These Measures shall not apply to the disposal of hazardous wastes generated in the activities specified in the preceding paragraph in accordance with the provisions of relevant laws and regulations. Fourth city management department is responsible for the city's construction waste management.
The district urban management department is responsible for the management of construction waste within its jurisdiction in accordance with the management authority.
Urban and rural construction, urban and rural planning, environmental protection, finance, public security, land and resources, transportation, real estate management, price, quality and technical supervision, civil air defense and other departments shall, according to their respective responsibilities, do a good job in the management of construction waste. Article 5 The disposal of construction waste shall follow the principles of reduction, recycling, innocuity, and whoever produces and bears the responsibility for disposal.
Encourage research, development and use of new technologies, new processes, new materials and new equipment for emission reduction and recycling of construction waste. If construction waste can be reused or recycled, it should be recycled; If it cannot be reused or recycled, it shall be disposed of in accordance with the relevant laws and regulations and the provisions of these measures. Article 6 The system of classified disposal of construction waste. Waste bricks, concrete, asphalt and other construction wastes. Reusable, centralized treatment, waste residue generated by engineering excavation is given priority for engineering backfilling. Seventh construction waste disposal sites are divided into construction waste resource utilization sites and construction waste disposal sites according to their uses. The resource utilization field of construction waste refers to a place where construction waste is treated as a resource and various recycled building materials are produced with the permission of the government. Construction waste disposal site refers to a place where materials such as muck are temporarily stored or harmless treatment measures such as landfill are taken for waste soil that cannot be reused.
In principle, each county shall set up at least one construction waste disposal site, which shall be set up by the municipal and county people's governments according to the planning layout and meet the requirements of safety and environmental protection. Eighth construction waste disposal fees system, fees in accordance with the relevant provisions. Ninth need to dispose of construction waste, it shall submit the following materials to the municipal urban management department:
(1) A written application;
(two) the construction waste disposal plan, which shall include the classification, location, quantity, disposal location, resource utilization and other matters of construction waste;
(three) transport vehicle certification documents in accordance with the provisions of these measures;
(four) the disposal agreement or backfill certificate signed with the construction waste disposal site.
The municipal urban management department shall examine the accepted application, issue approval documents if it is approved, and issue copies of the corresponding approval documents according to the actual number of transport vehicles carrying construction waste; If it is not approved, it shall inform the applicant and explain the reasons.
It is forbidden to forge, alter, resell, lease, lend or transfer the approval documents for the disposal of construction waste. Tenth construction, construction units shall comply with the following provisions:
(1) The enclosure on the construction site is closed;
(2) The concrete at the entrance and exit of the construction site and the main roads is hardened without floating soil and accumulated soil, and measures such as washing and sprinkling water are taken to control dust;
(3) Vehicle cleaning facilities, supporting sedimentation tanks and drainage ditches shall be set at the entrance and exit of the construction site to wash the vehicles leaving the construction site;
(4) Install video monitoring facilities at the entrance and exit of the construction site and access the urban management monitoring platform. Eleventh units engaged in construction waste transportation shall meet the following requirements:
(1) Transport enterprises established according to law;
(two) a sound vehicle operation, safety production, quality and maintenance management system;
(three) there are vehicles that meet the technical specifications and standards;
(4) Other conditions stipulated by laws and regulations. Twelfth transportation of construction waste shall comply with the following provisions:
(a) carrying a copy of the approval document for the disposal of construction waste with the vehicle;
(2) transport vehicle compartment intact, airtight and clean;
(three) in accordance with the approved route and time requirements, transported to the designated construction waste disposal site, shall not be dumped, shall not be transported beyond the approved scope;
(four) the implementation of classified transportation;
(five) other provisions that should be observed. Thirteenth construction waste disposal sites shall not accept industrial solid waste, domestic waste, kitchen waste, medical waste, hazardous waste and other non-construction waste; Without the approval of construction waste disposal, construction waste is not transported in accordance with the time, place and type specified in the approval letter, and will not be accepted.
The source, type, quantity and disposal of construction waste shall be submitted to the urban management department in a timely manner.