Anshan City, urban sewage treatment plant operation supervision and management measures

Article I In order to establish and improve the long-term mechanism of supervision and management of urban sewage treatment plant operation in Anshan City, strengthen the supervision and management of urban sewage treatment plant operation, promote pollution prevention and control, improve the quality of the water environment, according to the "Chinese People's Republic of China *** and the State of Water Pollution Prevention and Control Act", "Liaoning Province, the supervision and management of sewage treatment plant operation regulations" and other relevant laws and regulations, combined with the actual situation in the city, to formulate the measures. Article 2 This approach applies to the administrative area of Anshan City, urban sewage treatment plant operation and supervision and management. Article 3 The urban sewage treatment plant (hereinafter referred to as "sewage treatment plant") refers to the sewage collection system into the town sewage purification and treatment of sewage treatment plant.

The measures referred to in the sewage treatment plant operating unit (hereinafter referred to as the operating unit), refers to the sewage treatment plant for the production and operation of the management of legal entities.

This approach is referred to as the operation of supervision and management, refers to the sewage treatment plant has been built and operated (including trial operation) supervision and management. Article IV city, county (city) people's government on the operation of sewage treatment plant is responsible for the operation of sewage treatment plants and pipe network construction into the government performance appraisal work to ensure that sewage treatment plant normal operation. Article V city, county (city) environmental protection administrative department is responsible for the supervision and management of the operation of sewage treatment plants in the administrative area.

Construction, finance, development and reform and other administrative departments in accordance with their respective responsibilities **** with the operation of sewage treatment plants to do the relevant work. Article VI of the sewage treatment plant is completed, the application for trial operation by the construction unit to the competent administrative department of environmental protection, upon approval before proceeding.

The sewage treatment plant from the date of trial operation within three months, the construction unit shall apply to the approval of the project environmental impact assessment documents of the administrative department of environmental protection for the completion of the construction project environmental protection acceptance.

Trial run for three months still does not have the conditions for acceptance of environmental protection for the completion of the construction project, the construction unit shall submit a written application for extension to the competent administrative department for environmental protection, stating the reasons for the extension and the proposed acceptance of the time, upon approval before the extension of the trial run. Trial run for a period of up to one year. Article 7 The operating unit shall obtain the appropriate operating qualifications in accordance with the provisions of the management, technology, practical operators should be licensed. Article VIII of the operating unit of the sewage treatment plant operation and management, treatment facilities and water quality is responsible for, in accordance with the "urban sewage treatment plant operation, maintenance and safety of technical regulations" to develop to ensure the normal operation of the sewage treatment plant safety operation of the emergency response plan and the production management, production safety, water quality testing and other systems. Article IX operating units shall establish production and operation accounts and water quality, water and sludge monitoring files, and monthly, quarterly, annual periodic reports to the competent administrative department of environmental protection in a timely manner in and out of the water quality, water, sludge disposal, equipment operation, operating costs, safety, operation and maintenance and other aspects of the information, is a state-controlled sources of pollution in sewage treatment plants should be in accordance with the provisions of the monitoring results of the relevant information disclosure. Article 10 The operating unit shall, in accordance with relevant regulations in the sewage treatment plant set up standardized sewage outlets, inlet and outlet and key water treatment structures and other locations to install online monitoring, monitoring devices and central control system, and networking with the administrative department of environmental protection.

Online monitoring, monitoring devices and centralized control system should be in line with relevant national and local regulations, and the operation of sewage treatment plants and water quality for real-time monitoring. Article XI of the sewage treatment plant intake water quality exceeds the design standards resulting in water exceeded, the operating unit has the burden of proof and the obligation of emergency treatment. Found that exceeds the standard, shall promptly report to the competent administrative department of environmental protection, the competent administrative department of environmental protection shall promptly organize forensic verification and treatment after receiving the report. Article XII of the operating unit shall maintain the normal operation of the sewage treatment plant, shall not be stopped without authorization. Due to facility overhaul, overhaul, maintenance, etc. need to stop or partially stop, the operating unit shall be 15 working days in advance to the administrative department of environmental protection for approval, subject to approval before implementation.

For emergencies caused by all or part of the sewage treatment plant shutdown, the operating unit should immediately start the emergency plan, and within two hours to report to the competent administrative department of environmental protection. After resuming normal operation, it shall promptly report to the competent administrative department of environmental protection. Article 13 The water content of sludge discharged from sewage treatment plants shall comply with relevant regulations and be managed with reference to hazardous wastes. Governments at all levels should strengthen the resourceful disposal and utilization of sludge, transported to qualified sludge treatment and disposal units for resourceful treatment. Article 14 The relevant functional departments of the people's governments of cities, counties (cities) and districts shall accelerate the construction, renovation and maintenance of the supporting sewage pipe network, expand the service scope of the sewage collection pipe network, improve the sewage collection system, and ensure the effective operation of the pipe network. The design, construction and renovation of the sewage collection pipe network shall be prioritized or synchronized with the design, construction and renovation of the sewage treatment plant. Urban drainage pipelines shall be constructed in accordance with the rain and sewage diversion, and the drainage network in the areas where rain and sewage diversion is not practiced shall be gradually renovated into a rain and sewage diversion system, so as to ensure that the actual treatment load of the sewage treatment plant after it has been put into operation shall not be less than 75% of the design capacity within one year. Article XV of the city, county (city) environmental monitoring agencies should be based on national and local regulations and norms of sewage treatment plant into the water quality, water quality, water quality, etc. Supervisory monitoring and the establishment of monitoring files, at least once a month to carry out supervisory monitoring, and at least once a quarter to carry out automated monitoring instrumentation comparison monitoring and automated monitoring data validity audit.