The secondary water supply facilities referred to in this approach, refers to the secondary water supply set up for the pumping station, pool (box), pumps, valves, electronic control devices, disinfection equipment, pressure water containers, water pipelines and other facilities. Article III of the city's urban public **** water supply network, new construction, expansion, reconstruction of civil and industrial buildings, secondary water supply facilities for drinking water design, construction, acceptance, operation and maintenance, and its supervision and management of the application of this approach. Article 4 The city management department as the urban water supply department is responsible for the supervision and management of secondary water supply.
Sanitation and health authorities are responsible for secondary water supply water quality monitoring and health supervision and management work.
The Development and Reform Commission is responsible for the development and approval of the price of secondary water supply pressurization charges.
Finance, public security, natural resources and planning, housing and urban-rural development, ecological environment, market supervision and management of the competent authorities in accordance with the division of responsibilities, to do a good job in the management of secondary water supply. Article secondary water supply should be safe and reliable, health and environmental protection, energy-saving and water-saving technologies and equipment, the implementation of intelligent management. Chapter II Facilities Construction Article VI new, expanded, altered construction projects, when civil and industrial buildings for drinking water users of water pressure, water requirements over the urban public **** water supply network water supply capacity, should be constructed secondary water supply facilities.
Secondary water supply facilities should be designed at the same time as the main project, construction, acceptance and put into use at the same time.
New construction, expansion, alteration of construction projects need to prepare the design of secondary water supply facilities, in addition to must comply with the "Secondary Water Supply Engineering Technical Regulations", "Secondary Water Supply Facilities Hygiene Code" and other relevant national technical standards and norms, but also should include a meter, meter reading to the household and pumps vibration and noise reduction and other design content. Article secondary water supply facilities construction investment should be included in the total investment in construction projects, its construction costs in accordance with the relevant state engineering pricing regulations, by the construction unit.
Engineering and construction units should be the design of secondary water supply facilities, construction is entrusted to units with appropriate qualifications. Article VIII has been built secondary water supply facilities do not meet the national technical regulations on secondary water supply facilities, health codes and other provisions, shall be transformed, the transformation of the funds required by the construction unit or the property owner.
Encourage multi-channel investment in the construction of secondary water supply facilities to strengthen water quality and safety. Chapter III operation and maintenance of Article IX secondary water supply facilities completed or renovation is completed, encourage the construction unit or the property owner is responsible for the management of secondary water supply facilities transferred to the city water supply enterprises responsible for the implementation of professional management, and urban water supply enterprises signed a transfer of management agreement, the secondary water supply facilities, as-built drawings, related information transferred to the city water supply enterprises.
Before the implementation of these measures, not transferred to the urban water supply enterprises unified operation and management of its secondary water supply facilities, operation and maintenance by the property owner or its entrusted management unit. Article secondary water supply facilities into use before the construction unit or secondary water supply facilities management unit should be the secondary water supply facilities for water testing, and by the appropriate qualifications of the agency issued a report on the water quality testing before being put into use. Article XI has been transferred to the secondary water supply facilities, the property owner or its entrusted management unit shall assist the urban water supply enterprises to do a good job in fire prevention, anti-theft, anti-rodent, anti-electricity leakage, anti-sabotage and other work. Article XII of secondary water supply facilities management unit shall establish a daily inspection, regular maintenance and repair system and secondary water supply facilities health management files, develop emergency response plan. Semi-annual secondary water supply storage facilities at least one comprehensive cleaning and disinfection, monthly water quality testing, test results in the water supply in the area to be announced. The health department shall regularly monitor the water quality of secondary water supply health. Article XIII of the secondary water supply facilities management unit staff should have the appropriate professional skills, familiar with the technical performance of water supply facilities and operational requirements, to comply with operating procedures. Directly engaged in the supply and management of water personnel must obtain a medical examination certificate before going to work, and an annual health check. Article XIV secondary water supply operation shall not be interrupted, due to engineering construction, equipment maintenance and repair and other reasons really need to stop the water, should be 24 hours in advance to inform the user. Stopping water for more than 24 hours, should be reported to the city management department. Due to unforeseen failures caused by water supply, should be in repair at the same time to notify the user. Article XV of any unit or individual shall not engage in the following acts:
(a) unauthorized self-built secondary water supply facilities connected to the urban public **** water supply network;
(b) damage, encroachment or unauthorized alteration of the secondary water supply facilities;
(c) obstruct or impede the maintenance and repair of secondary water supply facilities.
Any unit or individual has the right to damage the secondary water supply facilities, jeopardize the safety of secondary water supply of complaints and reports, urban management and health and other relevant departments in charge of health should be dealt with in a timely manner upon receipt of the complaints and reports, and will deal with the results back to the complainant and reporter.