756 yuan of dryland in the three years before the project occupancy, and the land compensation fee for each mu of dryland will be calculated as six times of the annual production value 4536
Adidland The land compensation fee for each mu of dryland is calculated at 6 times of the annual production value 4536
Garden land The land compensation fee is calculated at 50% of the compensation standard for paddy field 3486
Economic woodland The land compensation fee for economic forest is calculated at 50% of the compensation standard for paddy field 3486
Timber woodland The land compensation fee for timber woodland is calculated at 40% of the compensation standard for paddy field 2789
Timber sparse land The land compensation fee for thinning land is calculated at 30% of the compensation standard for paddy field 2092
Timber forest 2092
Unforested woodland Unforested afforestation land is compensated at the rate of open woodland 2092
Water ponds 70% of the unit price of paddy field compensation 4880
River beach land Steep slope land 70% of the unit price of dry land compensation 3175
Wasteland Ridges 20% of the unit price of paddy field compensation 1394
Schedule II
Resettlement subsidy standard
Unit: yuan/mu
Compensation Name Compensation standard Compensation unit price
Water field Calculated according to the average annual production value of water field of RMB 1,162 yuan in the three years prior to the occupation of the project, and the resettlement subsidy for the labor force of each acre of water field is calculated at 6.78 times of the annual production value. 7878
Dryland Calculated according to the average annual production value of dry land of RMB 756 yuan in the three years prior to the occupation of the project. Calculated on the basis of the average annual output value of 756 yuan in the three years before the occupation of the dryland, and the labor resettlement subsidy per mu of dryland is calculated at 6.78 times the annual output value. 5126
Garden land Resettlement subsidy is calculated with reference to that of paddy land. 7878
Economic forest land Resettlement subsidy is calculated with reference to that of paddy land. 7878
Timber woodland Resettlement subsidy is calculated at 50% of the resettlement subsidy for paddy land. 3939
Open forest land Resettlement subsidy is calculated at 50% of the resettlement subsidy for paddy fields 3939
Underwooded forest land Resettlement subsidy is calculated according to the standard for open forest land 3939
Water ponds Calculated at 70% of the unit price of compensation for paddy fields 5515
Steep slopes on river banklands Calculated at 70% of the unit price of compensation for dry land 3588
Unit: yuan/mu
Land type Average annual output value (yuan) Compensation standard Compensation amount Description
Spaddy field 1162 Half-year 581 1. Half-year compensation for costs already invested before transplanting rice seedlings, and compensation for one year after transplanting rice seedlings; 2. This compensation includes green fertilizers, rice straw, field legumes, and spring harvest crops.
One year 1162
Dry soil 756 Half a year 378 1. Crops with a short growing period will be compensated for half a year, while those with a long growing period will be compensated for one year; 2. Crops with a multi-year growth period will always be compensated for one year.
One year 756
Root-root ponds (fields) 1000 half-year 500 1, half a year within half a year after the fixed dill, more than half a year to make up for one year; 2, part-time fish farming will not be compensated.
One year 1000
Professional fish ponds 1500 One year 1500
General ponds Compensation at 60% of the average value of neighboring paddy fields 1. General ponds refer to part-time fish ponds that are used for both irrigation purposes and stocking of fish; 2. Reservoirs are compensated at 50% of the value of general fish ponds; 3. Ponds that are used only for irrigation and not for fish farming are not compensated.
Schedule V
Forestry Compensation Standards
Unit: Yuan/mu
Compensation Name Unit Unit Price (Yuan) Remarks
Garden Land Mu 3600 Calculated on the basis of 60 mandarin oranges per mu
Economic Forest, Timber Forest Mu 500
Thinning Forest, Unconsolidated Forest Land Mu 200
Schedule VI
Sporadic Fruit Tree Compensation Standards
Compensation Name Category Unit Unit Price (yuan)
Citrus fruiting plants 60
Unfruiting plants 15
Miscellaneous fruiting plants 50
Unfruiting plants 15
Economic trees young plants 10
Elderly trees 30
Manufactured timber trees young plants 5
Mature trees 10
Bamboo clusters (roots) 5
Old and valuable trees 500
Schedule 7
House demolition and self-build compensation standards
Unit: yuan/m2
Category of housing structure Compensation amount
Steel and concrete (a) Steel-reinforced concrete, beams and slabs as load-bearing members, walls and so on, as transferring and protecting members, plywood wooden doors and doors, and so on, with the exception of the following: (1) steel and concrete, beams and slabs as load-bearing members, walls and so on, as transferring and protecting members, plywood wooden doors and so on. components, plywood wooden doors, aluminum alloy windows, interior wall paint, exterior wall tiles, ceramic tile floor, water, electricity and sanitary equipment, the height of the ground floor is 3.6 meters, the height of the floor level is 3 meters, and the service life of the house is within 5 years. 410
Steel Mixed (2) Reinforced concrete, beams and slabs as load-bearing members, walls etc. as transferring members, plywood wooden doors, aluminum alloy windows, paint on the interior walls, ceramic tiles on the exterior walls, cement flooring or partially ceramic slate tiles on the floor, water, electricity and sanitary equipment, with the height of the ground floor being 3.6 meters, and the height of the floor of the building being 3 meters. 390
Brick and concrete (a) Sleeping brick walls or partially reinforced concrete columns for load-bearing, plywood wooden doors, aluminum alloy windows, interior wall paint, exterior tiles, porcelain slate tile floors, complete water, electricity and sanitation equipment, a ground floor height of 3.6 meters, a floor storey height of 3 meters, and a housing life of less than five years. 320
Brick and concrete (II) Sleeping brick walls or partially reinforced concrete columns bearing loads, painted single-storey wooden doors, glass windows, all internal and external walls whitewashed; concrete floors, complete water, electricity and sanitary equipment, storey height of 3 meters, and the useful life of the house is within 5 years. 310
Brick-concrete (3) Sleeping brick walls or partially reinforced concrete columns bearing loads, single-storey wooden doors, glass windows, all internal and external walls whitewashed, cement floors, storey height of 3 meters, and the useful life of the house is outside 10 years. 280
Brick and wood (a) internal and external 24 cm eyelet wall or 18 walls, all internal and external walls plastered, single-storey wooden doors, glass windows, green tile roof, cement floor, average height of front and rear diameter walls 3 meters. The service life of the house is within 10 years. 240
Brick and timber (ii) Half-brick walls inside and outside, single-storey wooden doors, glass windows; green tile roof, cement floor, average height of front and rear diameter walls 3 meters. 230
Wooden house All wood, triple mud floor, slate walls, average height of front and rear diameter walls 3 meters. 179
Earth house Includes earth and wood structure, four walls surrounded by earth bricks, average height of front and rear track walls 3 meters. 160
Miscellaneous Houses (a) Red brick dormer walls with prefabricated flat roofs or green tile roofs, average height of front and rear track walls 2.2 meters. 65
Miscellaneous Houses (2) Earth bricks, earth construction, miscellaneous bricks and bamboo and wood frames, simple doors and windows, average height of front and rear diameter walls 2.2 meters. 55
Schedule VIII
Housing Purchase Price Standard
Unit: Yuan/m2
Category Housing Structure Unit Price
Steel Mixed (I) Same as Self-demolished Self-built Houses 451
Steel Mixed (II) Same as Self-demolished Self-built Houses 429
Brick Mixed (I) Same as Self-demolished Self-built Houses 352
Brick (2) Same as self demolition self-build 341
Brick (3) Same as self demolition self-build 308
Brick and timber (1) Same as self demolition self-build 264
Brick and timber (2) Same as self demolition self-build 253
Timber house Same as self demolition self-build 197
Earth house Same as self demolition self-build 176
Timber house Same as self demolition self-build 176
Miscellaneous houses (a) Same as self-demolished and self-built houses 77
Miscellaneous houses (b) Same as self-demolished and self-built houses 55
Schedule IX
Accessory Building Compensation Standards
Compensation Name Unit Unit Price (yuan) Remarks
Sunbathing M2 10
Fence M2 15
Water well 300
Wells Well mouth 300Sink M3 80
Hot water stove 150
Processing stove 150
Biogas tank mouth 1500
Septic tank mouth 1500
Household single collector 50
Gatehouse 5000
Steel reinforced concrete frame M3 450
Stone masonry dam M3 70 Foundation due to the suspension of work on the power station
Cellar mouth 200
Processing machine 50
Schedule 10
Agricultural and sideline facilities compensation standards
Compensation name Unit Unit price (yuan)
Wooden mill, water mill 10,000
Brick kiln 5000
Sandpit, sandpit, and other facilities
Wooden mill, water mill 10000
Brick kiln 5000
Brick kiln 5000 <
Sand quarries 20,000
Schedule XI
Small water conservancy and hydropower facilities compensation standards
Name of compensation Unit unit Unit price (yuan)
Electric irrigation stations 20,000
Machine wells 5,000
Hydroelectric pumping stations 50,000
Channels 20000
Dam 10,000
Water dams 10000
Dam 10000
Schedule XII
Infrastructure Compensation Standards
Name of Compensation Unit Unit Price (yuan) Remarks
1. Site leveling No subsidy for unified leveling arrangement
Backyard area 1800
Outlying area 2500 Including outlying households of the rural areas and market towns
2. Indoor Subsidies for water and electricity 300
3. Drinking water for people and animals
Backward area 100
Outward relocation area 600 including rural and market town outward relocation households
4. Relocation roads Backward area 100
Schedule XIII
Compensation standards for relocation and transportation costs
Compensation name Unit unit unit price (yuan) Remarks
Transitional living subsidy people 600
Transitional living subsidy people 600
Transitional living subsidy people 600
Transitional living subsidy people 600 p>Transitional living subsidy 600 Compensation for the production and resettlement population only
The backward area 500
The outward relocation area 1000 Including the outward relocation population of the rural area and the market town
Individual processing station 300
Individual commercial household 300
Village defense station 200
Individual medical household 200
Rural public house M2 10 10
The compensation rate of the rural public house M2 10
Regular price (yuan) Remarks
<Owners, unmarked coffins 200
Owners, marked coffins 300
Owners, marked coffins, graves 500
New coffins within 3 years 600
Schedule 16
Resettlement fee for productive people
Resettlement method Units (RMB) Remarks
The number of people who are engaged in industry is 8,000, while those who start a business are paid the resettlement fee. 8000 Founding enterprises, resettlement fees directly into the enterprise
Have soil resettlement people 8300 resettlement fees allocated to the village group of the resettlement, neighboring villages and neighboring groups transfer of arable land in accordance with the actual amount.
8000
Based on the "People's Republic of China *** and State Land Management Law": Article 27 of the national construction of the expropriation of land, the land unit to pay land compensation. Expropriation of arable land compensation fee, for the arable land was expropriated three years before the average annual production value of three to six times. The standard of compensation fee for the expropriation of other land shall be stipulated by the provinces, autonomous regions and municipalities directly under the central government with reference to the standard of compensation fee for the expropriation of arable land.
The standards of compensation for attachments and seedlings on the expropriated land shall be prescribed by the province, autonomous region or municipality directly under the central government.
The expropriation of vegetable land in the suburbs of a city, the land-use unit shall pay a fund for the development and construction of new vegetable land in accordance with the relevant provisions of the State.
Article 28 of the national construction of the expropriation of land, the land unit in addition to the payment of compensation, shall also pay resettlement subsidies.
The resettlement subsidy for the expropriation of arable land shall be calculated in accordance with the number of the agricultural population to be resettled. The number of agricultural population to be resettled shall be calculated according to the number of farmland to be expropriated divided by the average number of farmland occupied by each person in the expropriated unit before the expropriation. The standard resettlement subsidy for each agricultural population to be resettled shall be the resettlement subsidy for the expropriated arable land, up to a maximum of 10 times the average annual production value in the three years prior to the expropriation. The standard of resettlement subsidy for the expropriation of other land shall be stipulated by the provinces, autonomous regions and municipalities directly under the central government with reference to the standard of resettlement subsidy for the expropriation of arable land.