The hazardous waste operating license application materials by direct mail or by other means to the State Environmental Protection Administration, the General Administration will give you a reply within 20 working days, the following are the conditions required for approval.
Conditions for approval
1, there are more than three environmental engineering or related professional title of intermediate or above, and more than three years of experience in solid waste pollution control of technical personnel;
2, there are in line with the State Council's competent departments of the transportation of dangerous goods transportation safety requirements of the means of transport;
3, there are in line with national or local environmental protection standards and Safety requirements of the packaging tools, transit and temporary storage facilities, equipment, and storage facilities, equipment, and qualified storage facilities;
4, in line with the national or provincial, autonomous regions, municipalities directly under the Central Government of the construction of hazardous waste disposal facilities planning, in line with national or local environmental protection standards and safety requirements of the disposal facilities, equipment and ancillary pollution prevention and control facilities; of which, the centralized disposal facilities for medical wastes, should also be in line with national standards on the disposal of medical waste. Medical waste centralized disposal facilities, should also comply with national health standards and requirements for the disposal of medical waste;
5, with the operation of hazardous waste categories of disposal technologies and processes;
6, to ensure the safety of hazardous waste management rules and regulations, pollution prevention and control measures, and emergency rescue measures;
7, disposal of hazardous wastes in the form of landfill, should be obtained by the law of the landfill site The land use right of the landfill.
? Extended information:
Hazardous Waste Operation License Acceptance Scope p>
1, annual incineration of more than 10,000 tons of hazardous waste;
2, disposal of hazardous wastes containing PCBs, mercury and other hazardous wastes that pose a great threat to the environment and human health;
3, disposal of hazardous wastes by using a comprehensive centralized disposal facility included in the national hazardous waste disposal facility construction planning.
Meaning of terms:
(1) Hazardous waste means waste that is included in the national list of hazardous wastes or is recognized as hazardous according to the criteria and methods for identifying hazardous wastes stipulated by the state.
(ii) collection, refers to the hazardous waste management unit will be dispersed hazardous waste centralized activities.
(C) storage, refers to the hazardous waste management unit in the hazardous waste disposal, will be placed in the environmental protection standards of the site or facility, as well as in order to centralize the scattered hazardous waste, in the self-provided temporary facilities or sites per batch of more than 5,000 kilograms of weight or placement time of more than 90 working days of the activities.
(d) disposal, refers to the hazardous waste management unit will be hazardous waste incineration, calcination, fusion, sintering, cracking, neutralization, disinfection, distillation, extraction, precipitation, filtration, dismantling, and other methods to change the physical, chemical, biological characteristics of hazardous waste, to achieve the reduction of the quantity of hazardous wastes, reduce the volume of hazardous wastes, reducing or eliminating the hazardous components of its activities, or hazardous waste Finally placed in a place or facility in line with the requirements of environmental protection regulations and no longer retrieve the activities.