Hospital electricity safety emergency plan
In our ordinary daily life, it is inevitable that some events will not occur in their own expectations, in order to control the development of the accident situation, from time to time the need to prepare an emergency plan. Emergency preparedness should be how to prepare it? The following is my collection of hospital electricity safety emergency plan, for your reference, I hope to help friends in need.
First, the development of the purpose
In order to ensure the safety of medical electricity in the hospital, to ensure the safety of patient treatment and to avoid undue property losses, to ensure the safety of electricity in the hospital, to promote the institutionalization of the emergency response to blackouts and standardization of the work of emergency preparedness, the organization and restoration of power supply in a rapid and orderly manner, based on the relevant laws and regulations of the State, combined with the actual situation of our hospital, to develop this plan. The actual situation of our hospital, the development of this plan.
Second, the principle of emergency
The power outage accident handling work to implement the "prevention-oriented, unremitting" approach, follow the "unified leadership, improve the mechanism, clear responsibility, strengthen cooperation, rapid response, measures decisive The principle of the "unity of leadership, improve the mechanism, clear responsibility, strengthen cooperation, rapid response, measures decisive.
Third, the organization
Unified in the hospital under the leadership of the Ministry of Logistics Supervision Committee set up a comprehensive safeguard security power emergency response leading group, set up under the emergency repair team.
Leader: xx
Member: xxx
1, responsibilities: to do a good job of daily safety power supply, the implementation of power supply safety responsibility system, to prevent the occurrence of power outage accidents; the occurrence of power outage accidents, the emergency work of power outage accidents in a timely manner, as soon as possible to restore the power supply; according to the severity of power outage failures or accidents, the decision to start and terminate the emergency response; timely report to the upper level of the blackout situation and announced to the whole hospital. Situation and announced to the whole hospital, if necessary, request external support; the leader of the leading group is generally responsible for the fulfillment of the provisions of this plan, the members should be under the unified command of the leading group, each in its own way, each responsible for its own responsibility, cooperation, and to do a good job in the blackout accident comprehensive emergency work.
2, blackout emergency repair team:
Captain: Zhou Doli 13966724478
Members: Electrical and Mechanical Department members
Responsibilities: the occurrence of a blackout, the organization of personnel to carry out rescue operations; to the command team to report the blackout, and then summed up the lessons learned from the emergency rescue work, and do a good job of the relevant records.
Fourth, emergency procedures
Comprehensive security aspects
Responding to unexpected power outages, the Ministry of General Affairs is generally responsible for coordinating the power outage emergency repair team, Zong'ankang electrician class, power distribution room, dedicated line, etc., the relevant departments in accordance with the plan of the relevant dispositions, to minimize the impact of the blackout to reduce the possibility of all kinds of Hazards, to ensure safety.
1, planned power outage emergency procedures
(1) Electrical and Mechanical Department in the notification of power outages by phone or other forms of power outage notification, you must ask about the time of the power outage, how long and the reasons for the power outage, make a good record of it;
(2) telephone notification of the Ministry of General Affairs (63869414), the protection of the Service Acceptance Center (63869556) and the administration of the general duty shift (63869631). General Duty (63869631), make a record, and at the same time complete the preparations for the switching of backup power.
(3) during normal working hours, time permitting, should be issued by the hospital office to the hospital-wide notification (the work is coordinated by the emergency repair team leader responsible for coordination);
(4) if the time is urgent, should be notified immediately upon receipt of the notification from the power supply company to the Emergency Response Leadership Team (night notification of the General Duty staff), listen to the Emergency Response Leadership Team to arrange for the situation and explain the situation, and by the ZongAnKang Acceptance of the Department of the clinical departments to send a notice, the important departments to talk to the director of the department head nurse to clarify the time of the power outage, and make a good plan for the power outage.
(5) 30 minutes before the power outage to the power distribution room, to do a good job of backup power switching `pre-checks. When the power outage to ensure the normal start and delivery of standby power.
(6) 10 minutes before the power outage, all passenger elevators parked l floor position, posted outside the elevator.
(7) When the 1 # Furong variable dedicated line power outage, in accordance with the operating procedures, cast 2 # 18 Gang variable backup line, and verify the voltage, current data, sent to the important section of the backup power switching, verification of power supply.
(8) When the external network double power supply all power outage, start the generator power supply, to ensure that the hospital important departments, fire, emergency lighting power supply.
(9) to do a good job of standby power, standby power generation operation records and records after the restoration of utility power supply.
(10) After the restoration of normal utility power, verify the power supply of each department and make a good summary.
2, sudden power outage emergency procedures
(1) a temporary power outage, you should immediately ask the power company by phone, ask the reason for the power outage and the duration of the power outage.
(2) Notify the General Affairs Department (63869414), the Security Service Acceptance Center (63869556) and the Administrative General Duty (63869631) by phone and make a record. Emergency repair captains refer to the above emergency procedures for planned power outages and do a good job of notification and explanation.
(3) electromechanical group operators should immediately prepare to switch the backup second power supply, within 30 seconds to complete the switch. End power supply due to the second attached hospital of An Medical University in the installation of residual current protector in each floor when the PA device is not installed in place, the need for emergency rescue team members to the inpatient department of the north and south building, administrative building, outpatient and emergency building, laboratory building and other floors to go floor to floor to manually reset can be a normal use of electricity.
(4) For various reasons, dual power supply can not start, should be started within 5 minutes standby generator to ensure that the hospital's important departments, fire, emergency lighting power supply.
(5) Do a good job of backup power, generator power generation operation records.
(6) hospital internal reasons for power outages, to identify the cause of the power outage, high-voltage circuits or low-voltage electric practice. If the high-voltage circuit failure, should be timely with the power supply department repair class contact, as soon as possible to restore, to ensure that the electricity; if the hospital low voltage circuit failure, the property electromechanical repair personnel should quickly identify the cause of the operation in accordance with the provisions of the restoration of power supply, and do a good job of summarizing the aftermath.
3, departmental sections of the emergency procedures
(1) each section received a notice of power outage, should be allowed to cut off all the equipment and its power supply, to be put back into use after the circuit returns to normal.
(2) After receiving the notice of the power failure, immediately make preparations for the power failure. If there is a patient rescue use the backup power.
(3) after a sudden blackout, immediately look for ways to rescue patients and their operation of the power to maintain the rescue work, and open the emergency lights lighting and so on. And should promptly notify the reception center or the general duty.
(4) Critical patients using a ventilator in surgery should normally have a simple respirator next to the machine, in the event of a sudden power outage, health care workers immediately disengage the ventilator, the use of simple respirator to maintain breathing. Patients using electric nitrogen suction, use a 50ML syringe to connect the nitrogen suction tube to suction nitrogen.
(5) such as two lines are suddenly power supply failure, the hospital generator power supply, medical staff should first ensure that the patient rescue; nurses should be calm and collected, on the ventilator using both hands to hold the ball method, on the monitor using manual measurement of blood pressure and pulse, electric nitrogen inhalation is used to use a 50 ml syringe connected to the nitrogen suction tube suction, such as close observation and please change, the rest of the staff immediately notify the Department of Electrical and Mechanical Services, and the use of emergency lights to notify the phone. The rest of the staff will immediately notify the Department of Electrical and Mechanical Services by phone, and use emergency lights for lighting.
(6) Strengthen the inspection of the ward, appease the patients, and pay attention to fire prevention and theft.
(7) After the elevator encountered a sudden blackout, the logistics staff should do a good job of passenger ideological work, call to the outside, and use manual methods to put all the passengers out.
Medical support:
In order to effectively prevent, timely control and reduce the harm of sudden power outages, guidance and standardization of such events on the hazards caused by medical safety, medical needs to be coordinated to do the following work.
(1) Each department should have flashlights, candles, oxygen cylinders, etc., regularly checked, maintained in good condition, and placed within easy reach;
(2) to strengthen the ward rounds, to reassure the patients, pay attention to fire prevention, anti-theft;
(3) the normal power supply is restored, special equipment, such as microcomputer-controlled CT, MRI, etc., should be re-tested to the standby state.
V. Procedures for dealing with large power outages caused by sudden fires in the distribution room
1, immediately notify the security service acceptance center (63869556) and the emergency repair team leader (the technical person in charge), the size of the fire should be explained in the phone call, the scope of the power outage. The duty officer should open the lock of the distribution room door to facilitate the entry of emergency personnel.
Under normal circumstances, the distribution room fire, its configuration of automatic gas fire extinguishing device will automatically start. If you do not start the automatic device, repair personnel will be affected by the line or equipment blackout, with the fire extinguisher in the distribution room to effectively extinguish the fire. Be careful not to get smoked out while extinguishing the fire.
Personnel entering the distribution room to rescue should accept the command of the person on duty or supervisor of the distribution room to avoid expanding the scope of the blackout.
In accordance with the policy of prevention-oriented, in the usual way to be equipped with sufficient fire-fighting equipment and a certain amount of fire breathing apparatus.
Six, to deal with sudden flooding caused by large-scale power outage procedures
1, in accordance with the policy of prevention, to do a good job in the rainy season before the arrival of the distribution room of the water disaster preparedness, equipped with flood control tools, check the drainage equipment, to ensure that the drainage pumps can work properly.
2, in the event of heavy rain on duty to strengthen the power distribution room patrol, found that the power distribution room has a water hazard occurs on duty should be immediately to the captain of the emergency repair team, the service acceptance center to report the situation and the organization of rescue.
3, if the water does not constitute a hazard to the safe operation of power distribution equipment, pay close attention to the changes in water conditions, group personnel for drainage and plugging.
4, if the water on the safe operation of power distribution equipment constitutes a hazard, should immediately cut off the power supply to the equipment that may enter the water, and at the same time to ensure that the service acceptance center will report the situation to the head of the Ministry of General Affairs of the Emergency Leadership Team and the affected departments, explaining the reasons for the power outage, the scope of the power outage, to ensure personal and equipment safety, and organization of the personnel to carry out the drainage and plugging leaks.
VII. Procedures to deal with large-scale power outages caused by windy weather
1. When windy weather occurs, the duty officer should pay attention to the operation of the overhead lines during the patrol.
2, found that there are wires were blown, the line should be disconnected from the power switch for blackout processing, while the security service acceptance center will report the situation to the captain of the emergency repair team, the Ministry of General Affairs of the Emergency Leadership Team leader and the affected sections to explain in detail the reasons for the blackout, the scope. In order to ensure the personal safety of repair personnel in the case of the organization of repair to restore power supply.
3, if you can not blackout should be set up at a safe distance away from the protective barrier to prevent people from approaching, and at the same time notify the power supply repair department to deal with.
Eight, to deal with lightning strikes caused by large-scale power outage program
1, in the usual lightning facilities to maintain, to ensure that the normal operation.
2, in thunderstorms caused by lightning strikes power distribution equipment and facilities blackout, should be immediately to the emergency repair team leader, the Ministry of General Affairs emergency leadership team leader to report the situation explains the reason for the blackout, the scope.
3, the organization should be in a safe situation to check the line, troubleshooting power delivery.
Nine, safeguard measures
1, the mechanical and electrical department staff should do a good job of generator maintenance daily, to ensure that the generator is ready to use.
2, electricians usually have to master the knowledge of power supply and operating norms, the Department of Electrical and Mechanical Services should do a good job of daily training, general affairs is responsible for the assessment.
3, clinical departments routinely equipped with emergency lights, torches and other lighting, regular checks, to maintain a perfect state.
;