How to install the air conditioner hang-up machine

Air conditioning installation should have certain professional skills and tools, and it is best to ask professionals to operate it.

First, determine the installation location and punch holes.

The second is to install the fixed hanging plate.

Third, install connecting copper pipes, drainage pipes, power lines and communication lines in the machine and wrap them with packaging tape.

The fourth is to hang the inner machine on the hanging board after passing through the hole in the wall.

Then install and fix the outdoor unit.

Attached to the specification requirements of air conditioning installation location:

5.5. 1 indoor unit:

1) There should be no heat source and steam source near the installation location.

2) There should be no obstacles that hinder air circulation in the installation position.

3) A place where indoor air can keep good circulation and send indoor cold and warm air.

4) Convenient drainage.

5) Choose a place that can bear the weight of the indoor unit without increasing the running noise and vibration.

6) Places with installation and maintenance conditions.

7) A place convenient for installing pipes and wiring sockets.

8) Avoid the place where oil fume and oil droplets fall.

9) Distance to TV and audio equipment1m.

10) Select a place where condensed water can be easily discharged and connect the outdoor unit.

1 1) Keep away from flammable items, especially movable items such as curtains and clothes.

12) Ensure the distance from the wall, ceiling, decoration and other obstacles. The most basic requirements for the installation position of the indoor unit are: the left and right sides are not less than 12cm, the upper side is not less than 15cm, and the lower side is not less than 200cm (using split wall hanging machine).

Outdoor unit:

1) Noise and airflow generated by exhaust air do not affect neighbors.

2) In a well-ventilated place, ensure that the outdoor unit is well ventilated.

3) There should be no obstacles that hinder the air inlet and air outlet of the unit near the outdoor unit.

4) The installation position should be a solid place that can bear the weight and vibration of the outdoor unit, so as to avoid the spread and amplification of noise and vibration and make the installation work safe.

5) There is no place where combustible gas and corrosive gas leak.

6) Installation in the following places may cause air conditioning failure. If unavoidable, please contact the service center:

A. Ministry of Oil.

B. Coastal saline-alkali areas.

C. In places with sour gas (such as sulfide hot springs).

D frequency conversion facilities, such as radio equipment, welding machines and medical equipment, have high electromagnetic interference.

E. Avoid installing on the side with heavy wind and sand, high frequency of factory smoke exhaust and sea breeze blowing.

F. Special environmental conditions.

7) Try to choose a ventilated place to avoid rain and direct sunlight. If it is inevitable, use a canopy to protect it, but be careful not to interfere with the heat dissipation of the condenser.

8) Try not to raise animals and plant flowers and trees in the installation site.

9) Please avoid places where flammable and explosive gases may leak.

10) It is easy to install and operate, and the strong wind cannot blow, so it is dry and ventilated.

1 1) The height difference of the connecting pipe of the split hook shall be within 5m, and the length of the connecting pipe shall be within 10m.

12) The height difference of the connecting pipe of the cabinet machine is within 10m, and the length of the connecting pipe is within 20m.