Xi'an Duoge decoration Shijiazhuang Ruibowen decoration plumbing remodeling notes

One, the kitchen water transformation kitchen water transformation mainly includes faucets and water heaters, the general family is the kitchen and bathroom **** with a water heater, so in the water renovation must think about the location of the water heater installation, so that you can determine the location of the installation of hot and cold water pipes, water renovation.

Installation should pay attention to the cold, hot water on the water pipe mouth height is consistent, the mouth should be two centimeters higher than the wall, hot and cold water pipe spacing is 15 centimeters, this standard should be strictly enforced.

Cold and hot water pipes are into the wall practice, grooving need to check the depth of the groove, hot and cold water pipes can not be the same groove.

Electric water heaters generally need to be fixed on load-bearing walls, such as special circumstances, fixed on non-load-bearing walls to do fixed brackets, and the top floor to have enough space to do fixed brackets, need to communicate with the water heater manufacturer in advance in order to determine the location of the water heater outlet.

Two, bathroom water renovation bathroom water renovation content is more, wash basin, toilet, bathtub and washing machine installation location, whether you need hot water pipe should be realized to think well, the floor drain sewer treatment should be in place, otherwise it will cause the phenomenon of water return later.

Water meter installation location should be easy to read, water meter, valve distance from the wall should be appropriate, to facilitate the use and maintenance.

Toilet water inlet outlet as far as possible placed in the toilet can be blocked by the toilet in the line of sight.

Conjoined toilet should be based on the model to determine the location of the outlet, generally to stay in the toilet drain directly to the left of 200

mm.

Three, the living room circuit remodeling living room needs to be installed wiring lines include power lines, lighting lines, air conditioning lines, TV lines, telephone lines, computer lines, doorbell lines and so on.

The location of the wires need to be considered in advance, do a good job of reservation, in general, on the

Sofa in the edge of the desire to stay in the telephone line mouth, in the door door to stay on the inside of the doorbell line mouth, drinking fountains, humidifiers, and other equipment to reserve a power port, generally speaking, the living room should be left at least five power line mouth.

Air conditioners, DVD players and other unplugged are in

Standby state of things best equipped with switches on the outlet panel, so that when you do not use directly off, will not waste electricity.

Four, bedroom circuit remodeling bedroom circuit remodeling generally

including power lines, lighting lines, air conditioning lines, telephone lines and computer lines.

The upper part of the headboard is reserved for the power cord, and the 5-hole plug board with switch is appropriate, which can reduce the trouble of bedside lamps without a switch.

Dresser should be reserved above the power

junction port (hair dryer); in addition to consider the dresser mirror should be above the reflective light, in the box next to another switch; bedroom lamps and lanterns are best to use dual-control switches, one installed on the outside of the bedroom door, the other switch is installed in the headboard

on the upper side of the side or the bed side of the easier to do parts of the bed so that the night when you go to sleep, you do not have to get up to go to the bedroom door The other switch is mounted on the top of the nightstand or next to the bed.