The use of cooling facilities and equipment to achieve the appropriate humidity and low temperature conditions of the construction of the warehouse, a variety of cold storage equipment and facilities consumables and accessories procurement, library board construction, inside and outside the machine lifting, laying connecting pipelines, pipe insulation, drain installation, line erection and connection, installation of the control system, inside and outside the machine power line wiring and the process of system debugging.