Production and management unit special emergency plan

Production and management unit special emergency plan (selected 6)

In the study, work, life, sometimes unexpected accidents, in order to avoid causing major losses and hazards, there may be a need to formulate an emergency plan in advance. How should we prepare an emergency plan? The following is my collection of special emergency plans for production and operation units (selected 6), welcome to share.

Second, the guiding ideology

Adhere to the "prevention-oriented, combined with the prevention and rescue", the flood control policy, to ensure that the entire construction period of safe flooding. The implementation of unified command, unified scheduling, the implementation of the responsibility of the section division, the overall situation, unity and cooperation, the line into the project all staff flood control situation.

Three, the work of the target

Strengthen the flood protection, eliminate or reduce the flood disaster accident, to ensure that the flood safety construction.

Fourth, the emergency organization and responsibilities

1, the organization

Project Department flood control and flood emergency rescue leading group

Leader: Wang Yuping

Deputy Leader: Liu Changqing Li Jibing

Members: the heads of the departments and the construction section foreman

2 Duties:

(1) leader: responsible for decision-making and overall command of the accident, mobilizing the rescue personnel, equipment, materials and other resources in each work area.

(2) Deputy leader: assist the leader of the work, responsible for the specific command of the accident scene, organize the relevant personnel to the scene as soon as possible, organize and direct the rescue work.

(3) Emergency action group: after receiving the site alarm notification, the first time to the emergency rescue team leader to report the accident overview, and notify the groups responsible for emergency preparedness.

(4) Evacuation guidance group: responsible for the scene of vigilance, maintenance of order, diversion of the scene of casualties and traffic, guide rescue personnel, materials, vehicles, equipment into the rescue site, to protect the scene.

(5) on-site technical group: the development of rescue programs and demonstration, the organization of on-site rescue personnel to implement rescue measures.

(6) material equipment and vehicle protection group: organization of rescue materials, equipment, vehicles into the rescue, to assist the rescue personnel on the maintenance of equipment, rescue site organization, coordination, guidance.

(7) ambulance group: responsible for the scene of the emergency care of injured people, call 120 emergency telephone, to assist the rescue center to send the injured to the hospital in time to save.

(8) external coordination group: communication with the accident-related parties.

(9) Logistics support group: responsible for rescue personnel food and water and rescue supplies protection.

V. Preparation, maintenance and repair of emergency supplies.

(1) the preparation of emergency supplies: existing construction machinery such as excavators, loaders, pumps, generators, and planks, steel pipes, channel steel, square wood, wire, sacks, gravel, sand and other first aid supplies.

(2) A variety of first aid materials should be fully equipped, and strengthen the daily management.

Six, preventive measures

1, the construction section responsible for the project manager under the leadership of the Ministry of Flood Control Leading Group, according to the specific conditions of the construction site to prepare flood emergency plan, equipped with a variety of emergency supplies, equipment, personnel, and found that the flood immediately after the measures taken to organize the staff according to the plan to implement.

2, the person in charge of the project department should always pay attention to the local weather, and the establishment of a perfect flood flood warning mechanism, to do early prevention, early prediction, in advance, supervise the material department to do a good job of rescue materials, equipment and personnel deployment organization.

3, after receiving the emergency flood warning notice, flood control leading group of all personnel should immediately convene a meeting, and the organization of the project manager and engineering team to make preparations for the flood, and urged to do a good job of flood prevention, flood control of the emergency measures, the work area should be strengthened to patrol the inspection, with good rescue equipment and material supplies.

4, the engineering team according to the flood prevention and flood control area to do emergency measures, so that the construction site of the drainage system is smooth, power outages and reinforce the temporary power lines to ensure smooth communication.

VII, emergency response

1, once the discovery of flood danger, the duty officer should immediately notify the nearby construction workers and nearby villagers, and in the fastest way possible to report the Ministry of Flood Control and Flood Control Emergency Team Leader, the leading group leader received the danger immediately after the report to the higher management, and immediately organize rescue personnel in accordance with the plan to rescue. Rescue.

2, the project department flood control emergency leading group in accordance with the division of responsibilities immediately rushed to the rescue site, and orderly organization of the construction site rescue work. The establishment of the site command, the rescue commander-in-chief immediately organized the engineering team responsible for the analysis of the situation and remember the personnel, and immediately take measures to protect the construction right-of-way, dredge the road side ditch, and whether the evacuation of downstream residents and construction equipment, evacuation of construction workers, whether it is necessary to dredge the downstream river to make the right decision. If necessary, it should ask the relevant departments of the local government for assistance and guidance, and report to the supervisory office and the leadership of the command in time. At the same time should organize all emergency personnel according to the characteristics of the disaster and accident situation, the implementation of effective emergency measures for a short period of time, and strive to minimize or eliminate the damage, adverse factors.

Eight, reply to the production and emergency rescue summary

1, rescue rescue after the end of the project, the project leader to write a "disaster situation analysis report", and the organization of the relevant personnel to assess the adaptability of the emergency rescue plan, some of the provisions do not adapt to be revised.

2, the organization of the establishment of the unit, the owner and other relevant units will be held to resume production, the reasons for the occurrence of water-logging disasters and accidents are analyzed to determine the quality of the resumption of production should be taken, safety, environmental protection and other construction measures. According to the company's "safety first, prevention first" policy, taking full account of the current situation of the project, my project to develop effective measures to ensure normal production and operation during the flood season, to ensure the safety of collective property and the majority of staff life and property safety, to ensure the safety of the flood season.

First, the flood rescue leading group

Group leader: xxx

Deputy leader: xxx xxxx

Members: xxx xxx xxxx

Second, the division of labor : the form is omitted

Captain: xxx

Vice Captain: xxx xxx

Team members: xxx xxx xxx xxx xxx xxx xxx All team leaders

Fourth, the management staff on duty (24 hours)

< strong> V. Flood control measures

1, cement library firm, rain, and do a good job of preventing flooding measures, and often check whether the rain moisture occurs, so as not to cause losses.

2, do a good job of preparing flood control materials, such as sandbags, raincoats, pumps, etc. Prepare enough for emergency use.

3, do a good job of supplying materials during the flood season, and to ensure that the material transportation, storage process is not subject to loss, in order to ensure normal production.

4, the basement foundation water collection wells six drainage pumps to do a good job of drainage connectivity, to ensure smooth drainage to cope with the flood season rainstorms. The discharged rainwater is discharged into the city municipal storm water pipeline after secondary precipitation.

5, the office and warehouse are equipped with enough water pumps and raincoats to ensure the smooth passage of the flood season.

6, summer rain should be strengthened on the tower crane and construction hoist management, check the brake performance, strengthen the maintenance, electromechanical personnel and crane drivers take turns on the cable, motor, reinforcing the point of inspection, found that the problem is solved in a timely manner.

7, electromechanical personnel to strengthen the power distribution box leakage protector check to avoid accidents due to leakage.

8, after the rain on the construction site and basement inspection, if found problems, timely solution.

9, the template support system, scaffolding foundations and other comprehensive inspection, such as deformation, reinforcement treatment.

Six, the scene

1, in strict accordance with the division of labor, on duty, without the approval of the company's leadership, no one shall leave the post without authorization. Duty personnel every day on time to listen to the weather forecast, and timely response to the tide flood.

2, the site is equipped with a sufficient number of flood control materials and tools to prevent flooding.

3, the electrician to do a good job of daily inspection, to prevent leakage, disconnection occurs, should be twice a day to check the power equipment, lines and equipment operation, to exclude the occurrence of electric shock hidden danger.

4, should be often on the site guardrail, on the pavement, six signs and two diagrams, advertising and publicity project elevation diagrams and other facilities to prevent the occurrence of injuries.

VII, logistical life

1, flood control during the preparation of a sufficient number of living supplies to ensure that workers live.

2, to ensure that the supply of tea, improve the quality of meals and health, so that employees can eat a safe meal.

3, do a good job in the flood season to prevent mosquitoes and flies, regular disinfection, to eliminate sources of infection, to ensure that the health of workers.

Eight, material preparation plan

Table abbreviated

production unit special emergency plan 3

A general

1, the preparation of the purpose

mitigate the damage caused by flooding, to maximize the avoidance and reduction of casualties and material losses, the scientific implementation of flood control

1, the preparation of purpose

mitigate the losses caused by flooding, avoid and minimize casualties and Material losses, scientific implementation of flood control and scheduling, rescue and relief, planned and prepared flood defense, to ensure the quality and progress of the project.

2, the basic principles

Firmly implement the branch leadership responsibility system; to prevent the main, combined with prevention and rescue; comprehensive deployment, highlighting the key points; unified command, unified scheduling; a combination of engineering and non-engineering measures; mobilization of the whole site all the enthusiasm of the personnel, unity and resistance to flooding.

3, the preparation of the basis

According to the "People's Republic of China **** and the State Flood Control Law" and the State Flood Control Office of the General Office of the preparation of the "outline of the urban flood plan" and related laws and regulations, combined with the actual situation of the project, the development of this plan.

4, the scope of adaptation

This program is applicable to xxx city xxx site.

Second, the organization and responsibilities

1, the organization

xxx District xxx flood control command (hereinafter referred to as the command), the members are as follows:

Commander-in-chief: Tao Jianming (branch manager)

Deputy Commander-in-chief: xx xxx

Members: xxx

The command set up an office, the office is located in Tianshui City, West Shili Jiatong Company's sixteenth project department. Under the unified command of the Command Department, four emergency response teams are set up: communication and liaison team, medical assistance team, logistics and material support team, and safety and security team.

2, responsibilities

(1) project flood command main responsibilities

① in the company and the project under the leadership of the Ministry of Flood Control Command, the implementation of national regulations on flood control, policies and flood control headquarters decisions, instructions and branch on flood relief instructions, issued to start the plan order, directing the relevant departments to carry out emergency response.

② according to the disaster on the flood emergency plan to put forward the argument, leadership, deployment, coordination of disaster emergency response, deployment and organization of the constituent departments to implement the flood and disaster relief work, the development and revision of the "Project Department flood emergency plan".

③ When there is a major flood disaster at the construction site, the organization will hold an emergency meeting on flood prevention, listen to reports on rain, water and disaster, and arrange for the deployment of flood prevention and relief work.

④ Unified command of the project department flood emergency work, the organization of the project department related personnel in accordance with the duties specified in this plan.

(2) project flood command office main responsibilities

① implementation of national flood control work 'regulations, guidelines, policies, implementation of the project flood control headquarters decisions and higher flood control headquarters scheduling instructions.

② grasp the flood, disaster conditions, if necessary, issued flood forecasts and warnings, and prepare disaster and rescue and relief situation reports.

③ Responsible for coordinating, checking and supervising the flood control work of the project department.

④ Organize the development of flood defense program, check and supervise the implementation of various flood prevention, flood control and disaster relief measures. ⑤ Assist in organizing flood prevention and rescue teams, and organize the construction of flood prevention information system. Supervise, check and implement the reserve of relevant flood prevention materials

⑥ Complete other work assigned by the company's flood prevention command.

(3) Duties of the emergency teams

① Communication and liaison group: responsible for internal and external communication and liaison, keep in touch at all times. Once the flood accident, immediately contact the relevant departments to rescue, and at the same time report to the higher authorities.

② logistical material support group: in accordance with the requirements of the company's flood control headquarters is responsible for flood control material reserves, management, supply work.

③ medical aid group: responsible for the first time after the disaster rushed to the scene to develop rescue programs, rescue the injured, and coordinate the major hospitals to treat the injured in a timely manner.

④ safety and security group: responsible for maintaining the order of the flood rescue public ****, emergencies, the transfer of personnel to organize the evacuation and transfer of workers.

3, rainy season duty system

The project arranged rainy season duty personnel, strict implementation of 24-hour duty system, to maintain smooth communication, strictly prohibit duty personnel off duty.

4, the rainy season key inspection and monitoring content

① pit perimeter dug flooding ditches, drains, so that the waterway is smooth, not into the pit.

② southwest corner of the pit and the northwest corner of the lower, within the two wells, dug around the ditch so that the water flows into the wells, with a pump to drain away.

③ Drainage in the site to the south of the dugout, so that the water around the gathering, with a pump to drain away.

5, response measures

In the event of flooding, the command department should promptly organize and direct the relevant units and personnel to do a good job in the flood relief work, the rescue and emergency teams to go to the location of the occurrence of the disaster, and quickly put into rescue. Communication and liaison group to ensure smooth information, logistics and material security group to ensure the supply of materials, medical assistance group to do a good job in the treatment of the injured and hygiene and epidemic prevention work, safety and security group to maintain good security of the project department, crack down on sabotage, theft.

Production and operation unit special emergency plan 4

According to the property group company issued a notice and requirements, in order to do a good job of the company and the project flood prevention work, to protect the company and the owners of property and personal safety, especially the development of emergency plans.

(a), the establishment of a flood control leading group Group Leader: Deputy Group Leader: Members:

Responsibility: responsible for property management company and the project drainage facilities and equipment inspection and maintenance, to ensure that the drainage system is intact and effective; to strengthen the project patrol inspection, find leaks in a timely manner, to avoid leakage due to rain caused by the occurrence of circuit short-circuiting, damage to the equipment, in particular, the project of the high-powered room, must ensure normal power supply; responsible for the project patrol inspection, timely find leaks, to avoid leaks due to rain caused by circuit short-circuit, equipment damage, especially the project must ensure normal power supply. Must ensure that the normal power supply; responsible for the overhaul of the project lightning facilities and equipment, responsible for reserving the necessary flood control, disaster relief materials; once flooding occurs, in accordance with the flood relief plan to organize maintenance and rescue work.

(b), under the command of the flood control leadership group set up four working groups

1, the establishment of the flood control rescue group

Group leader: Members:

Responsibility: under the command of the flood control leadership group for flood control and rescue work, the project manager to organize the rescue staff of the management of the region to carry out a comprehensive examination to determine the causes of accidents in the area of waterlogging, the development of local emergency measures, the organization of staff to deal with. Measures to organize staff to deal with.

2, the establishment of equipment security group

Group leader: Member:

Responsibility: under the command of the flood control leadership group for flood control and rescue (drainage with pumps) work. The project according to the actual situation of the project, the rational organization of staff to use drainage pumps and other equipment to the serious areas of water drainage, to ensure that the management of the region normal.

3, logistics group Group Leader: Members:

Responsibilities: Under the command of the flood control leadership group for emergency communications, statistics, logistics. In the event of flooding, do a good job in the company's internal information transfer and logistical support work, after the flood, statistics and summarize the losses caused by flooding.

4, emergency rescue group Group Leader: Members:

I. Responsibility: under the command of the leading group of flood control flood assistance work. When a project occurs a major danger, timely deployment of staff to rescue.

Second, flood control materials: rain shoes, raincoats, shovels, woven bags, flashlights, wire, drainage pumps, wire tray, and so on, and set up a special person in charge to ensure that the flood control materials can be claimed in twenty-four hours.

Third, the project manager for the regional flood control responsible person; strengthen the flood control awareness training, the key parts to check in place, found that the risk of timely reporting to the department or the company leadership, and take active measures to avoid the expansion of the risk.

Fourth, during the flood control period, all flood control staff must maintain 24-hour communication tools.

Fifth, in case of more than moderate rain, the project manager must be on duty; in case of heavy rainfall, the implementation of full-time duty system.

Sixth, when the office staff on duty to receive flood control notice, should promptly notify the duty leader and all flood control staff.

vii. After receiving the owner's request for help, the duty staff of each project should notify the duty leader and the project in a timely manner. The main members of the flood control quickly to the scene to check the situation, timely disposal; when encountered in the management area of a large area of water, should quickly organize staff to the scene, mobilize pumps and other related equipment for dredging, drainage, and at the same time reported to the leadership of the company.

Eight, usually, the office staff staff and customer service staff of the project should pay close attention to the weather changes, and timely notification of the relevant staff of the weather anomalies, while doing a good job during the flood control staff on duty to sign, and major flood records.

Nine, flood control materials should be strengthened management, the end of the flood season to the warehouse for safekeeping, in order to prepare for the later renewal.

Production unit special emergency plan 5

20xx flood season rainy season is coming, in order to ensure the safety of the community and underground garage drainage, to ensure that the owners of the vehicle parking safety, to ensure that the owners of the normal order of life, according to the spirit of the work at all levels of flood prevention and control and over the years on the work of the flood prevention and control of the requirements of the actual situation of the community of xxxx, especially the development of flood control work emergency plan. We hope that our xxxx management office supervisor can perform their duties, give full play to the leadership of the supervisor, lead the staff of all departments, and make every effort to do a good job in the flood control period of the work.

First, the establishment of flood control work emergency leading group

Group leader: xxx

Group members: xxx, xxx

Emergency team: management of the department heads, office, engineering maintenance, all security

Second, the flood control work

1, conscientiously implement the implementation of the city, the district property on flood control and drainage of the spirit of the instructions, the overall command of the xxxx neighborhood flood control work. In accordance with the arrangements of the emergency leadership team, rapid, timely and effective disposal of xxxx district flood control work in all types of sudden disasters. Take effective measures, based on the neighborhood, adhere to the self-protection, self-help, to ensure the safety of the neighborhood flood season.

2, prepare enough flood control materials, according to the emergence of dangerous situations, proposed drainage, rescue programs. Responsible for checking and supervising the implementation of flood control measures; responsible for checking and supervising the preparation of flood control items; to ensure the normal order of life and property safety of owners, to put an end to the poor drainage of the sunken areas of the district and the basement water storage and other issues.

Third, flood control requirements and measures

1, the establishment of the leading group of flood control and rescue team. Specifically responsible for flood control work in the district, to ensure the safety of flood and property owners from loss; timely collection of rain, flood and other information; do a good job of flood control publicity to raise the awareness of all owners of flood control; to ensure that no accidents occur. Flood control during the period to ensure smooth communication, flood control members and duty to do 24-hour phone. Duty to stick to their posts, is strictly prohibited to leave the post, off duty. In case of heavy rain, the manager and all levels of supervisors, security shift managers must be on duty, the office to do cell phone is not turned off.

2, the establishment of security accountability. Management office leaders will be specific work distribution in place, so that each area has a direct responsibility. Can not be on time to the post and not seriously responsible for the implementation of accountability for losses caused by major losses to be held accountable.

3, contact work. Security department should have car owners to carry out regular security tips, and do a good job in the basement vehicle parking order. Customer service should know, all underground garage owners communication contact, notify the owners when necessary, with good security evacuation work. In the event of a particularly heavy rainstorm, should pay close attention to the rain situation and the smoothness of the relevant roads in the district, and do a good job of contacting all the owners of the preparatory work.

4, material preparation and specific duties of each department. According to the actual situation of xxxx district, the key parts to strengthen the patrol; the division of labor of each department is clear; to do before the rain, rain, rain, after the rain are responsible for monitoring; and make the appropriate measures to eliminate risks; the following is a clear division of labor and the duties of each department:

Ministry of Finance: make every effort to protect the lives of the Ministry of Finance, property safety. If there are special circumstances need to immediately report to the higher authorities. Self-protection at the same time, to assist other departments to do a good job of disaster relief.

Public **** Division: When the flood comes, the customer service center should do a good job and all the owners of the warm tips between the work of the disaster is relatively serious several floors, to focus on recording the flood information, if necessary, notify the owners by phone to inform the details. If there is a call for help from the owner, a detailed record of the owner's address (floor number, unit number, room number, contact information) should be made, and immediately reported to the higher authorities to apply for reinforcements.

Greening and Cleaning Department: Fully do the protection of green vegetation during the flood season and district cleaning work. In bad weather, take relevant measures to protect the growth of plants and trees. After the rain, do a good job of community health cleaning work, so that every corner of the community to maintain health and cleanliness at all times. Let live in the owners feel the environment of fresh nature, through our efforts to make the owners of the neighborhood a better living environment. If there are owners of the house or warehouse water phenomenon, should cooperate with the Engineering Department to go immediately to help owners to do a good job of cleaning and drainage work.

Engineering Department: Engineering should regularly check the water and electrical equipment in the district, flood season to appropriately increase the frequency of inspection to ensure the normal use of equipment and safety. Check the smoothness of each drainage pipe and emergency use. Rescue materials in case of danger include:

1) Emergency lamps and lanterns should be sufficiently charged for use at night.

2) A number of sandbags, the sandbags will be placed in the lower ground entrance place, can play a role in intercepting the flow, to avoid the upstream rainwater pooling to the lower ground area, resulting in danger. Several floors in the area that are prone to waterlogging are A1, A3, A5, C1 and a few other places, so pay close attention to the waterlogging situation. Immediately after the end of the disaster, the sandbags should be moved away to a hidden area, and do a good job of protection, so as not to affect the next use.

3) Prepare 5 shovels and 5 steel bars with hooks to unblock the sewers if necessary, or directly open the sewer manhole cover, which can speed up the flow of rainwater into the sewers, and avoid the rainwater from rushing into the garage or warehouse with low ground. Immediately after the end of the disaster to place the well cover to the original place to avoid danger.

4) Drainage equipment, drainage pumps and drainpipes should be placed in a place that is easy to reach and easy to put, and regularly check the work of the equipment. In case of part of the pipeline drainage is not smooth, the drainage pump should be used to drain the water from this area to other smooth areas. Clean it after use and store it.

Security Department: do a good job of flood safety and security, if there is a call for help or reinforcement, should be the first time to the scene, do a good job of rescue and defense, in case of special circumstances should be immediately reported to the higher authorities, in the critical moment to help the owners to solve the problem.

Four, according to different circumstances to start the corresponding plan

(a), the first plan:

When the weather station issued a rainstorm warning, the leading group of flood control work all in place. Summarize flood control information in a timely manner, inform the wind, water and rain. Office in accordance with their respective responsibilities, strengthen the duty, further check the implementation of the flood control emergency measures, the formation of flood control rescue teams, the implementation of rescue materials.

(ii), the second plan:

When a rainstorm strikes or the relevant departments issued an emergency alert, the flood control leading group immediately convene an emergency flood control meeting or emergency deployment. Property Office to flood control as the top priority over all work.

(C), the third plan:

When the rainstorm sudden disaster weather, the rescue team quickly organize timely inspection and dredging of drainage pipes, so that the drainage is smooth; the water inside the community and the basement to monitor the situation, and timely reporting of the disaster, if necessary, timely organization of sufficient temporary drainage equipment for strong drainage. Ensure that the owners of the normal order of life and property safety.

The above groups of departments should be conscientious, safe flood, to ensure that the owners of life and property and public **** the safety of property, the more critical moment we have to be organized and disciplined; critical moment of courage first, not afraid of danger. Always put the interests of owners in the first place. Let the leadership of the head office to rest assured that the owners are satisfied is our duty-bound responsibility.

Production and operation unit special emergency plan 6

First, the flood leadership program

1, in the flood season before the arrival of the establishment of the flood control team, the property manager as the leader, the deputy manager of the deputy leader, the members of the team for the office staff;

2, in the event of danger, the property leader must immediately arrive at the scene of the emergency rescue work, and Notify the company's customer service department is responsible for the deployment of material resources, manpower, maintenance department according to the scene, take effective measures. The Security Department is responsible for deploying personnel to cooperate with the rescue and relief. Danger occurs at night and on double holidays, the duty officer temporarily responsible for the command, and timely notification of flood control team leader and other members rushed to the scene.

Second, the flood engineering department flood control measures

1, the establishment of a special storage library for flood control equipment, the storage of flood control equipment, mainly should be drainage pumps, drainage hoses, waterproof distribution boxes, woven bags, sand, shovels, etc.;

2, flood season before the arrival of the district supervisor should be carefully inspected

(1) Rooftop platform drainage ditch is unobstructed, while the roof of the garbage clean;

(2) check the underground puddle sump pump is sensitive and effective, and the control will be opened in the "automatic" position;

(3) check the small area, outside the rainwater wells, sewage wells, rainwater pipes whether there are piles of material, and to remove

(4) maintenance team to check the power distribution room, control room and other important machine room whether there is rain leakage, if any should be dealt with in a timely manner.

(5) Flood control team leaders focus on checking rainwater outlets, drainage pipes, sewage pumps, elevator pits around the pit and previous recorded problem points.

(6) At the same time to strengthen the electrical equipment, facilities, including lightning nets (pins), cable trench inspection, inspection, found that the problem is resolved in a timely manner.

Third, the risk of handling procedures

1, cell security personnel by the flood control team leader command, part of the personnel to maintain order, part of the personnel to remove the risk, rescue equipment;

2, cell cleaning personnel to remove the water in all places;

3, the risk of the occurrence of the Office of the company to carry out a comprehensive inspection. Statistics of the damage caused by this flood and the consumption of materials, and timely replenishment of flood control materials, ready for the next flood control.

;