AEC’s U.S. companies

In 2003, AEC officially entered the Chinese market and is committed to the promotion and development of intelligent power distribution products in the domestic market. So far, in addition to the China representative office headquarters established in Shanghai, it has also established 19 offices in Beijing, Guangzhou, Wuhan, Chongqing and other places with 62 sales staff, covering all provinces in mainland China. AEC has fully participated in China's economic construction in various fields such as infrastructure, metallurgy, petrochemicals, and energy. It has achieved success in a large number of key projects and has received praise from design institutes, parties, and other parties.

AEC owns the legal AEC trademark and domain name in China. AEC intelligent power distribution instrument

AEC 6800 intelligent power distribution instrument

can monitor all electrical parameters of the power system and has switching input and output functions. It has strong expansion capabilities and can be widely used in various power automation situations. This series of products adopts ultra-high brightness and environmentally friendly VFD displays recommended by Europe.

AEC 4600 intelligent power distribution instrument

can monitor the main electrical parameters of the power distribution system and also has

switching input and output functions. It can be used to realize the automatic function of power distribution system.

AEC 4610 intelligent power distribution instrument

can monitor the three-phase current of the power system and has switching input and output functions. It can be used to realize the automation function of power distribution system.

AEC 4620 intelligent power distribution instrument

can monitor all electrical parameters of the power system and also has

switching input and output functions. It can be used to realize the automatic function of power distribution system.

AEC 4630 intelligent power distribution instrument

can monitor the main electrical parameters of the power system and has switching input and output functions. It can be used to realize the automation function of power distribution system.

AEC 4900 low-voltage motor protection controller

It is an automatic controller that integrates protection, monitoring, measurement and control. It is suitable for 380V low-voltage motors and can achieve 4 remote functions.

It is suitable for forming a distribution automation monitoring system. Used in low-voltage motor protection, motor control, and electrical parameter monitoring.

AEC5100 multi-circuit monitoring unit

It is suitable for power distribution circuits with relatively simple monitoring system requirements.

It has 16DI and 8DO, and can be monitored with one AEC5100 Operating status of 4 to

8 loops.

AEC5500 multi-circuit monitoring unit

It is suitable for low-voltage distribution switch cabinets

(drawer cabinets) that have relatively simple monitoring system requirements. 9 current, 3 voltage inputs. One AEC5500

can monitor the operating status and electrical parameters of the entire low-voltage switch cabinet.

AEC comprehensive protection measurement and control unit

2013 line comprehensive protection measurement and control unit

Has complete voltage and current protection functions and complete management functions

< p>Can. The control logic preset at the factory can realize all the functions of line protection. Specially improved to suit Chinese users.

2015 bus tie protection measurement and control unit

The control logic preset specifically for the protection tie switch can realize all functions of bus tie

protection. In addition, it also has a simple bus link automatic switching function.

Suitable for Chinese users.

The 2031 capacitor protection measurement and control unit

Specially meets the requirements of high-voltage capacitors, providing complete voltage

and current protection functions and complete management functions. Operation tips and fault information

All information is Chinese.

2032 PT monitoring unit

Dedicated to the protection and monitoring of PT in substations. With the 2033PT

parallel operation box, it can realize the PT parallel function and is suitable for single bus points.

Segment wiring substation.

2103 Standby power automatic switching control unit

It has the functions of incoming line automatic switching and bus link automatic switching. Suitable for automatic switching of substations and backup power supplies with voltage levels of 220KV

and below.

2026 low-voltage transformer protection measurement and control unit

It is mainly designed for the protection of 6kV~10kV factory transformers.

It has all the protection and measurement and control functions of factory transformers. .

2041 Motor Protection Measurement and Control Unit

The prefabricated programmable logic meets the requirements of motor protection. At the same time

it has measurement and control functions and powerful communication capabilities, making it suitable for high

voltage asynchronous motors.

2042 Large Motor Protection Comprehensive Protection Unit

Concentrates various protection features of large and medium-sized motors. At the same time, it also has measurement and control functions, combined with powerful communication capabilities, and is suitable for large and medium-sized high-voltage synchronous motors and large asynchronous motors.

AEControl power monitoring system

It is an internationally advanced large-scale real-time intelligent power monitoring system based on an open client-server structure. The system integrates multiple functions such as data collection and control, data processing and storage, real-time data and graphic display, advanced analysis and processing, etc., and can be widely used in electric power

Various fields of intelligent power distribution, including dispatch automation, SCADA/EMS systems, integrated substation automation, distribution network automation, power plant/DAS computer monitoring systems, factory power distribution automation systems, and energy billing management.

According to AEC's strategic plan, more new products and better services will be provided in the near future, especially in power quality monitoring and all-round automation.

etc.

The growth of AEC cannot be separated from everyone's full support. AEC sincerely wishes you success and ideal results in the registered electrical engineer professional examination

!