5 Templates of Labor Service Contracting Contracts

Labor service contract template 1

Party A:

Party B (foreman):

Party A Party Representative:

ID number:

Contact number:

Contact number:

Party B operates and undertakes labor dispatch, contracting Party A For some labor projects involving skilled workers, after friendly negotiation between Party A and Party B, the following agreement has been reached:

1. Contents of the Agreement: Party A will provide Party B with working sites and tools for skilled workers, and Party B will organize and dispatch employees to be responsible for labor work (Party B’s employees Must hold a valid ID card and be over 18 years old). The employees dispatched by Party B belong to Party B and are not employees of Party A. In labor dispatch, Party B assumes all legal responsibilities related to dispatched employees, including handling (social security, insurance, work-related injuries, medical care, labor contracts, etc.). Party A can provide social security medical care, and Party B will bear the cost.

2. The validity period of the agreement is from _________year____month____ to _________year____month____, *** months; others: .

3. Rights and obligations of both parties

1. Party A provides samples to Party B’s employees.

2. Party A provides room and board for the employees dispatched by Party B. There are 8 people in a dormitory. Party B’s personnel must cooperate and obey Party A’s arrangements.

3. Party A shall not fire Party B’s employees at will. If Party B’s employees disobey arrangements, fail to abide by Party A’s management rules and regulations, or commit serious violations of laws and regulations, Party A has the right to punish them in accordance with factory disciplines and regulations. Party B must pay the penalty amount in cash. Party A has the right to require Party B to fire or transfer Party B's employees out of the factory within a limited time period for those employees of Party B who refuse to reform despite repeated abuses. If Party B’s employees cause losses to Party A, Party B shall bear full liability for compensation.

4. Party A shall pay the salary of the personnel agreed in this agreement to Party B, provided that Party A supervises Party B's payment and distribution in accordance with regulations.

5. Party B is obliged to do a good job in the ideological and stable work of its employees.

6. Party B’s employees must obey Party A’s rules and regulations on life, accommodation, get off work and rest time, etc. during their service with Party A. If there is any violation of Party A’s various management rules and regulations, Party A will have to The right to impose penalties in accordance with Party A's relevant management rules and regulations, and notify Party B's management representative of the penalty documents when the final salary is settled.

7. Party B must purchase relevant insurance in advance before bringing personnel to Party A’s factory.

8. If Party B’s personnel are injured or killed while they are in Party A’s factory, Party A will not bear any responsibility, and Party B will bear all the responsibility.

1. Party B is obliged to ensure the health of its employees.

3. The wages of Party B’s employees are paid directly to Party B and not directly to Party B’s employees.

4. Cost settlement and wage payment methods

1. Project contracting unit price: Party A pays Party B a piece-rate _____________ piece-rate wage.

2. The settlement wages are calculated based on the piecework report records.

3. In order to ensure the rights and interests of both parties, Party A will settle the last month's salary to Party B in cash or transfer after Party B finally completes the project contract. Party A has the right to supervise Party B's work in the factory on that day. Pay all wages to all employees.

4. When the contract expires, Party A will settle all contract fees to Party B at once within one week (Party A must inform Party B one week in advance if it does not renew the contract).

5. Liability for breach of contract Party A and Party B shall strictly perform the rights and obligations stipulated in this agreement. If a breach of contract occurs, the matter shall be resolved through negotiation. If no agreement is reached through negotiation, the matter shall be adjudicated by the relevant arbitration institution or submitted to the court for judgment.

6. This agreement is made in duplicate, with each party holding one copy. It shall take effect with the signature (seal) of both parties and be legally binding.

Party A: ______________

Party B: ______________

ID number:

ID number:

Date: _________year____month____day____

Date: _________year____month____day

Labor service contract template 2

p>

The contract-issuing party; (hereinafter referred to as Party A)

The contractor; (hereinafter referred to as Party B)

In accordance with the (Contract Law of the People's Republic of China and the State) and relevant In accordance with the provisions of laws and regulations, in order to clarify the rights, obligations and responsibilities of Party A and Party B in the project contracting and ensure the comprehensive completion of the project tasks, this contract is signed after negotiation between Party A and Party B based on the principle of equality, mutual benefit and voluntariness.

1. Project overview

1. Project name; Earthwork construction in Yiyuan Coal Mine

2. Project location; Yiyuan Coal Mine

3. Project quantity; According to A.B The measurement data agreed by both parties shall prevail (actual cubic meter).

4. Project cost: The unit price for excavation, transportation and leveling of earth and stone is determined through negotiation between the two parties at 8.5 yuan per cubic meter, excluding blasting tax, and the dumping site .Maintenance is the responsibility of Party B, (blasting shall be completed by Party A itself).

5; The earth and stone transportation distance of the project is 1.2 kilometers and the depth is 40 meters. The excess part shall be subsidized by Party A to Party B.

Article 2 Price Factors

The excess part shall be subsidized by Party B. Party A is responsible.

Article 3. Project Settlement and Payment Methods

1. Project price settlement; both parties A and B shall conduct monthly *** measurements and calculations as the basis for final settlement.

2. Payment method: On the 30th of each month, both parties will measure and report the project quantities to Party A. Party A and Party B will make the approval before the 8th of the following month. During the construction process, the oil will be supplied by Party A. According to the local oil market Price, the highest current price cannot exceed 9,000 yuan / cash should be deposited into Party B's account. Party B will designate a financial person to settle the settlement with Party A. The settlement will be based on the project volume of 90 for the current month and 100 for the next month.

3. Party B pays Deposit to Party A

Article 4 Double Release of Responsibilities

1. Responsibilities of Party A;

1. Ensure that the construction party uses water and electricity after arriving at the site. The water and electricity bills will be borne by Party B, the roads are smooth, and there are enough temporary construction sites and parking spaces.

2. If there is any trouble caused by the masses, Party A will be responsible for handling it and coordinating with the relevant departments to solve the problem, creating a good environment for the construction team construction environment.

3. Party A sends representatives to introduce technology, quality supervision and inspection and related construction visas at the construction site. Solve problems that should be solved by Party A.

4. Project Party A shall notify Party B in writing three days before the change, and sign a supplementary contract or negotiate otherwise. Otherwise, the economic losses caused shall be borne by Party A, and the construction period, entry time and start time shall be postponed accordingly. If the construction cannot start, Party A shall Party B shall be compensated for all expenses incurred and paid in full.

5. (Except for force majeure factors or inspections by the competent authorities) Party B’s construction machinery transportation vehicles are delayed or stopped due to Party A’s reasons, and Party A shall be held responsible Bear the responsibility and bear the corresponding expenses. The construction period will be postponed and Party B will be compensated for the loss of machinery. The excavator is 20--yuan/day, the dump truck is 1,000 yuan/day, the forklift is 800 yuan/day, the sprinkler truck is 500 yuan/day, and the labor fee is 200 yuan/day per person.

6. After the project is completed, Party A shall organize specialized personnel to conduct acceptance inspection within three days. The remaining project funds shall be paid in full RMB within seven working days. When the contract is terminated, Party A shall unconditionally return RMB to Party B within 7 days.

7. Party A is responsible for arranging accommodation for Party B.

2. Party B’s responsibilities

p>

1. Party B shall formulate feasible safety measures and specific construction plans, and strengthen safety education for on-site personnel. If a vehicle or personnel casualty accident occurs, Party B shall bear the responsibility, and Party A shall not be responsible.

2. Party B must obey the unified command of Party A’s construction personnel, organize vehicles reasonably, and ensure the successful completion of the construction period.

3. Apply for insurance for your own engineering team members, establish and organize a construction management team to solve various problems in an emergency.

4. All construction personnel of Party B including administrators . Drivers should undergo safety training and have corresponding qualification certificates before they can take up the job.

5. Always implement the fire protection work policy of (prevention first, combined with fire prevention and firefighting) during construction, and conscientiously implement (People’s Republic of China *** and the National Fire Protection Regulations) and other relevant regulations, incorporate fire protection work into the construction organization design and construction management plan, so that fire prevention work is consistent with production

6. Establish a safety responsible working group to solve problems in a timely manner and Notify Party A. Party A and Party B will cooperate with each other. If one party breaches the contract, the economic losses caused by the breach of contract will be fully borne by the breaching party as liquidated damages of 2% of the total project cost.

7. The soil should be discharged as designed. Carry out soil discharge according to the soil discharge plan to ensure the flatness of the soil discharge site and the elevation meets the design requirements.

8. Party B is responsible for the food, accommodation, personal and property safety of the personnel. If any problems occur, Party B will be responsible for it. Party A is not responsible for the solution.

9. This contract is not transferable and construction cannot be carried out according to the content stipulated in the contract. Party B will unconditionally withdraw from the project and bear all economic losses, otherwise Party A has the right to terminate the contract .

Article 5 Liability for Breach of Contract

The tasks are closely integrated and fire prevention measures are effectively implemented. If any safety accident occurs, Party B will be responsible for it and has nothing to do with Party A.

Article 6 Contract Disputes

All disputes arising during the performance of this contract shall be resolved through negotiation between the parties. If the negotiation fails, they may propose arbitration or file a lawsuit with the local people's court.

Article 7 Supplementary Provisions

1. This contract shall take effect upon signature and sealing by both parties.

2. For matters not covered in this contract, both parties may agree on a supplementary contract based on specific circumstances.

p>

Party A (official seal): _________ Party B (official seal): _________

Legal representative (signature): _________ Legal representative (signature): _________

_________ Year____month____day______year____month____day

Labor service contract template 3

Contract issuing party (hereinafter referred to as Party A)

Labor Contractor (hereinafter referred to as Party B)

In order to clarify the cooperation rights and responsibilities of Party A and Party B and ensure the safety of project implementation and related operating personnel, in accordance with the "People's Revolution of the People's Republic of China and the National Economic Contract Law, Labor Law and relevant regulations, the specific circumstances of this project, combined with the relevant provisions of the company's management charter, in order to clarify the rights, obligations and economic responsibilities of both parties, both parties A and B have unanimously agreed to sign this contract and *** obey.

Article 1: Project Overview

Project Name: _______________________________

Structure Type: _______________________________

Construction Area: _______________________________

Number of layers: _______________________________

Article 2: Contract scope, content and requirements.

1. As agreed by both parties, Party B’s labor contract for this project specifically includes:

Party B must neatly stack the materials used by it according to regulations, so that the site is clean of materials after the work is completed, and the site Civilized construction.

2. Construction period requirements

The construction schedule must be completed according to the construction schedule approved by both parties.

3. Quality requirements

The quality of the sub-projects contracted by Party B (constructed according to the existing construction drawings) must reach the "qualified" quality level and the perception is "good" , if the result cannot be determined at that time, all labor fees can only be settled after the acceptance of the main project is concluded.

Article 3: Safety Requirements

1. When Party B’s personnel enter the construction site, they must receive safety education, wear safety protective equipment, improve their own safety awareness, and strictly follow the operating procedures. . If any safety accidents or casualties occur due to violation of operating procedures, you will be responsible for the consequences. Party A will not bear any economic responsibility or civil joint liability, and Party B will be solely responsible for it.

2. Fights and brawls are strictly prohibited at the construction site. If they occur, regardless of whether they are justified or not, both parties involved will be fined 5,000 yuan each and sent to the local judicial department for handling. The consequences are at your own risk.

3. Party B’s personnel should take good care of property and semi-finished products, and compensate for the cost if damaged or lost; ensure safe production, civilized construction, and clean up the site after completion. Any costs such as loss, waste, rework of materials, etc. will be deducted from Party B’s salary.

4. Party B’s workers entering the site should pay relevant fees and go through all procedures in accordance with the regulations. Party B shall pay all relevant expenses that should be borne by Party B according to state regulations, such as job certificates, professional qualification certificates, insurance premiums, etc.

Article 4: Contracting form, price settlement method.

1. The contracting form is labor contracting.

2. Contracting price: For projects within the contracting scope, after acceptance evaluation, the price reaches ① yuan/square meter based on the actual processing area.

3. Settlement procedure

Party B shall settle the bill based on the actual square meters processed. Party A can advance Party B's living expenses during the process, and the remaining 20 yuan will be paid to Party B after the project is completed and inspected and passed the inspection. The remaining 20 yuan is a deposit. Party A will pay the entire balance after the rainy season has passed and there is no leakage.

Article 5: Rights and Obligations of both Parties

1. Rights and Obligations of Party A

(1) Party A has the right to complain against Party B’s violations If Party B fails to make rectifications within the time limit and causes economic losses to Party A, Party A has the right to unconditionally remove all on-site personnel of Party B, terminate this contract and not settle the unsettled labor fees for the completed projects of Party B, thus causing Party B will be responsible for all losses.

(2) Party A is obliged to provide materials on time according to the construction progress and budgeted quotas. (Note: The materials required by Party B must be submitted to Party A one week in advance)

(3) Party A is obliged to complete the technical briefing, leveling and setting-out work in a timely and accurate manner.

2. Party B’s rights and obligations

(1) Party B has the right to hire its own workers in accordance with the law.

(2) Party B has the obligation to equip the hired workers with various tools at hand.

(3) Party B shall be responsible for taking good care of its own people, verifying the identity of workers entering the site, and strictly prohibiting fights on site. If it causes casualties to itself or others, Party B has the obligation to bear financial liability, civil liability and joint liability.

(4) If Party B hires workers to work in violation of regulations and safety operating procedures, causing casualties to itself and others, Party B must be responsible for all consequences.

(5) Party B shall be responsible for the consequences of any fire caused by Party B or hired labor.

(6) Party B will be responsible for any losses caused to Party A or others due to theft by Party B or hired labor.

(7) Party B has no right to outsource light contracting projects. Special division (sub-item) projects must be subcontracted and must be subcontracted with the permission of Party A. Subcontracting can only be done after signing a subcontracting contract. Partial Party B shall be fully responsible to Party A.

(8) Party B is strictly prohibited from hiring child labor into the site for construction.

Article 6: Liability for breach of contract

Both parties to this contract shall not breach the contract. If there is a breach of contract, the breaching party shall bear the liability for breach of contract; and shall compensate the other party for its economic losses, especially quality breach, according to Implementation of relevant terms;

Article 7: Effectiveness and termination of the contract.

1. This contract will take effect when signed (sealed) by both parties and terminated upon settlement of the price by both parties.

2. This contract is made in triplicate (one copy each for Party A, Party B and the Engineering Project Department).

Article 8: Supplementary Provisions

1. If the terms of this contract conflict with the country’s current relevant documents and regulations on construction market management and the relevant rules and regulations of the contract, the parties shall negotiate based on the provisions of the documents. Sign a supplementary agreement separately.

2. Matters not covered in this contract shall be discussed separately by both parties. Party A's engineering project department is responsible for implementation.

Party A (official seal): _________ Party B (official seal): _________

Legal representative (signature): _________ Legal representative (signature): _________

_________year____month____day_________year____month____day

Labor service contract template 4

Party A: ID number:

Party B: ID number:

According to the "Contract Law of the People's Republic of China", "Construction Law of the People's Republic of China", " "Labor Law of the People's Republic of China", "Administrative Regulations of the People's Republic of China", and "Construction Project Management Regulations". Based on the principles of equality, mutual benefit, and good faith, Party A will hand over the steel bar project to Party B for construction. In order to clarify that Party A The responsibilities, rights and interests of Party B and Party B have been reached through friendly negotiation as follows. We hope that both parties will abide by it.

1. Scope of contract

(1) Pouring and curing of all concrete in the project (including basement indoor waterproof protective layer and basement indoor waterproof leveling layer).

(2) Party B will be fully responsible for taking over and dismantling the pipes.

(3) Party B is responsible for all brick moldings in this project.

2. Quality

(1) Inspect according to the current construction and acceptance standards, and the inspection quality pass rate is required to reach 100.

(2) During the construction of this project, if it is not caused by Party A, any fines for quality problems and progress problems caused by Party B during the operation shall be borne by Party B.

(4) Civilized construction must be carried out on site during all construction processes. Party B’s team leader must obey the arrangements and instructions of Party A’s management personnel and the company. For those who disobey the arrangements, the management of Party A has the right to impose a fine of 100 to 500 yuan on Party B each time. For serious cases, the team or individual will be removed from the site

3. Unit price and payment method

(1) Concrete pouring and maintenance *** 11.5 yuan/square meter (no repeated pricing). ±0.000 layer external overhanging board is not priced. The final settlement is based on the Sichuan Province 09 quota.

(2) The unit price of brick tire mold is 180 yuan/cubic meter. Plastering included.

(2) After the basement is finished pouring, 70% of the project payment will be paid to the second floor capping (the construction must be above the second floor before the Spring Festival in 2020). After the completion acceptance is passed, After the final accounts are completed, 70% of the total project price will be paid, and the payment must be made before the 30th of the next month. For houses above the second floor of commercial and residential buildings with low balances, the unit price above the second floor will be settled at 2,500 yuan per square meter. The final remaining balance of 30 RMB for the project was paid with Nike's shift room.

(2) Party B shall not make any other demands to Party A.

(3) Party B fully understands the contract conditions between Party A and the construction unit, and Party A shall not pay any fees during the construction process.

Note: Party B shall be responsible for all labor costs before the construction unit pays them. Party B shall ensure that all workers in the team are paid monthly wages.

If there is any disturbance caused by unpaid workers' wages every month, the company will be responsible for all losses caused thereby, and all damages will be deducted from the project payment.

4. Payment method for labor fees

Each time Party B receives labor fees, he shall pay according to the name of the worker in the team to which he belongs, the number of working days of the worker, the daily wage standard, the wages due, and the actual wages. To pay wages, Party A shall submit a wage statement to Party A. Party A will use the wage statement provided by Party B as one of the basis for payment to Party B.

5. Management

(1) After Party B enters the premises, Party B shall compile a roster of migrant workers to Party A within two days, and the names, ages, and names of the workers shall be truthfully registered in the roster. Type of work, home address and ID number, with a copy of the ID card attached. When workers leave the site or are added, Party B shall report cancellation or additional registration to Party A. The personnel listed in the attached wage list when collecting labor fees must match the roster of migrant workers one by one. If they do not match, Party A has the right not to pay the wages of those who do not match, and Party B will be responsible for any social security problems caused.

(2) Organization and management of personnel: Strictly employ old, weak, sick and disabled migrant workers. It is strictly prohibited to wear slippers and non-skid shoes to enter the construction site. It is strictly prohibited to employ child labor to engage in various tasks of construction site management. , it is strictly prohibited to accommodate fugitive criminals and outsiders overnight. All accidents and expenses arising therefrom will be borne by Party B, and any penalties imposed by law enforcement and other relevant departments will also be borne by Party B.

(3) Party B’s workers must consciously abide by all rules and regulations of Party A, obey the instructions of Party A’s management personnel, welcome and cooperate with the competent department’s inspection and acceptance of the construction site, and obey Party A’s arrangements. Party B's workers must wear safety helmets correctly and use safety protective equipment correctly when entering the construction site. If they are not used correctly, Party A has the right to fine Party B 50-500 yuan per time depending on the severity of the case. If a safety accident occurs, Party B will be fully responsible.

(4) Party B has a comprehensive understanding of the project drawings, makes a comprehensive analysis of the management methods of the supervision unit, strictly implements them, and is responsible for all concrete pouring work of this project, which should be completed in a timely manner.

(5) Party B must comply with the requirements of the project department’s construction schedule. Any fines caused by delays will be fully borne by Party B. If it fails to keep up with the schedule, Party A has the right to order Party B to withdraw from the site without any consequences. Party B is responsible.

(6) Fights and brawls are strictly prohibited on the construction site. If such phenomena occur, the team will be fined 20 yuan per person per time. If the accident is serious, the penalty will be doubled.

(7) Party B’s workers must obey Party A’s regulations on construction site safety management. If anyone violates the regulations, Party A has the right to punish Party B.

(8) Party B must clean up the site every time the work is completed and meet civilized construction standards. Party B must clean up all materials and machines every time, so that the materials and machines are stacked neatly and the site is not messy. Otherwise, Party A has the right to impose a penalty of 100 to 500 yuan per time on Party B.

(9) Party B must organize the construction according to the requirements and standards of the design and relevant specifications. If the quality of Party B’s construction fails to meet the standards agreed in the agreement, Party B must unconditionally rework until the agreed quality standards are reached and assume the responsibility Material loss caused by rework will also bear a penalty of 5% of the completed project cost.

(10) Party B must ensure that there is enough labor force to carry out normal construction (Party A requires Party B’s equipment and number of workers according to the project progress. Party B must organize its own equipment, number of workers within 24 hours after Party A requests the number of workers. Personnel in place) If Party B's equipment and number of people cannot meet production needs, Party A has the right to arrange for other units to organize and complete the work without handling settlement. Party B promises to hand over the completed work as compensation to Party A, and Party B will withdraw unconditionally at the same time.

(11) Party B shall be solely responsible for any safety accidents caused by Party B's violation of safety operating procedures.

(12) Every time concrete is poured, there should be no concrete spills on site. If one is found, Party A has the right to fine Party B 100-20 yuan depending on the severity of the case.

6. This agreement is made in triplicate, with Party A and Party B and the labor management personnel each holding one copy.

7. This contract has the same legal effect and shall take effect after being signed by the legal representatives or authorized agents of Party A and Party B. It will automatically expire after the obligations of both parties have been fulfilled.

Party A (official seal): _________ Party B (official seal): _________

Legal representative (signature): _________ Legal representative (signature): _________

_________year____month____day_________year____month____day

Labor service contract template 5

Party A:

Party B:

Both parties follow the principles of equality, voluntariness, fairness, good faith, and combine the specific circumstances of this project to clarify the responsibilities of both parties and sign this contract after negotiation.

1. Project Overview

1. Project Name:

2. Project Address:

2. Party B’s Contract Scope

Scope of contract: All floors and all concrete pouring projects on the ground constructed by Party A.

3. Project labor contracting price

This project adopts metered labor contracting. The unit price per cubic meter is as follows: C15: C25: C30:

4. Payment method

The progress payment is calculated according to the required nodes of each building project. Party B will pay after completing the positive and negative zero of each building; pay for the second floor; pay for the fourth floor; and pay for all concrete for each building after completing the sixth floor** *Payment is due;

5. Others

After the signing of this contract, if Party A fails to pay for the completed project as stipulated in the contract, Party B has the right to stop providing any concrete to Party A , the losses shall be borne by Party A, and Party A must bear financial responsibility.

6. Effectiveness and Termination of the Contract

This contract is made in two copies. Party A and Party B each hold one copy. It will take effect from the date of signature by both parties. It will be automatically completed after the contract is performed and the balance is paid. Invalid.

Party A (official seal): _________ Party B (official seal): _________

Legal representative (signature): _________ Legal representative (signature): _________

_________year____month____day_________year____month____day

5 related articles on labor service contract template:

★ 5 articles Practical personal labor contract contract template

★ 5 labor contract agreement templates

★ Simple labor contract contract template

★ 3 personal labor contract agreement templates Latest articles

★ Complete collection of personal labor contract contracts

★ 3 classic personal labor contract templates

★ 3 latest labor contract templates

★ 3 latest samples of labor contract contract

★ 6 samples of labor subcontract agreement

★ Personal labor contract sample