Measure the specific application process to build standards (help)
1 application for the assessment of the project to build standard measurement checker certificate.2 in accordance with the requirements of building standards equipped with standards and ancillary equipment (for the standard must be sent to the local metrological verification qualified, other ancillary equipment, if they are in a position to calibrate their own, but it is best to send the inspection).3 you must have to comply with the test procedures of the environment, such as: temperature and humidity 4 test procedures and related standards.5 some measurement management documents ( software) 6 above all have you can play a report to the local Technical Supervision Bureau of measurement to apply for.7 they will send a formal application for the construction of standards report. software) 6 all of the above you can play a report to the local Technical Supervision Bureau of measurement applications.7 They will send a formal application for the construction of standard reports, as well as the construction of standard technical reports (including relevant such as: traceability/relevant equipment referred to above/uncertainty analysis/stability repeatability, these are to be their own test after the calculation of the 8 will be sent to the measurement of the sub-report. Report through the 9 measurement of the Division will be audited on-site.10 audit, waiting for the issuance of certificates (measurement standards assessment certificate)