What is the acceptance standard of Chongqing construction project?

1. The quality of construction of building works shall conform to the provisions of this standard and relevant professional acceptance norms.

2. The construction of building works shall conform to the requirements of engineering survey and design documents.

3. All parties participating in the acceptance of the quality of construction works shall have the required qualifications.

4. Acceptance of the quality of the project should be in the construction unit on the basis of their own inspection and evaluation.

5. Concealed works shall be notified by the construction unit for acceptance before concealment, and acceptance documents shall be formed.

Data No.

6. Specimens, test pieces and related materials involved in structural safety shall be witnessed and sampled for testing in accordance with regulations.

7. The quality of inspection lots shall be accepted according to the main control items and general items.

8. Important divisional works involving structural safety and use of function should be sampling test. GB50300-2001

9. Undertake to witness the sampling test and related structural safety testing units should have the appropriate qualifications.

10. The apparent quality of the project should be accepted by the acceptance of the personnel through on-site inspection, and should be **** with the confirmation.