What is included in the extranet project?

Question 1: What is the main construction project network 40 points network is the municipal engineering aspects of outdoor drainage, water supply, power distribution, cable television, telecommunications supporting projects, by which it can access the community or single project inside,

Question 2: real estate construction network refers to what generally refers to the outdoor water supply and drainage system, outdoor strong and weak electrical systems and outdoor heating, gas supply project.

Question 3: What is the extranet in the construction project The extranet is the municipal engineering aspects of the outdoor drainage, water supply, power distribution, cable television, telecommunications supporting projects, which can be accessed inside the community or single project,

Question 4: What are the roads and extranet supporting projects include The general roads include, the construction of the road, the protection of the installation of the network or guardrail, the green belt, the middle of the anti-dazzle net and so on. The general road includes, road construction, protective net or fence installation, green belt, the middle of the anti-glare net and so on.

Question 5: What is the outer network project is the outdoor pipe network, from the outer wall skin 1.5m outside the pipe network

Question 6: What are the safety issues of the outer network project 1 General 13 water supply 13.1 water quota and water pressure 13.2 water quality and prevention of water contamination 53.3 system selection 73.4 pipes, accessories and meters 73.5 pipe layout and laying 103.6 design flow and pipeline hydraulic calculation 123.6 design and water supply. Flow rate and hydraulic calculation of pipes 123.7 Water towers, water tanks and cisterns 173.8 Pressurizing equipment and pumping stations 193.9 Swimming pools and water swimming pools 223.10 Cooling towers and circulating cooled water 253.11 Water features 274 Drainage 284.1 Selection of systems 284.2 Sanitary fittings and storage bends 284.3 Pipe laying and placement 29 1 General 1.0.1 In order to guarantee the quality of the design of water supply and drainage for buildings, the design should comply with the safety, safety, and water quality standards of the building. 1.0.1 In order to ensure the quality of building water supply and drainage design, so that the design meets the basic requirements of safety, health, application, economy, etc., the development of this specification. 1.0.2 This specification applies to the design of water supply and drainage of residential neighborhoods, civil buildings, also applies to the design of water supply and drainage of industrial building life and roof rainwater drainage design of factory buildings. But the design of the following projects, but also should be in accordance with the current special norms or provisions of the implementation of: 1 wet subsidence loess, frozen soil and expansion and contraction of soil and other areas of the building. 2 earthquake-resistant buildings more than 9 degrees of intensity. 3 mineral springs, water treatment, civil defense buildings. 4 industrial water supply and drainage. 5 building water. 1.0.3 building water supply and drainage design, should be used to meet the requirements of the use of the same time, but also should be for the construction and installation, operation and management, maintenance and testing, as well as safety protection. 1.0.4 building water supply and drainage engineering design, in addition to the implementation of this specification, should also comply with the current national standards and norms. 3 water supply 3.1 water quota and water pressure 3.1.1 residential water supply design of water consumption should be based on the following water consumption to determine: 1 residential water consumption; 2 water consumption of public **** building; 3 greening water consumption; 4 water landscape, recreational facilities water consumption; 4 water supply of recreational facilities. Water consumption for greening; 4 Water consumption for water features and recreational facilities; 5 Water consumption for roads and squares; 6 Water consumption for public utilities; 7 Unforeseen water consumption and leakage of water from pipeline network; 8 Water consumption for fire-fighting. Note: Fire fighting water consumption is only used for checking the calculation of pipe network, and is not a normal water consumption. 3.1.2 Residential water consumption of residential community, according to the population of the community and Table 3.1.9 of the maximum daily residential water consumption quota is determined by calculations. 3.1.3 Residential community water consumption of public **** building should be used according to the nature of its use, scale, using the water consumption quotas in Table 3.1.10 is determined by calculations. 3.1.4 Greening watering in residential community, according to the nature of its use, scale, using the water consumption quota in Table 3.1.10 is determined by calculations. .4 The water consumption quota for greening watering in the residential area can be calculated according to the watering area of 1.0~3.0L/m2 d. The water consumption quota for watering in the public swimming pool can be increased according to the nature of use and scale. The water consumption of communal swimming pool, water swimming pool and water feature shall be determined according to the provisions of 3.9.17, 3.9.18 and 3.11.2. 3.1.5 The water consumption quota for watering of roads and squares in residential area can be calculated according to the watering area of 2.0~3.0L/m2 d. 3.1.6 The water consumption and pressure for fire-fighting in residential area as well as the fire duration shall be determined in accordance with current "Fire Prevention Code for Building Design" and "Fire Prevention Code for High-rise Buildings". Code for Fire Protection in Building Design" and "Code for Fire Protection in Design of High-rise Civil Buildings". 3.1.7 The sum of leakage water and unforeseen water in pipe network of residential community can be calculated as 10%~15% of the maximum daily water consumption. 3.1.8 Water consumption of utilities in residential community should be provided by the management of the facility, and when there is no major utility, no additional water consumption will be counted. 3.1.9 Maximum daily water consumption for residential The daily domestic water consumption quota and the hourly variation coefficient can be determined according to Table 3.1.9, depending on the type of residence, building standard, degree of perfection of sanitary appliances and area. Table 3.1.9 Residential maximum daily domestic water consumption quota and hourly variation coefficient residential category sanitary apparatus 3.1.11 Building indoor and outdoor fire fighting water consumption, water supply extension time, water supply pressure, etc., should be in accordance with the current relevant fire fighting norms. 3.1.12 Industrial enterprise building, management personnel of the domestic water consumption quota can be taken as long as the shortcomings of the 30 ~ 50L / person class; workshop workers of the domestic water consumption quota should be determined according to the nature of the workshop, generally appropriate to adopt the workshop water consumption quota. The nature of industrial enterprise building, generally appropriate to use 30 ~ 50L / person class; water time for 8h, hourly variation coefficient of 1.5 ~ 2.5. Industrial enterprise building shower water quota, should be based on the "industrial enterprise design health standards" in the workshop of health characteristics of the grading to determine the general can be used for 40 ~ 60L / person times, the continuation of the water supply time of 1h. 3.1.13 car washing water quota, should be based on the vehicle Use, road ...... >>

Question 7: real estate construction What is the extranet The extranet refers to the pipeline, electrical, communication and other facilities within the district, outside the building.

Question 8: What information is needed for the construction of the heat external network Construction program, drawings, start report, construction technology transfer records, site temporary agreement visas, hidden project inspection records, construction inspection records, valve test reports, unit project quality acceptance report, material quality testing witness records, divisional project quality acceptance report, sub-construction project quality acceptance report, steel pipe inspection acceptance records, Industrial pipeline installation records, heating pipeline hydrostatic test records, heating pipe network project completion of the handover letter, heating pipe network project strength, tightness test records, heating pipe network project cleaning nail inspection records, heating pipe network project test run records, pipe weld welding records, pipe trench base trench bottom project inspection and acceptance records, completion report, completion acceptance certificate, construction program, the main raw materials and components factory certificate.

Question 9: Hello, I would like to ask, what is included in the power grid project, can you tell me in detail? This I do not understand very much want to understand! Street light control cabinets, semi-rigid plastic pipe buried laying, cable trench digging, rectifier power transformers, power cables, garden lights, lawn lamps, floodlights.

Power substation, box variable equipment procurement, installation, commissioning and from the park opening and closing station to the substation, box variable high-voltage cable laying and the park substation, box variable to the low-voltage distribution cabinets within the low-voltage cable laying of the single project.

Question 10: Which seniors point out the construction process of the external network? Construction process: according to the map measurement, placement, piling → digging pipe trench → trench bottom matting treatment → review elevation → pipe prefabrication, corrosion → pipe under the pipe to find the right → pipe mouth connection → part of the soil backfill → check before the pressure test → segmented system test → hidden check → backfill → the system of the final water pressure test.