Xuancheng economic and technological development zone sewage treatment center in which

The northeast corner of the intersection of Longqiao Road and Leyigang Road in Xuancheng. Located at the northeast corner of the intersection of Longqiao Road and Leyigang Road in Xuancheng City, the design scale of the development zone wastewater treatment center is 10.0 million m3/d, which is mainly used for treating the wastewater from the Xijing River sewage system and transferring part of the wastewater from the Changqiao River sewage system, and it is divided into two phases for the construction, in which the first phase of the project is 60,000 m3/d, and the second phase of the project is 40,000 m3/d.