Minutes of safety regular meeting

Model essay on minutes of safety regular meeting (5 articles in total)

With the continuous progress of society, it is more and more necessary to use meeting minutes when dealing with affairs. Meeting minutes require clear meeting procedures, clear objectives, prominent center, accurate summary, clear hierarchy and concise language. So how do you write the minutes of the shareholders' meeting? The following is a model essay (5 in total) of the minutes of safety regular meeting that I collected. Welcome to read the collection.

Minutes of regular safety meeting 1 Time: xx, xx, xx, xxxx.

Venue: On-site meeting room

Moderator: xxx

Record arrangement: xxx

Participating units and personnel:

Supervisors: xxx (safety supervision), xxx.

Construction unit: xxx, xxx, xxx, xxx, xxx, xxx.

Main topic of the meeting: regular safety meeting.

Meeting contents:

Xxx (safety supervision):

In the first half of the month, it was ok on the whole. In the second half of the month, the main safety inspection chimney and safety responsibility are implemented, weekly inspection and monthly inspection.

Xxx (safety officer):

First, hold the chimney tightly, hold a safety meeting once a week, and convey the information released above to the construction workers below. Emphasize safety every day. The tower crane is operating normally. We'll have a meeting with the driver right away. Pay attention to safety. There are also two local teams, and the safety meeting will be implemented immediately.

Second, the chimney safe passage has been determined and implemented, and it has been done well, but the climber and safety belt must be implemented as soon as possible.

Third, the hygiene of canteens and dormitories should be sorted out.

Xxx (safety officer):

First, the aerial work, cross work, falling objects and civilized construction of civil engineering have made great progress compared with last month.

Second, smoke tower construction at night, should first turn on the top of the lamp, is under construction.

Third, it's windy recently, so it's easy to scrape the crane, and then meet the xx tower crane. I hope everyone will pay attention.

Fourth, chimney climbers and climbing ropes should be implemented as soon as possible.

Xxx (safety supervision):

First, there are still many problems in the second half of the month that must be truly implemented.

Second, the safety net must be done well, the construction is getting higher and higher, and there are many cross-jobs. It is necessary to minimize potential safety hazards and immediately stop work for rectification when problems are found.

Third, the tower crane must be reinforced, otherwise it is not allowed to be used.

Four, chimney hoisting, lifting platform is heavy, it is easy to fall, must reduce the weight of lifting objects. 6-7 at most.

Five, the safety cloth must be tied tightly, don't all be blown away by the wind.

Six, aerial work and crossover operation as far as possible to avoid.

Seven, chainsaw users must wear goggles.

Eight, next Tuesday to start inspection, such as the above problems found immediately.

Minutes of meeting of regular safety meeting II Meeting time: 3:00 p.m. on Tuesday, 20xx.

Meeting place: conference room on the second floor of Building 2, Xi 'an, Tianjiao.

Participants: See the sign-in form.

General contractors: Duan Ping, Zhang Xinyu and Li Youming.

Subcontractors: Zheng, Deng Hongze, Chi Yongqiang, Zhang Xianshun, Xiao, Zhang Jun, Shang Jingming, Hao,.

Moderator: Duan Ping (Project Manager)

Main contents of the meeting:

The safety and civilization of the construction site of Building No.2, the planning and classification of site materials, project quality, project progress and other issues.

A, safe and civilized construction

1. Materials on the construction site shall be classified and neatly stacked. Turnover materials, finished materials and raw materials shall not be piled up at will. Steel pipes should be stacked in layers according to different lengths on scaffolding.

2. The steel yard should be isolated separately, with only small doors for personnel to enter and leave, and enclosed by scaffolding. The safety and civilized slogan of the steel processing shed needs to be reset.

3. Strengthen the protection of the south safe passage, and set up safety and civilized slogans at the entrance of the passage as required.

4. The steel bar waste at the gate of the construction site should be rearranged, and the steel bar waste should be stored in the masonry waste pool.

5. Reorganize the southwest site of Building No.2, build multi-layer shelves with pipe supports, and lay wooden boards stacked with steel pipes, fasteners, jacking wires and other materials. 6. Flammable and explosive articles (such as acetylene and oxygen) should be stored separately in a cool place, away from open flames. 7. Set up a safety protection shed above the ground pump, and add safety and civilized slogans. The foundation pit on the north side of the pump truck is surrounded by steel pipes.

8. The construction machinery of the labor party must be "one machine, one box, one brake and one protection" according to the specification requirements, and check the temporary electricity consumption at the construction site. It is forbidden to pull and connect randomly to eliminate potential safety hazards. The primary box and secondary box should be marked, and the power system diagram should be posted in the distribution box.

9, the construction site road cleaning and maintenance, the project department and the employer take turns cleaning every week.

10, scaffolder's cantilever scaffold erection does not meet the specification requirements. The overlapping length of bracing shall be at least one meter, and the number of rotating fasteners in the overlapping area shall not be less than three. The angle of support is between 45 degrees and 60 degrees. The safety net should be replaced in time, and the "four ports and ten sides" protection must be in place.

1 1. There are potential safety hazards on the unloading platform. The length of the unloading platform extending into the building is not less than 1.5m, and the lengths of the wire ropes on both sides are inconsistent (resulting in uneven unloading). The upward inclination angle of the platform is insufficient, so there are no safety protection measures and no limited redrawing.

12. When using "Three Treasures", you must wear a safety belt (hanging high and using low) when working at height, and you must wear a safety helmet when entering the construction site, and offenders will be fined according to the regulations of the project department.

13, elevator shaft protection is not in place, and adjacent holes and vents should be protected layer by layer.

14, requiring the tower company to inspect the tower crane once a week and form inspection records. The tower company must climb the ladder between the upper and lower operation rooms, and it is forbidden to use scaffolding to climb the tower crane from the building.

15, when working in dangerous areas (high altitude, near the hole, etc.). ), it is forbidden to answer the phone to prevent safety accidents.

16, be careful when smoking in the construction site, and don't throw cigarette butts anywhere, which may easily cause fire.

17. Submit the post certificate of special operators (issued by the Ministry of Construction), post certificate of safety officer and safety assessment certificate to the project department for the record.

The above safety and civilization problems will be rectified within three days, otherwise 16 building will not be settled.

Second, the project quality

1. In order to ensure the water use in the construction site (main structure and subsidiary structure), it is decided to build a reservoir in the construction site. Specific matters shall be negotiated by the project department, the labor service company and the secondary structure party.

2. After the reservoir is built, the plumber's union will connect a tee from the reservoir to each floor upstairs, which will be used as water for the secondary structure.

3. Because the cement stirrups are not practical, it is impossible to guarantee the spacing requirements of double-layer steel bars, so Dongfu Labor Service Company is required to replace the cement stirrups with steel stirrups from the16th floor.

4. After each layer of steel bar is inspected, the steel bar team shall conduct self-inspection, and the steel bar team leader shall take the lead in the inspection. After passing the inspection, it shall be reported to the labor service unit, and finally to the project department for inspection and notification to the supervision unit, so as to establish a simple and convenient system. When the roof reinforcement is inspected, the finished product shall be protected to prevent the reinforcement from being trampled, otherwise the reinforcement shall not be provided.

5, pouring concrete must be cured, curing time shall not be less than 7 days, with the same conditions of the block on the same floor without leaving a dead angle.

6. Since 16 layer, the formwork of post-cast strip shall be provided with a separate support system, otherwise it will not be accepted.

7. Due to the tight construction period, carpenters should clean up the construction waste in time after formwork removal, so as not to affect the secondary structure construction, otherwise they will be fined.

8, carpentry and steel bar work time reasonable lap, cooperate with each other, can not appear after clamping steel bar scene, or ordered to rework to correct; Masonry works, bricklayers and electricians should cooperate with each other, and there should be no wall planing in the later period, otherwise a fine of 5000 yuan will be imposed and maintenance will be carried out.

Third, the progress of the project

1, since 16 layer, the concrete pouring time must be reasonable, and the pouring time shall not be too long due to mechanical or artificial reasons, otherwise economic measures will be taken.

2, the project department to ensure good workability of commercial concrete, meet the construction requirements, labor units in concrete quality problems need to inform the project department to solve, not to add water, or find a fine of fifty thousand yuan.

3. Starting from the second floor, clear it layer by layer, and give each layer to the secondary structural party. For the smooth construction of the secondary structure, workers will be arranged to clean up as soon as possible. If the labor service company does not clean it up as soon as possible, the secondary structural party will send someone to clean it up, and the expenses incurred will be deducted from the project payment of the labor service company.

3. The project progress this week will be based on the actual situation. On Thursday, the project department and the labor service company will make a weekly progress plan according to the actual situation. After both parties sign, the construction will be carried out according to the schedule, and a week later, comparative analysis and rectification will be carried out. If the progress is delayed due to the subjective reasons of the laborer, the economic penalty will be imposed according to the lag time.

The minutes of this meeting shall have the same legal effect as the project contract, and can be used as the basis for project payment settlement, which is valid for all types of work.

Beijing Rishengda Construction Enterprise Group Co., Ltd.

Tianjiao Xi' an 2# building projects department

20xx year x month x day

Minutes of the third safety meeting:

Xx year x month x day

Location:

meeting room

Conference theme:

Safety production meeting:

Main contents:

1, Spring Festival has passed, remind everyone to relax, raise awareness of safety in production, never relax, and strengthen safety education after the holiday.

2. Check the implementation of the agreed items at the last meeting and analyze the reasons for the unfinished items.

3. The directors of all departments and workshops report the recent problems in safety production, put forward specific solutions at the meeting, and implement them according to the principle of "four decisions";

4. Solve the problem of safe production that needs coordination.

5. The leaders on duty should make records on duty and handle problems in time when found.

Minutes of safety regular meeting 4 Meeting time: 20xx year x month x day

Venue: Student Union Office

Attendant: All members of the Red Cross Affairs Department.

Moderator: Minister ELISAHA DING.

Recorder: Yin Guandong

The contents of the meeting are as follows: (The meeting is mainly attended by Minister Li Ding, supplemented by the deputy ministerial level. )

First, several problems recently discovered

1. Some students are complaining about their work, and their attitude is not positive. I hope everyone can understand each other and unite as one.

I hope everyone can overcome the difficulties in voluntary service activities.

Everyone should have a sense of collective honor and departmental honor.

2. The probation period is one month.

2. The nature of my work:

Carry out voluntary service activities in medical care, first aid, health and other aspects, and participate in voluntary activities carried out by other departments of the school journal.

Three. Recent work arrangements:

1. China-Korea exchange meeting (13-15) requires volunteers to provide voluntary services. Count the students who are willing.

2. Next Thursday (65438+1October 20th), the adult ceremony of "blood donation to commemorate growth" will be held in cooperation with Wuhan Blood Center, and there will be a full-day segmented duty watch to count the duty time.

3. Students who participated in the volunteer activities of the School of Journalism on the date of 13- 15 and from Wednesday to Friday need to collect the volunteer cards from the office in the morning of the first class and return them in the last class.

4. Saturday night departmental dinner

I hope everyone will speak freely at the regular meeting of the school journal association next Wednesday.

Four. Some details

1. Everyone should pay attention to receiving mass emails and reply.

2. Leave must have a note, and send it by mass mail later.

3. In the future, regular departmental meetings will arrive 10 minutes earlier, and regular Tzu Chi meetings will arrive 15 minutes earlier.

Future departmental meetings may be arranged every Friday.

5. SMS reply is polite to avoid delay.

6. The mobile phone is silent during the meeting.

7. Pay special attention to politeness to brothers and sisters in other departments.

8. Pay attention to the format and content of official document writing.

9. Newcomers can talk to their brothers and sisters more, pay attention to the time and avoid taking a break in class.

Verb (abbreviation for verb) freedom of speech.

1. the significance of joining the record association

2. How to become a member of the Red Cross?

3. How to handle the relationship between work and study?

Minister ELISAHA DING introduced some future activities.

1. The blood collection vehicle jointly organized with Wuhan Blood Center will enter the campus once a month. Starting from this semester, we will plan to set the theme every month. I hope you can give me more advice.

2. Cooperate with the school hospital to train members of the Red Cross.

3.65438+February 1 World AIDS Day Publicity.

4.65438+ February First Aid Knowledge Competition

5.65438+ February Garden Party.

6. On March 24th, TB prevention and control publicity activities.

7. In early May, members of the Red Cross were recruited.

8. Training for Red Cross members in May

At the end of the meeting, the minister emphasized "responsibility".

Minutes of Safety Regular Meeting 5 Meeting Time:

XXXX year XX month XX day XX:XX

Meeting place:

Dispatching conference room

Main support:

XXX

Participants:

XXX XXX XXX XXX

Meeting contents:

Workshop and department leaders briefly summarized the work of XXXXX month, and reported the work arrangement of XXXXX month, and formed the meeting minutes as follows:

1. All workshops should do a good job of summarizing the safety activities in XX month.

2. In XX month, the State Council issued a notice (XXXX was issued by XXNo. With regard to further strengthening the work of safety in production, all units are required to organize employees to study hard in the form of Friday activity time and safety symposium.

3. In the future, each workshop should institutionalize the investigation and handling of potential safety hazards, and report the hidden dangers that do not belong to the scope of XX maintenance and handling to the Motor Division in written form for processing.

4. In 4.XX month, it is necessary to strengthen the inspection of fire control work in X season, and intensify the self-inspection of inflammable and explosive materials, oil leakage of equipment and gas pipelines.

5. Strictly put an end to the phenomenon of "three violations" and adhere to the implementation of the safety system; It is necessary to put an end to drinking in class and sleeping at night, and strengthen the labor discipline inspection and the system of handing over shifts before and after work.

6. Learn from the lessons of major fire accidents on XX, XX, XX, and strictly investigate management loopholes, and strengthen the study of relevant knowledge of dangerous explosives.

7, strengthen the safety management of XX, electrical maintenance, maintenance plan must be standardized, must be listed for operation, to prevent XX, XX, XX and other workshop safety accidents.

In August and XX months, all workshops should do a good job of safety acceptance in the first quarter to lay a good foundation for next year.

XXXX,XXXX,XX,XX

;