Safety education system
1, in the work team to enter the site before the formal start of operations, the project department must be on the team workers for the "three levels" of safety education (team education, the project department education, enterprise safety management education), and the establishment of the education record card; if the safety technical briefing is not clear and comprehensive, must be held responsible for the education or briefing people responsible for accidents at work. If the safety technology is not clear, not comprehensive, employees have workplace accidents, must be held accountable for the responsibility of the person who educates or explains.
2, safety education at all levels has a targeted approach, treating each team can not be the same, to cope with the errand.
3, the project department should often organize cadres to study the laws and regulations on production safety, study norms and standards, study safety and technical procedures, etc., through the study to achieve proficiency and use of the purpose.
4, to insist on carrying out weekly Monday safety activities, each activity should be organized, content, purpose, requirements, generally summarize last week's safety work, according to this week's work put forward and emphasize the measures to improve safety, but also targeted selection of some safety procedures; the purpose of the safety activities, the content and the specific arrangements for the project by the project department of a full-time safety officer Responsible for the project manager or other management personnel shall not take up the time of safety activities to convene other meetings and other work.
5, the new workers in the allocation of work before the work must be carried out three levels of safety education, the project department for professional safety and technical regulations and rules and regulations of education, team for specific safety education.
6, where the requirement of special licensed special operators, the project must be in contact with the local labor department, safety and technical training, after the examination to obtain a special operator's license before going to work; before going to work should be carried out before the safety education and safety and technical briefings.
7, workers change the type of work or engage in the second type of work, the project must be re-training and safety regulations of its safety training and learning, and only after passing the examination can be on duty.
8, the construction of new technologies, new tools, new equipment and new technology methods, the project department should be operated by the operator of technical training and safety technology education, after passing the examination before operation.
Safety inspection system
Safety inspection is an important means and measure to eliminate potential accidents, prevent accidents and ensure safe production. In order to continuously improve the production conditions and operating environment, so that the operating environment to achieve the best state. So as to take effective countermeasures to eliminate unsafe factors and ensure safe production, we have formulated the safety inspection system as follows:
First, the content of the safety inspection: in accordance with the Ministry of Construction issued by the construction site safety inspection scoring standards, against the implementation of the inspection; protection of the base trench adjacent to the edge of the protection of the construction; construction of electricity, construction machinery and equipment safety facilities, operating behavior, the correct use of labor protective equipment and fire safety etc.
Second, the method of safety inspection:
Regular inspection, unannounced inspection, professional inspection, seasonal and holiday inspection and regular inspection.
Third, the project department construction site inspection once a week, organized by the project manager; the construction team daily inspection, organized by the person in charge of construction, the production team of their respective environments of the work procedures to adhere to the daily self-check, at any time to eliminate unsafe hidden dangers.
Fourth, surprise inspection:
In the same industry or brother units occurred major casualties, equipment accidents, traffic, fire accidents, in order to learn from the lessons, to take preventive measures, according to the nature of the accident, the characteristics of the organization of surprise inspections.
Fifth, professional inspection:
For the construction of unannounced problems, such as: construction equipment, temporary electricity, etc., the organization of a single inspection, special management.
Sixth, seasonal and holidays before and after the inspection:
For the climate characteristics, such as winter, summer, rainy season may bring hazards to the construction, in advance to make the winter four prevention, summer heat, rainy season flood control; for the major holidays before and after, to prevent workers from slackening discipline and paralysis of the mind, we must seriously improve the safety of education, the implementation of safety precautions.
VII, recurrent inspection: safety functions and project managers, safety duty personnel, should often go deep into the construction site, preventive inspections, timely detection of hidden dangers, eliminate hidden dangers, the standard construction normally.
Eight, on the inspection of hidden accidents:
Various types of inspections, must be careful and meticulous, leaving no dead corners, found hidden accidents to establish a hidden accident account, major hidden accidents to fill in the hidden accidents directive, the implementation of special rectification within a specified period of time.
Safety and technical briefing system
Strictly carry out safety and technical briefing, and conscientiously implement safety and technical measures is to carry out the policy of production safety, reduce accidents at work and realize the important guarantee of production safety. In order to ensure safe production, safety throughout the whole process of production, according to the actual situation of our enterprise, we have formulated the safety technology delivery system as follows:
1, before the commencement of the project, the person in charge of the construction and the technical person in charge of the organization of the relevant personnel in accordance with the characteristics of the project, the geographic environment and the construction method of the development of a fine safety and technical measures, to be reported to the higher level of the relevant technical and security departments for approval. Approved safety measures have the role of technical regulations, must be carefully implemented.
2, when the project started, by the chief engineer and technical personnel to organize the construction of the project manager, construction workers, safety officers, team leaders to carry out detailed technical safety briefing, so that the implementation of its rationale for the implementation of safety measures to lay the foundation for technical measures.
3, each individual project before the start of construction, the site project manager to organize the construction worker to the actual operation of the team members will be construction methods and safety and technical measures to explain in detail, and in writing to the team.
4, the construction worker according to the implementation of individual project safety and technical measures of safety facilities, equipment and safety precautions to fill in the "safety and technical delivery of the table" responsible for the implementation of the team, the individual, the implementation of the signature acceptance system.
5, the construction site of the production organizers, shall not change the safety and technical measures of the private program, such as by a reasonable proposal, should be reported in writing to the chief engineer for approval, not approved before the implementation of the original program is still in accordance with the implementation of the program.
6, the safety function should be based on construction safety technical measures, safety regulations and safety rules and regulations as a guideline, and regularly check the implementation of the site, and supervise the implementation of safety technical measures.
Pre-shift safety activity system
1, in the operation of the team into the site before the formal operation, the Ministry of the project must be on the team workers for the "three levels of safety education" and the establishment of the education record file card.
2, the project must be with the operating team leader and workers signed a contract of responsibility for production safety, and targeted written safety and technical briefings, briefings both sides must fulfill the signature procedure.
3, every day before going to work, the operation team leader must be on the team workers to carry out a comprehensive and targeted safety education activities, mainly to emphasize the day's work safety precautions, check the workers' safety protective equipment wear situation, observation and understanding of the day of the workers' emotional and psychological state.
4, on the construction machinery, equipment, in the normal operation of the former, must be two checks: a check of its installation is correct, whether there are safety guards and safety protection measures; the second check of its performance is normal, according to the first overhaul after the operation of the operating procedures, especially prone to accidents and hidden danger of the machinery must be overhauled before the shift to check the state of its safety, and found that the accident should be shut down immediately! Repair, repair and test the normal use of the machine.
5, where the pre-shift alcoholics, are not allowed to enter the construction site; all do not have the conditions of operation, are not allowed to work.
6, the project must have a written record of pre-shift safety activities, signed by the project safety officer to confirm the safety management section of the enterprise to supervise and inspect.
Safety duty system
In order to strengthen the safety management, eliminate unsafe factors in the production process and the weak links in the safety management, to put the safety work into practice according to the actual situation of my project, the development of safety production duty system.