the contents of Shandong urban construction management regulations in Rizhao bidding information network include: (1) general rules, (2) planning and implementation, (3) management and maintenance, (4) supervision and inspection, (5) maintenance and construction funds, (6) legal responsibilities and (7) supplementary provisions. The contents of management and maintenance are as follows:
Article 19 The administrative department in charge of urban construction shall strengthen the supervision and management of municipal engineering, public utilities, landscaping, maintenance and management units of city appearance and environmental sanitation facilities, formulate annual plans for maintenance and repair, verify the maintenance and repair costs, and supervise and inspect the quality of maintenance and repair.
units that undertake the maintenance and repair of municipal engineering, public utilities, landscaping, city appearance and environmental sanitation facilities must regularly maintain and repair the facilities they are responsible for according to the relevant technical specifications for maintenance and repair, ensure their intact and normal operation, and accept the supervision and inspection of the administrative department of urban construction.
Article 2 It is strictly forbidden to occupy major urban roads as bazaars, parking lots and stalls. Has been occupied, by the city people's government to organize relevant departments to repel, restore the function of urban roads.
The main urban roads include motor vehicle lanes, non-motor vehicle lanes and sidewalks.
the main roads in the city are determined and published by the people's government of the city.
Article 21 Unauthorized excavation of urban roads is strictly prohibited.
if it is necessary to dig urban roads due to engineering construction, it must be reported to the competent administrative department of urban construction and the traffic management department of public security for approval, and the site shall be cleaned up within the prescribed time limit to restore the original state of urban roads; Without approval, no unit or individual may dig.
however, due to sudden underground pipeline failure, it is necessary to break the road for emergency repair, and it shall be handled in accordance with relevant state regulations.
article 22 inspection wells, box covers and ancillary facilities of urban roads for various pipelines shall be maintained by the setting or maintenance unit. Inspection wells, box covers and ancillary facilities of urban roads are damaged, displaced or lost, and the setting or maintenance unit shall promptly repair, align or fill a vacancy.
urban road facilities management units shall establish and improve the inspection system, and timely repair and replace damaged lighting facilities.
article 23 the administrative department of urban construction shall take measures to ensure the normal operation of the facilities of the completed urban sewage treatment plant, and the treated sewage quality must meet the national standards.
to discharge sewage into urban sewage pipe networks and other facilities, relevant procedures shall be handled in accordance with the provisions of the state, and the quality of the discharged sewage shall meet the sewage discharge standards stipulated by the state.
it is forbidden to discharge toxic, harmful, flammable, explosive or easily blocked substances into drainage facilities.
article 24 the administrative department in charge of urban construction shall strengthen the maintenance of urban flood control facilities, remove the water blocking obstacles of flood discharge channels in a planned way, ensure the normal operation of pumping stations and ensure the safety of cities in flood season.
article 25 production and business units engaged in municipal public utilities such as urban water supply, gas supply, heat supply, public transportation, sewage treatment and garbage disposal must obtain business licenses in accordance with the law before engaging in business activities.
article 26 urban water supply, gas supply, heating and other production and business units shall provide their products to users on time in accordance with the standards set by the state. Except in case of force majeure, without the approval of the people's government of the city, the production and business units of urban water supply, gas supply and heating shall not stop production and supply. In case of local depressurization or suspension of supply due to special circumstances, the user must be informed 24 hours in advance.
urban public water supply units and water supply units with self-built facilities shall regularly check and maintain the water supply facilities under their management to ensure safe operation.
production, storage, transmission, distribution and business units of urban gas must strictly abide by the relevant safety regulations and technical operation procedures, establish and improve the corresponding safety management system, and ensure the safety of production, supply and use of urban gas.
in the central heating area, no decentralized heating facilities shall be built.
article 27. if it is necessary to change the prescribed running time, routes and parking stops of public passenger transport vehicles running at regular intervals, fixed routes and fixed points, it must be approved by the administrative department of urban construction in conjunction with the traffic management department of public security.
article 28 it is forbidden for any unit or individual to build buildings, structures and pile up articles within a safe distance of urban water supply, drainage, gas supply and heating pipelines and facilities. It is forbidden to pump water directly on the urban public water supply pipeline.
when buildings, structures and stacked articles need to be built within a safe distance of urban water supply, gas supply and heating pipelines and facilities due to engineering construction, the construction can only be started after the consent of the urban construction administrative department and protective measures are taken.
Article 29 The urban public green space and road greening shall be managed by the urban construction administrative department.
the courtyard greening of the units and residents in the urban planning area shall be maintained by the units and residents, and shall be guided by the administrative department of urban construction.
article 3 the provincial people's government and the city people's government shall delimit the scope of protection for gardens, ancient and famous trees, cultural relics and historic sites with important historical, scientific and ornamental values within the urban planning area, and strictly protect them according to relevant regulations.
article 31 when building sculptures in urban planning areas, experts must be organized to demonstrate and report to the authorities for approval.
The construction of sculptures with commemorative and important historical significance must be approved by the administrative department of urban construction and reported to the people's government of the city for approval; The construction of other sculptures shall be examined and approved by the administrative department of urban construction.
article 32 urban public facilities, landscaping, environmental sanitation, public places, etc. shall meet the city appearance standards stipulated by the state.
the buildings on both sides of the main roads in the city should be kept clean, intact and beautiful in appearance. For the broken walls and dangerous houses and structures that affect the appearance of the city, the building property rights and users or individuals are responsible for repairing, transforming or removing them.
article 33 the installation of outdoor advertisements, placards, galleries, windows, etc. must conform to the standards of city appearance.
article 34 units within a planned urban area must be responsible for the city appearance and environmental sanitation work within the area of responsibility in accordance with the provisions of the people's government of the city, and accept the supervision and management of the administrative department of urban construction.
article 35 the administrative department in charge of urban construction shall, in accordance with the relevant provisions of the state, exercise unified supervision and management over the collection, transportation and treatment of various environmental sanitation facilities in urban streets and municipal domestic wastes.
article 36 construction units and individuals within a planned urban area must clear and transport the construction waste to the specified garbage disposal site according to the regulations of the administrative department of urban construction. No littering or dumping of construction waste.
Vehicles carrying liquid and bulk goods operating in urban planning areas must be sealed, wrapped and covered according to regulations to avoid leakage and spillage.
website of Rizhao Bidding Information Network: /Default.aspx
Address of Rizhao Construction Bidding Network: No.269, Jinan Road, Rizhao City, Shandong Province
Contact information of Rizhao Construction Bidding Network: 633-8899317
Fax of Rizhao Construction Bidding Network: 633-889931
Learn more about writing and making tenders to improve the winning rate.