Emergency plan for neighborhood property
In daily life or work and study, sometimes there will be some unexpected accidents, in order to avoid things worse, often need to pre-prepared emergency plan. How do we write an emergency plan? The following is what I have organized for you in the community property emergency plan, welcome to read and collect.
In order to ensure that the community fire emergency work can be carried out in a timely and orderly manner, to ensure that the residents of the community in the relief can be evacuated in a timely manner, rescue, escape and self-rescue, the fire caused by the loss of the minimization of losses, the development of this plan.
Second, the organization and responsibilities:
1, Command
(1) fire accident commander:
Responsibilities: Decision-making and command according to the actual situation
(2) on-site command: Service Manager: Order Maintenance Department Supervisor:
Work Duties: According to the order of the commander-in-chief, responsible for the fire accident scene command, organization and coordination of rescue and relief.
2, the work of the organization and responsibilities
(1) alarm and remedial group
Group leader: Order Maintenance Department, a shift manager
Members: alarm: one, the main fire extinguishers: three
Responsibilities: Responsible for fighting incipient fires, to the Emergency Response Headquarters to report on-site conditions and according to the orders of the Commanding General, to the Public Security and Fire Services Alarm
Work responsibilities. p> (2) Evacuation Group
Group Leader: Head of General Affairs Department:
Members: Evacuators around the fire site: two order maintainers, one garage evacuator, one pacifier: one customer
Responsibilities: Responsible for organizing and guiding the evacuation of people from the area where the fire broke out to the safety zone
(3) Guidance Group
Group Leader: Second Shift Leader of the Order Maintenance Department
Responsibilities: Responsible for organizing and guiding the evacuation of people to the safety zone. Maintenance Department, second shift head
Members: one order maintenance staff
Responsibilities: responsible for the rescue vehicles and personnel outside the area to guide
(4) vigilance group
Leader: the shift order maintenance minister
Members: two order maintenance staff
Responsibilities: in the fire around the part of the vigilance, to protect the scene, to prevent the entry of unrelated people
(5) the fire is not a fire, but a fire, the fire, the fire, the fire, the fire, the fire, the fire, the fire, the fire, the fire, the fire, the fire, the fire, the fire, the fire, the fire.
(5) medical rescue team
Team leader: sanitation shift manager
Members: two cleaners (responsible for bandages), two order maintenance staff (responsible for lifting the stretcher) Responsibilities: Responsible for the rescue of the injured and transfer to the hospital
(6) logistics team
Team leader: receptionist
Members: two cleaners
Responsibilities: Provide timely and effective support to the fire, and to prevent the fire from spreading to other parts of the city.
Responsibilities: Responsible for the timely provision of material resources needed to carry out ambulance work
(7) communication and liaison group
Group leader: Integrated Services Department of Internal
Responsibilities: Responsible for the timely liaison with the relevant personnel
(8) engineering and technical group
Group leader: maintenance
Responsibilities: Responsible for the district power outage (in accordance with the needs of the ambulance work)
Responsibilities: Responsible for neighborhood power outages (as needed for rescue work).
Third, emergency treatment
When a fire, the discoverer should immediately to the Ministry of Security alarm, order maintenance department received the alarm should immediately go to the scene to deal with, and timely report to the leadership of the service, according to the fire whether to start the emergency plan. At the same time, according to the scene should follow certain principles of treatment: first personnel, after the property; first valuable, after the secondary; first extinguish the big, after the small; first isolated, after the centralized methods and principles of fighting.
(a) into the local fire risk, the fire is very small, very easy to extinguish, found in a timely manner to the Security Office alarm at the same time, the use of on-site appliances to fight, security personnel to the scene, depending on the circumstances of the other parts of the fire extinguishers can be mobilized to fight.
(b) If the fire is large, there is a possibility of spreading, the Department of Security should immediately report to the public security and fire department alarm, at the same time to the leadership of the service, and notify the relevant personnel to start the emergency plan, the relevant personnel were notified of the automatic composition of the working group, quickly in place, according to their respective duties to carry out the work.
(1) Alarm and fighting group should immediately mobilize its members and fire extinguishing equipment to fight and control the fire, and promptly report the fire to the command.
(2) evacuation group to quickly open the fire part of the evacuation door to organize the fire according to the evacuation line to the safety zone.
(3) guidance group to send personnel vehicles to the east gate to meet the fire truck and guide to the scene.
(4) in the public security fire to the scene, the fire fighting group withdrew from the fire, turned into a vigilance group, to assist the public security department to do a good job of peripheral vigilance.
(5) medical rescue group according to the scene to do a good job of treating the injured and according to the injury to the hospital in a timely manner.
(6) logistics and communications group in this process to do a good job of related logistics and personnel communication links.
The neighborhood property emergency plan 2
According to the group issued a notice and requirements, in order to do a good job in the company and the project flood prevention work, to protect the company and the owners of property and personal safety, especially the development of emergency plans.
First, the organization and responsibilities
(a), the establishment of a flood control leading group leader: deputy leader: members:
Responsibilities: Responsible for the property management company and the project drainage facilities and equipment inspection and maintenance, to ensure that the drainage system is intact and effective; to strengthen the project inspection, find leaks in a timely manner, to avoid leakage caused by circuit short circuits. Short circuit due to rain leakage, equipment damage problems occur, especially the projects. High distribution room, must ensure normal power supply; responsible for the project lightning facilities and equipment overhaul work, is responsible for reserving the necessary flood control, disaster relief materials; once flooding occurs, in accordance with this flood relief plan to organize maintenance and rescue work.
(b), under the command of the flood control leadership group set up four working groups
1, the establishment of flood rescue group
Group leader: Members:
Responsibilities: under the command of the leading group of flood control flood rescue work, the project manager to organize the rescue personnel of the various management areas to carry out a comprehensive inspection to determine the causes of accidents in the area of waterlogging, the development of local emergency measures. Measures to organize personnel to deal with.
2, the establishment of equipment security group
Group leader: Members:
Responsibilities: Under the command of the flood control leadership group for flood control and rescue (drainage with pumps) work. Each project according to the actual situation of the project, the rational organization of personnel using drainage pumps and other equipment for waterlogged serious areas of drainage, to ensure that the management of the region normal.
3, logistics support team leader: members:
Responsibilities: under the command of the flood control leadership team for emergency communications, statistics, logistics support work. In the event of flooding, do a good job in the company's internal information transfer and logistical support work, after the flood, statistical summary of losses due to flooding.
4, emergency rescue team leader: members:
Responsibilities: Flood control leading group under the command of the flood assistance work. When a project occurs a major danger, timely deployment of personnel to rescue.
Second, flood control materials: rain shoes, raincoats, shovels, woven bags, flashlights, wire, drainage pumps, wire tray, etc., and set up a special person in charge to ensure that the flood control materials can be claimed 24 hours.
Third, the project manager for the regional flood control responsible person; strengthen the flood control awareness training, the key parts to check in place, found that the risk of timely reporting to the department or the company leadership, and take active measures to avoid the expansion of the risk.
Fourth, during the flood control period, all flood control personnel must maintain 24-hour communication tools.
Fifth, in case of more than moderate rain, the project manager must be on duty; in case of heavy rainfall, the implementation of full-time duty system.
Sixth, when the office staff on duty to receive flood control notification, should promptly notify the duty leader and all flood control personnel.
VII, the project duty officer received the owner's help information, should promptly notify the duty leader and the main members of the project flood control quickly to the scene to check the situation, timely disposal; when encountered in the management area of a large area of water, should be quickly organized to rush to the scene, mobilizing pumps and other related equipment for dredging, drainage, and at the same time reported to the leadership of the company.
VIII, usually, the office staff and the project customer service staff should pay close attention to the weather changes, and timely notify the relevant personnel of the weather anomalies, while doing a good job during the flood control duty personnel signatures, and major flood records.
IX, flood control materials should be strengthened management, the end of the flood season to the warehouse for safekeeping, in order to prepare for the later renewal.
Community Property Emergency Plan 3
In order to deal with water and power outages, to ensure that the normal working life of the community, especially the development of water and power outages to deal with the program for the relevant departments for reference and implementation.
First, the principle of emergency treatment
Subdivision of the planned water and power outages and sudden water and power outages, reasonable arrangements for related work, so that the community work as soon as possible to return to normal.
Second, the water and power outage processing process
1, belonging to the planned water and power outages, should be 24 hours in advance to notify the owners (tenants), the work unit, in the buildings, lobby bulletin boards and community electronic displays to publish a notice. Register the notice on the issuance of notice sheets to save. Normal overhaul and maintenance of related equipment, to the owners (tenants) patiently explain to obtain support and cooperation. Temporary water supply by using the living water tank in case of water outage. If the water supply is out for a long time, contact with water supply and fire-fighting units to solve the problem of water supply. The power outage automatically start generator temporary power supply.
2, belonging to the sudden stoppage of water and electricity, should be issued within ten minutes of a brief notice, a written notice within one hour, including the reasons for the expected resumption of water supply, power supply time. And will notify the Zhang towel in each building, lobby prominent location, and will save the document. Overhaul and maintenance of relevant equipment, explain patiently to owners (tenants) to obtain support and cooperation. Utilize the living water tank for temporary water supply in case of water outage. If the water is out for a long time, contact with the water supply and fire fighting units to solve the water supply. Power outages automatically start generator temporary power supply.
Three, the management of the division of labor requirements of the team
(a) Office
1, timely printing, posting of water and power outages notice.
2, arrange for backup water, start the temporary power supply device.
3, to the owners (tenants) patiently explain the reasons for water and power outages.
(2) guard class
1, strengthen the water, power outages during the patrol defense.
2, the water, electricity maintenance vehicles to guide, to assist the maintenance service work.
(C) maintenance class
1, water, power outages during normal maintenance work.
2, for the failure caused by water and power outages, timely repair and troubleshooting, restore water supply and power.
Fourth, the preparation of emergency materials
1, storage tanks, living water tanks
2, emergency lights, generators
;