Emergency plan for heatstroke prevention and cooling

About 2021 heatstroke prevention and cooling emergency plan sample (general 8)

In learning, work or life, sometimes there will be sudden some unpredictable events, in order to reduce the harm caused by the accident, it is very necessary to prepare in advance a specific, detailed, targeted emergency plan. How to write an emergency plan to play its role? The following is what I have organized for you about the 2021 heat stroke prevention and cooling emergency plan example (general 8), welcome to read, I hope you can like.

Prevention of heat stroke emergency plan 1

The advent of summer, the weather station repeatedly issued yellow high temperature warning signals, the maximum temperature is greater than or equal to 35 degrees Celsius is defined as "high temperature day", more than five consecutive days of "high temperature days" called "Continuous high temperature". In order to protect the health of workers, and constantly improve labor conditions, improve labor productivity, the company to take practical and effective measures to prevent the heat of the plant cooling work.

A health care measures

1, the supply of cool drinks work, the high temperature and open-air work workers, should guarantee the supply of sufficient cool drinks in line with health standards.

2, to strictly implement the working hours system, rationalize the arrangement of work and rest time, to ensure that the high temperature operation workers have enough rest time, strict control of overtime.

3, do a good job of preventing heatstroke drugs and heatstroke first aid preparations, regular in-depth workshop tour.

Second, technical measures

1, high temperature workshop heat prevention and cooling, should be the first to use natural ventilation, hot location of the single span and double span workshop, should try to use the natural ventilation mainly through the wind.

2, the workshop has been installed axial flow blower to take the form of convection flow wind reasonable re-installation, effectively reducing the heat cycle within the workshop.

3, part of the window for the transformation, rational allocation of raw paper and finished paper placement, so that the entire workshop has sufficient air circulation.

4, in order to reduce the solar radiation heat into the workshop, can be considered in the workshop around the iron canopy, insulation, ventilation roof installed water spray, spray device, effectively reduce the temperature of the direct sunlight outside, the better to make the hot air in the workshop to the outside.

5, the high temperature equipment for strict monitoring, to prevent damage to the machine parts caused by steam leakage, thus affecting the workshop temperature rise.

Three, organizational measures

1, in the hot season in order to ensure that workers have enough rest, as much as possible to streamline the meeting, to have to work, avoid overtime, overtime.

2, in the summer season should be based on the production process, as far as possible to adjust the labor organization, take the method of shift work, shorten the time of a continuous operation, to strengthen the work of the rotation rest.

3, the workers should strengthen the publicity and education of heatstroke prevention and first aid.

Prevention of heat stroke emergency plan 2

Into the summer season, the temperature rises, in order to effectively do a good job of summer construction site heat stroke prevention and cooling work, to protect the health of workers, to prevent heat stroke and other types of production and safety accidents caused by hot weather workers, specially formulated this approach.

First, the security department should go deep into the workshop, publicize the knowledge of heat stroke prevention and first aid knowledge of heat stroke, and improve the awareness of safety precautions.

Second, the security department and the office should pay close attention to the meteorological forecast of the hot weather.

1, the maximum daily temperature is greater than or equal to 33 degrees Celsius, the start of heat stroke prevention measures: must ensure that the workshop drinking water supply is sufficient. Arrange for a person in charge of drinking water refrigeration, to ensure that at least 3 times a day the supply of ice water (but ice water can not be too cold).

2, the maximum daily temperature is greater than or equal to 35 degrees Celsius, the start of high-temperature measures: workshop operations to take shift work, shorten the continuous operation time of the staff; in addition to ensuring that the Ministry of Administration to ensure adequate supply of drinking water, another need to arrange for the cooking of summer drinks, such as green bean water, plum soup, ginger salt tea, watermelon, etc., and supplement the saline drink in due course.

3, the maximum daily temperature is greater than or equal to 37 degrees Celsius, the start of sustained high-temperature heat prevention measures: the workshop operation to take the shift shift operation mode, employees shall not be more than the national continuous operation time, shall not be arranged for outdoor open-air work; the Ministry of Administration, in addition to ensuring that there is an adequate supply of drinking water, cooking summer drinks, and supplemented with saline beverages at the right time. Workshops must be equipped with human Dan, patchouli, ten drops of water and other drugs to prevent heatstroke.

4, high-temperature subsidies for the Ministry of Human Resources in accordance with the company's "high-temperature fee regulations.

3, the Procurement Department with the Office of the implementation of heat stroke items, such as: Ren Dan, patchouli, ten drops of water. Production Equipment Department combined with the actual production situation, the development of heat stroke medicine program, timely procurement and distribution to the workshop groups.

Fourth, check the workshop summer cooling equipment. Production Equipment Department of the damaged fan, air conditioning and the need for new cooling equipment to make statistics, reported to the company for approval after the organization of procurement or maintenance. Ensure the normal operation of the workshop cooling equipment.

Fifth, the Department of Administration to actively improve the living environment of workers. Comprehensive overhaul of the dormitory area screens and exhaust facilities.

Six, effectively do a good job of health and epidemic prevention. Strengthen the drinking water, food hygiene management, to avoid food spoilage caused by poisoning. The living area should carry out regular health checks, regular disinfection of the premises to avoid the spread of disease and epidemic.

Seven, do a good job of summer fire prevention. For the summer heat, burning mosquito coils, the use of electrical appliances and other easy to occur fire accidents in the actual situation, must strengthen the fire prevention measures. Security sector to carry out regular inspections of flammable places throughout the plant, found that the problem is immediately dealt with, and at the same time, according to the provisions of the fire-fighting equipment.



I. The purpose and requirements of the exercise.

In order to implement the occupational health and safety management system standards, to deal with potential heat stroke accident hazards, to ensure the personal safety of the workers, to clarify the emergency rescue procedures, to ensure that the first aid plan is implemented in an orderly manner, especially the preparation of the plan.

Second, the preparation of the basis.

1, "Chinese People's **** and State Safety Production Law".

2, "Regulations on the Safe Management of Dangerous Chemicals".

3, "production and management unit safety production accident emergency plan preparation guidelines"

Third, the drill time, location, and participants in the drill.

1, drill time: xx, xx, xx, 20xx, 13:00 - 13:30.

2, drill location: production department xx cross-cutting unit operation side 1 # stacking peripheral area.

3, to participate in the exercise personnel: exercise leadership group, A operation area, warehouse A class, turning package group.

4. Exercise leadership team.

1, leader: xx.

2, deputy leader: xx (command), xx (organization), xx (organization).

3, planning: xx.

4, group members: xx, xx, xx.

V. Rescue equipment and materials:

First aid kit (medical alcohol, Rendan, ten drops of water, patchouli, bandages, disinfectant), communication tools, towels, mineral water, electric fans.

Six, the exercise process:

1, cross-cutting employee xx in the 1 # stacking operation, heatstroke collapsed on the ground (simulation of the accident), the shift leader xx found, notify the shift operations chief xx.

2, operations chief xx received the accident report, immediately reported to the exercise leading group, while starting the emergency plan, organizing the The emergency plan was activated at the same time to organize on-site salvage.

3, xx: in the rescue at the same time to isolate the scene protection, evacuation of unrelated personnel, protection of the accident scene.

7, first aid steps:

1, moving: the operation chief xx organization site personnel will heat stroke employees xx quickly lifted to the ventilation, cool, cool place, make it lying down, head elevated, and unbuttoned, loosen the belt, cuffs.

2, cooling: the patient's head covered with a wet towel, with cold water bath, to accelerate heat dissipation, but can not be directly to the patient blowing, to prevent the cause of cold.

3, hydration: if the heat stroke patients awake, no nausea, vomiting, can drink salt water, play a role in cooling, replenish blood volume. When replenishing water, do not rush to replenish a large amount of water to avoid causing vomiting, abdominal pain, nausea and other symptoms.

4, to promote wakefulness: If the patient has lost consciousness, you can finger pinch the middle of the man, Hegu and other points, so that it wakes up. If breathing stops, artificial respiration should be implemented immediately.

5, transfer: for severe heatstroke patients, must be sent to the doctor in time. Transportation should be as physical as possible on the way to protect the brain, heart and lungs and other important organs. You can use a cold compress on the head, or use a medical alcohol bath until the skin is red.

6, emergency rescue after heat stroke employees slowly awakened.

7, operations chief Yan Wei confirmed to the exercise leadership team to report the completion of the heat stroke prevention and cooling emergency plan field exercise.

Emergency plan for heat stroke prevention 4

As the weather gradually turned hot, the sustained high temperature and hot weather on the front line production staff physiological and psychological health have a great impact, especially easy to make people physically and mentally fatigue, thus increasing the probability of accidents. Coupled with the greater labor intensity of the production line, personnel turnover is serious, but also to prevent heat stroke put forward higher requirements. Therefore, we must maximize the relief of the impact of the heat and high temperature on the front-line production staff to reduce the incidence of summer accidents.

Combined with the actual situation of the production line, in order to reduce the incidence of accidents, reduce the rate of staff turnover, specially formulated the following summer cooling program:

A daily diet:

(a) It is recommended that the cafeteria meals to light, nutritious, easy to digest, and more to prepare a number of cool and refreshing food, such as cold noodles, cold vegetables, cold noodles, and so on.

(b) the hot weather will increase the staff's physical energy consumption, therefore, it is recommended that the cafeteria moderate increase in ginger, vinegar, bitter melon, garlic and other products to wake up the spleen and stomach, and reduce the amount of oily and spicy food in the meal to enhance the staff's appetite;

(c) each meal as much as possible to provide a cool and invigorating drinks, such as tomato soup, mung bean soup, etc., and recommended seaweed and pumpkin soup;

(d) the preparation of meals to light, nutritious, easy to digest, more prepared some cool and refreshing foods, such as noodles, cold vegetables, cold noodles, etc.;

( (D) In the preparation of meals, prepare more fresh and juicy food, such as cucumber, tomato, bean curd, bitter gourd and so on.

Second, high-temperature welfare:

(a) Regularly provide watermelon, tomatoes and other cold fruits for front-line production staff to ease the pressure of high temperature.

(ii) purchased Pueraria lobata, honeysuckle, green beans and other items, every day regularly provide chrysanthemum tea, green bean soup, light salt water and other fire drinks, be sure to ensure that the production line drinking water supply.

Three preventive measures:

(a) work can be arranged according to the weather conditions of the front-line production staff to rest moderately;

(b) to strengthen the management of the staff dormitory, do a good job of dormitory ventilation, improve dormitory sanitation, disinfection and anti-mosquito on a regular basis, and to do a good job of comprehensive management of environmental health;

(c) (C) pay close attention to canteen hygiene, strict implementation of the disinfection system, improve canteen food hygiene, to prevent food poisoning;

(D) prepare some commonly used summer cooling medicines, such as: Rendan, Huo Xiang Zhengqi Shui, ten drops of water, anemone, etc., placed in the warehouse by the director of the workshop according to the needs of the pick up.

(e) and the local hospital to establish a medical care agreement, as a medical care guarantee; the company reserved drivers on standby, in order to deal with accidents due to the heat of the weather in a timely manner;

Fourth, do a good job of staff thinking:

(a) production of summer heat posters in the company's various places to post, on the prevention of summer heat work Publicity, plans to produce posters, banners, printing A4 paper posted in the workshop, dormitory and other places in the factory, the estimated cost of 200 yuan;

(b) It is recommended to invite the company's leadership for the evening staff workshop, dormitory visits;

(c) Employees in the work period, the director of the workshop and the head of the team should be a good idea to guide the work of the staff relations commissioner to understand the ideas of employees regularly, grasp the Employee thought dynamics, and do a good job of dormitory visits.

At present, most of the province has entered the summer season, in order to do a good job of preventing heat stroke and production safety accidents, to protect the majority of workers life safety and health, now on the relevant matters are as follows:

First, to strengthen the work of the organization and coordination of the prevention of heatstroke

Trade unions at all levels should be fully aware of the adverse effects that hot weather operations may have on the physical and mental health of workers, attach great importance to summer labor protection work, and take the prevention of heatstroke as a key task at present, and effectively strengthen the organizational leadership, make early arrangements and deployments to promote heatstroke work to the implementation of the enterprise, the implementation of the work team, the implementation of the work of the workers. To the leadership of the party committee at all levels, to strengthen the coordination and linkage with the relevant government departments, in the work of the deployment, information dissemination, special rectification and inspection inspection to form a synergy, and to promote the region, the unit of the work of the prevention of heatstroke.

Second, urge employers to implement measures to prevent heat stroke

Trade unions at all levels should conscientiously fulfill their responsibilities for labor protection supervision and inspection, and urge employers to implement measures to prevent heat stroke in accordance with the relevant provisions of the "Measures for the Administration of Measures for the Prevention of Heat Stroke" (Safety Supervision, General Safety and Health ¨C No. 89, 2012). Trade unions will give full play to the role of their labor protection supervision and inspection organization network, and conduct labor protection supervision and inspection in key places such as high-temperature work, open-air construction, work-at-height, and hazardous materials storage and transportation, so as to discover hidden dangers and supervise rectification in a timely manner. Trade unions at the grass-roots level and in enterprises should combine the characteristics of summer production safety and heat stroke prevention and cooling work, urge employers to reasonably arrange working hours, appropriately reduce the number of operations during high-temperature periods and reduce the intensity of labor; actively improve the working conditions and operating environment, and adopt good . Insulation, ventilation, cooling measures to ensure that the workplace meets the requirements of the national occupational health standards; high-temperature allowances are issued in accordance with the provisions of the regulations to provide the necessary personal protective equipment, summer cooling cool drinks and essential medicines.

Three, in-depth summer service activities

Trade unions at all levels should focus on "send cool" and other service activities. The company's main goal is to provide the best possible service to its customers. The company's main goal is to provide the best possible service to its customers. Relying on trade union employee service centers, sites and social forces, actively promote the construction of outdoor workers service sites, construction, sanitation and other outdoor workers to provide a summer rest place, so that the activities of the service workers close to the actual needs of the workers.

Fourth, widely carry out publicity and popularization activities of knowledge of heat stroke prevention

Trade unions at all levels should make full use of all kinds of traditional and new media to vigorously publicize the laws, regulations and policies on heat stroke prevention, popularize occupational hygiene knowledge of high-temperature protection and first aid for heat stroke, and help the majority of workers to enhance the awareness of self-protection and ability. The publicity activities should adopt a pleasant and easy-to-accept way for the workers to expand their influence and enhance the effectiveness of the activities.

1, purpose:

In order to prevent the company's employees in the high temperature climate environment work in the phenomenon of heat stroke, to ensure that the company's production goes smoothly, to ensure that the staff appear heat stroke and other emergencies, can be quickly and effectively start the emergency rescue work, maximize the protection of the employees' body and life safety specially formulated. The company's main goal is to ensure that the company's production runs smoothly.

2, responsibilities and scope of application:

The company's safety management committee for the implementation of the plan responsible for the department, the plan applies to all departments of the company, the focus of the unit of prevention is: stereotypes of the process, composite process, inspection section, warehouse, boiler room, equipment and power department, cafeteria and so on.

3, the emergency plan to start:

The highest temperature of the day published in the XXXX newspaper as the basis for three consecutive days of high temperature above 37 ℃ or the highest temperature of the day up to 38 ℃ automatically start the emergency plan, all the departments of the company in accordance with the emergency plan to carry out the various work measures.

4, emergency plan implementation

(1) equipment and power department should strengthen the management of summer water and electricity supply, to ensure that the workshop production of electricity and water needs. In the event of special circumstances require power and water outages, the relevant departments should be notified in advance, and according to the specific circumstances of the development of appropriate preventive programs.

(2) widely publicize the prevention and treatment of heatstroke, so that employees master the basic knowledge of heatstroke prevention and cooling; workshop management cadres should strengthen the workshop every day to inspect the production situation, and timely understanding of the workshop's high-temperature environment and the physical condition of the workers, and promptly deal with the problems that arose to nip the seed of the accident in the bud.

(3) equipment and power department is responsible for purchasing a batch of cooling medicines in advance, according to the requirements of the medicine will be distributed to the various processes and positions. The company has set up herbal tea buckets in each drinking water place to ensure the supply of herbal tea every day.

(4) Workshop key processes and key high-temperature positions equipped with cooling fans. Every day at 10:30 am and 2:30 pm to arrange for employees to take a 20-minute break in a cool and ventilated place.

(5) The company canteen should be supplied with ice water twice a day to the production line of the workshop, respectively at 10:30 am and 2:00 pm every day. Every day at noon to supply employees with two buckets of free seaweed egg soup. Specifically by the company office is responsible for the implementation.

(6) The company's fleet should ensure that at any time to set aside a car and equipped with a good driver, in order to cope with the need to deal with emergencies. Specifically by the company office is responsible for.

(7) heatstroke rescue methods:

Mild patients: the company's employees in the normal operation of dizziness, fatigue, dazzle phenomenon, should immediately stop the operation, to prevent secondary accidents, other peripheral employees should be the symptoms of the person arranged to the cool, well-ventilated area to rest, the supply of its cool water, medicines, wet towels, etc.. And notify the workshop or department leadership.

Severe patients: (fainting, shock, severe dehydration of the body, etc.) company employees appear heat stroke, the operation of the surrounding staff should immediately notify the workshop or departmental leadership, and promptly transfer the accident personnel to a cool and ventilated area, observe their symptoms, so as to facilitate the arrival of medical personnel to grasp the first-hand medical information. The company office immediately organize rescue personnel in the first time to transfer the heat stroke patients to the nearest hospital for observation and treatment. And reported to the company.

Emergency plan for prevention of heat stroke 7

To implement the Education Bureau's notification of the work of heat stroke, to ensure that the majority of teachers, students and staff of our school health and the orderly conduct of school teaching, in line with the "prevention is more important than Mount Tai" idea, combined with the actual school, the development of the following contingency plan for the prevention of heat stroke.

First, the organization:

1, the school set up to the principal as the head of the work of the leading group of summer cooling.

2, carefully organized to study the relevant documents on the prevention of heat stroke, timely briefings, so that the idea in place, organization in place, measures in place.

Second, the duties of each department:

(a) Political Education Office, Academic Affairs

(1) do a good job during the high temperature duty arrangements.

(2) If there is a need for temporary suspension of classes in hot weather, the first time to notify the class teacher.

(3) To do a good job in the hot weather due to power outages, the suspension of student activities arrangements.

(4) In the hot period to do a good job in the summer cooling, safety and other knowledge of education.

(2) General Affairs Department

(1) in the high temperature before the advent of the organization of personnel on the school all the cooling facilities for inspection, such as damage to the timely repair, to ensure that the normal use of the high temperature season, and the situation will be informed of the departments in a timely manner.

(2) Do a good job of preventing heat stroke and cooling the meticulous work (buy the necessary items to prevent heat stroke, such as green beans).

(3) to do a good job of school electricity, water (drinking water), ice and other necessary items to protect against heat stroke.

(3) classroom teachers

(1) Each classroom teacher should manage the classroom drinking water to ensure the quality of drinking water for students.

(2) The floor of the class should be sprinkled with water in time, and students should prepare a clean towel, soaked in water and ambushed on the head or neck if necessary.

(3) In the heat of the day, students must be diligently observed to see how their bodies reflect.

Third, other work:

Prevention of heat stroke is a comprehensive work, the whole school departments should cooperate with each other, support each other, on call. Departments should strive to do their jobs, combined with the prevention of heat stroke and the actual situation of the post, the scope of responsibility for the work of a check at any time at the disposal of the school heat stroke leading group, *** with the efforts of the collaboration, to do a good job this year's prevention of heat stroke.

Four, specific measures:

First, do a good job of heat stroke prevention publicity. The use of campus radio, theme class meetings and other forms of publicity to students to publicize the general knowledge of heat stroke prevention, education students to actively deal with the hot weather. Actively guide teachers and students in the hot weather to maintain a calm state of mind, unity and harmony, stable learning and work.

The second is to strengthen dietary safety management. Schools to strengthen the commissary health checks, must be sterilized, must open the doors and windows to ensure ventilation. Guarantee students drinking water hygiene, to prevent infection of gastrointestinal diseases.

Third, reduce the student outdoor exercise. Cancel recess, physical education classes and other strenuous activities, to avoid students long time in the outdoor sun, strenuous exercise.

Fourth, to ensure that students have enough rest. Strengthen the duty, maintain a safe and stable rest environment, to ensure that the students' mental state.

Contingency plan for heat stroke prevention and cooling8

In order to ensure the smooth construction of the project, to ensure that in the event of an emergency during construction, emergency rescue work can be rapid and effective, to maximize the protection of the lives of enterprise workers, property safety, according to the characteristics of the project, the development of this plan.

First, this plan is for the construction of a variety of different emergencies developed to ensure that a variety of emergency resources are in a good state of readiness; and can guide the emergency action in accordance with the plan in an orderly manner, to prevent the delay of the accident due to the action is not effective or on-site rescue work in the confusion of the emergency, so as to reduce casualties and property losses. Emergency in construction refers to the suddenness, causing or likely to cause more casualties, larger economic losses of all types of engineering construction accidents.

Second, the establishment of the construction emergency emergency leading group, responsible for the command and coordination of emergency rescue work. Leading group commander-in-chief by the project manager is responsible for the implementation, if the commander-in-chief is out, by the project executive manager as deputy commander-in-chief to give implementation, when the deputy commander-in-chief is not in the case, by the technical person in charge of the site for implementation. The implementation of rescue work, specific personnel arrangements see emergency plan organization.

Third, when the construction of the project occurred in a variety of high temperature emergency symptoms, after receiving the emergency report, should immediately start this plan. In the first time, respectively, to the project information contact group, "120" ambulance center for help, and to the leadership of the project to inform the situation. After the emergency, should also be uninterrupted to the relevant leaders, departmental feedback follow-up.

Fourth, after the occurrence of emergencies in construction, the Ministry of the project that is, as appropriate, set up a rescue site command, the project manager as the accident scene commander, and set up the following leadership group: emergency rescue leadership group and members of the emergency commander:

Group name: emergency response leadership group

Leader: Li effect military

Members: Liu Zhibo, Zhang Qingji, Xu Dancheng, Wang Shujun, Liu Liming, Zhang Guohua, Zhou Changxin

Heatstroke protection group: Zhang Qingji, Guo Zhenshan, Zhang Guohua, Qu Yuntao, Li Baoqing, Wang Chunjie

Information liaison group: Zhang Guohua, Zheng Jun, Yang Dongxu

Safety and security (vigilance) group: Liu Liming, Zhang Guohua, Dong Bunyun, Zhang Zhibin, Huo Mingliang

On-site medical rescue team: Qu Yuntao, Li Baoqing, Wang Chunjie, Dong Benyun, Zhang Zhibin, Huo Mingliang

Logistics support team: Guo Zhenshan, Zhang Guohua, Wang Yongheng, Yan Xuelin, Wang Mingwu, Wen Ruilin

1, heat stroke protection team

During the construction process in the summer, in the course of the operation, the open-air working environment is more; the personnel work distribution area is complex and variable; Labor intensity and other aspects of the impact of the project in the summer construction has come to a lot of inconvenience. In order to protect the legitimate rights and interests of workers and life, property safety, for the operating personnel to create a guaranteed, comfortable environment, in the operating personnel in the occurrence of high-temperature adverse reactions, by the crew chief immediately organize the members of the group, the accident personnel transfer, and control, to prevent the increase of accident personnel in the surrounding construction work site. Make the emergency action has a stronger target, improve the efficiency of the action. So as not to cause huge accident losses.

2, information liaison group

Responsible for understanding the casualties and economic losses and the scope of the impact of emergencies, the organization to collect the weather temperature conditions, and then take the necessary precautions, and the measures taken and developments in a timely manner to the superiors to report to the report and liaison with the relevant departments.

3, safety and security (alert) team

by the safety officer as a team leader and the organization of the crew is responsible for monitoring the development of dangerous conditions, to prevent the impact of the construction period, and the crew to strengthen the safety education, in order to further improve the safety awareness and the organization of the site management personnel to carry out a safety inspection of the construction site, to eliminate potential safety hazards, in order to prevent accidents and once the accident how to control the impact of the accident. How to minimize the impact of accidents when they occur.

4, on-site medical rescue team

When the accident occurs, the crew leader organizes the staff on-site classification and first aid treatment of heatstroke employees, is responsible for the implementation of the first time on the sick good effective rescue; and timely referral to the hospital. The main responsibilities of the ambulance staff are: to enter the construction site to rescue the injured; to guide the heatstroke staff to carry out self-rescue and mutual rescue activities; to concentrate, count, transport and admit the injured. According to the specific situation, the rapid development of emergency treatment programs and organization and implementation.

5, logistical support group

responsible for organizing the mobilization of rescue personnel, materials and equipment, supervise and check the implementation of rescue and relief measures in place.

5, in the construction of the emergency occurred, the rescue site command according to the specific circumstances, can be mobilized from the nearby site rescue teams, personnel, materials and equipment. At the same time, professional rescue teams, materials and equipment from the emergency reserve rescue team mobilization.

Six, after the occurrence of various types of emergencies, the need to mobilize the main professional rescue teams, emergency rescue materials. The main materials and personnel duties are arranged as follows:

1, personnel, material preparation:

The acquisition of materials for the project department is the responsibility of the materials clerk, the main medicines and medical rescue appliances are as follows:

(1), medicines: cold and flu, diarrhea medicines and other therapeutic medicines, and patchouli water, patchouli soft capsule, anemarrhena, tea, sugar and so on.

(2), ambulance apparatus: single frame, ambulance cars, oxygen bags, towels, medical kits, freezers (ice) and so on.

Seven, rescue methods:

1, mild patients

When the site operator dizziness, fatigue, dazzle phenomenon, the operator should immediately stop the operation, to prevent secondary accidents, other peripheral operators should be symptomatic of the personnel arranged to the cool, well-ventilated area to rest, the supply of cool water, wet towels and so on. And notify the project department medical rescue personnel for observation, diagnosis and treatment.

2, serious patients (fainting, shock, severe body dehydration, etc.)

When the operation site appears heatstroke personnel, the operation of peripheral personnel should immediately notify the project department, and promptly transfer the accident personnel to a cool, ventilated area to observe their symptoms, so as to facilitate the arrival of medical personnel to grasp the first-hand medical information. The project department shall decide whether to start the heatstroke prevention and cooling plan according to the specific situation by the chief emergency commander. And immediately organize ambulance personnel to the scene of the accident personnel for treatment. For those with serious symptoms, if the medical equipment of the project department cannot save them, they should be transferred to the nearest hospital for observation and treatment at the first time. And report to the owner.

Eight, the aftermath of the work:

1, according to the accident "four do not spare" principle, seriously do a good job of investigating and dealing with accidents, to take targeted precautionary measures, to strengthen the publicity of the team, education, so that each person has mastered the precautions of the construction process in the summer, so that each person knows to protect know how to protect themselves; know how to rescue others. Summarize the lessons learned, to prevent the occurrence of similar events, specific precautionary measures are as follows:

(1) by the information team on the daily collection of weather conditions, processing, and then reported to the Ministry of the project to prevent the summer heat protection team, according to the specific circumstances of the corresponding safety precautions taken.

(2) When the outdoor temperature is higher than 39 ℃, the project department should carry out the construction of special safety instructions for each team to cool down, so that each team to stop on-site construction work.

(3) The logistics support team should be able to ensure that the operating personnel at the scene at any time drinking water, emergency drugs.

(4) by the summer heat emergency rescue organization in accordance with the temperature of the year to develop a set of reasonable and effective "personnel schedule" to avoid the highest temperature every day time (11:00 ~ 15:00) section of the construction work.

(5) The Ministry of the project team safety education to enhance the ability of operators to deal with various situations should be tight. Strengthen the summer construction safety publicity work, so that each person understands and masters the summer heat safety knowledge, improve the operating personnel in the practice of resilience and ability to deal with.

(6) the project department set up internal medical personnel, strengthen the project internal medical care publicity, safeguard the life of personnel, create a humanized construction site.

IX, emergency recovery, re-entry

When the emergency recovery, re-entry must be evaluated before the hazardous area, and should be analyzed for accidents, to be sure that the hazardous area has been determined to be safe before entering the scene, continue to operate.

;