Rural integrated wastewater treatment equipment in general within 2 weeks can achieve discharge standards?

Integrated rural sewage treatment equipment if the equipment water intake and design standards, 2-3 weeks can achieve discharge standards.

Professional hosting operation services specific work generally involves water quality testing, water quality debugging, equipment deglazing operation and maintenance, station appearance maintenance, sewage pipeline maintenance and so on.

1, rural integrated wastewater treatment equipment commissioning is divided into four major steps: the basic operating parameters of the equipment, water quality testing, microbial microscope map analysis, commissioning optimization program

2, integrated wastewater treatment equipment standardized water quality commissioning measures can be achieved:

a, accurate testing data: real-time access to the operating parameters of the equipment, pollutant parameters, rapid detection, high-precision ......

b, decision-making system science: distinguish between a variety of equipment failure, parameter deviation correction, water quality anomalies traceability analysis

c, commissioning experienced: each engineer after more than half a year of more than 300 professional and technical training.