Summary of year-end personal work of hospital logistics 20 19

After working for one year, you have accumulated one year's work experience, and the work summary at the end of the year is essential. The following is a summary of personal work in hospital logistics at the end of 20 19, which I compiled for your reference only. Welcome to reading.

Summary of personal work of hospital logistics at the end of 20 19 (1) 20 19 years, under the leadership of hospital departments, we have carefully organized logistics services and carried out logistics work, and successfully completed various tasks this year. Specifically, there are the following aspects:

First, carefully organize logistics construction and create a good hospital image.

1, seize the time to grasp the progress, and complete the transformation and relocation of the newborn bathroom, MRI room and CT room. Despite the tight time and heavy task, our department keeps track of and supervises the decoration construction and equipment installation at any time, handles problems in time when found, ensures the construction safety, completes the scheduled target on time, and ensures the smooth development of CT, nuclear magnetic resonance and other work.

2. In order to solve the parking problem of electric vehicles in the hospital, a new employee carport was built behind the surgical building to ensure the orderly parking of vehicles in the hospital.

3. At the same time, according to the arrangement of the hospital, part of the renovation of the hemodialysis room has been completed, and the rest of the work is being carried out in an orderly and intense manner.

Second, strengthen the management of electricity and water use.

1. Due to the continuous development of hospitals, the demand for electricity and water is increasing. In order to ensure the safety of electricity and water use, we should always observe and maintain it in daily maintenance, so as not to cut off power and water and affect the normal diagnosis and treatment activities of the department.

2. At the same time, according to the arrangement of the hospital, replace the sewage treatment facilities, improve the sewage treatment system, solve the drainage difficulties, and prevent iatrogenic pollution.

Three, efforts to optimize the canteen, ward living facilities, warm winter.

1. In order to keep patients and staff warm in winter, the heating facilities in the whole hospital were inspected and maintained before winter. During the heating process, the problems found were rectified and solved in time, and some faulty heating facilities were repaired and replaced.

2. In order to ensure the appropriate temperature in the ward, cold-resistant door curtains are installed at the entrances and exits of the outpatient building and the ward building.

3. In order to provide a good dining environment for patients and staff, the roof of the restaurant was decorated and a waterproof and thermal insulation layer was laid.

Fourth, strengthen fire safety management.

In order to strengthen the fire safety work, our hospital organizes employees to carry out fire knowledge training and drills on time every quarter, which enhances the fire prevention awareness and fire response ability of all employees.

Five, do a good job in bidding, purchasing and receiving materials.

1, hospital, department material procurement in accordance with the spirit of documents at all levels, the need for tender procurement, in strict accordance with the requirements. Apply for and purchase materials in a planned and timely manner to avoid waste or overstock.

Under special circumstances, after receiving the application from the department, the logistics department will purchase materials in time, complete the procurement of materials needed by hospitals and departments with good quality and quantity, and do a good job in logistics services. Strictly implement the material collection process to ensure the safety of materials and property.

2. Do a good job in warehouse management and organize relevant personnel to complete inventory twice a year. The accounts are consistent with the facts, and the articles are free from mildew and deterioration.

Sixth, do a good job in hygiene and cleanliness.

In order to provide a clean and comfortable medical environment for patients, the logistics department often discusses hygiene and cleanliness with the cleaning company, and participates in hygiene supervision and inspection together with the leaders of the cleaning company. Through strengthening daily supervision, under the supervision of the director and head nurse, the environmental sanitation outside the hospital has made great progress and the patient satisfaction has been obviously improved.

Seven, public facilities management

1, strengthen hospital elevator management, regular maintenance and timely maintenance.

2. The maintenance of other public facilities and office supplies in the hospital, once notified, can complete various tasks in a timely and efficient manner.

3. According to the arrangement of the hospital, complete the floor replacement of the conference room on the fourth floor of the public building and create a good office environment.

Eight, complete the collection of fees.

It is difficult to collect utilities and rental fees for departments, rental houses and employees' families twice a year. In order to collect the rental fee of the rental house, sometimes a family needs to make five trips at most, but after patient communication, the water, electricity and rental fees of the rental house and employees' family homes in 20 19 were all paid off.

Nine, there are shortcomings

1, the technical strength of logistics personnel is relatively weak, and there is a lack of technical professionals, especially special equipment maintenance personnel.

2. There are not enough warehouse managers to accept and put down materials.

3, health cleaning work still needs to be further strengthened.

4. Work planning and initiative are not strong.

Summary of year-end personal work of hospital logistics 20 19 (2) 20 19 spent in a busy and fulfilling way. Generally speaking, I am responsible for co-management for one year, with a wide range of work, heavy tasks and great responsibilities. Because of the correct understanding of the work deployment of hospital leaders, the potential of leadership management and organization and coordination was fully exerted, the work intention of employees was mobilized, and the work throughout the year was successfully completed.

The review is summarized as follows:

First, do a good job in logistics management and vigorously improve the service level.

Logistics management involves a wide range of miscellaneous work. Over the past year, guided by strengthening supervision and management and improving service level, we have made great efforts to do a good job in logistics from various aspects.

I am mainly responsible for office supplies warehouse management and life logistics support, providing good services for all departments and delivering office supplies needed by all departments in time with good quality and quantity. Take inventory every month, and be familiar with and clear about the items in the warehouse.

When there are faults and problems in office equipment and daily life, they can be handled in time. If it cannot be handled, please ask professionals to handle it, so as not to delay the normal operation. In the logistics work, I got the support and cooperation from my colleagues. Through our efforts, we have successfully completed 20xx years of logistics and warehouse management.

Second, vehicle management and maintenance

Strict car use system, unified dispatching management, so that there is an application for leaving the car and a record for returning the car; At the same time, the relevant supervision process has also been formulated for vehicle fuel consumption, which excludes the private use of buses.

Ensure the safety of vehicles in terms of safe operation and abide by traffic rules. Under the condition of ensuring the normal operation of the work, strengthening vehicle management and doing a good job in the normal maintenance and repair of vehicles have brought better services to the work of our hospital.

Third, do a good job in the health of the whole hospital, create a beautiful environment, and do a good job in security.

Formulate the relevant health responsibility system, requiring more turns, frequent sweeps and frequent wipes every day, and handle problems in time when found. Sweep every Monday and check every Monday.

Do a good job in the timely, classified and clean cleaning, drying and distribution of hospital sheets, quilts and other medical supplies and employees' work clothes.

The hospital security personnel were trained in safety defense, electricity prevention, fire prevention, waterproof and other aspects, which strengthened the safety awareness and made constant reminders and frequent inspections.

Fourth, assist in the office and do your duty.

In the office, I mainly cooperate with the office director to complete the daily work in the hospital, do a good job in the statistics of clerks, and well complete the health and reception work of the leading office.

In the new year, I set myself a new goal, that is, to keep learning, better enrich myself, meet the challenges of the new year with a full mental state, and work hard with a sense of responsibility, not just confined to the small circle around me, but focusing on the overall situation and future development. Learn from other colleagues, learn from each other's strengths, exchange good work experience with each other and make progress together.

In the new year, I will focus on the central work of the hospital, clarify my personal responsibilities, do a good job in substance, do a good job in coordination, be a good staff officer, do a good job in service and cooperate closely. I hope I can successfully complete all the tasks this year and do my best for the development of the hospital.

20 19 (III) Summary of Personal Work in Hospital Logistics Year-end 20 19 is a year when new hospitals are opened and antibacterial drugs are in special need, and it is also a year to carry out demonstration work of striving for Excellence, medical quality, three good and one satisfactory and high-quality nursing services. Under the leadership of hospital departments, logistics personnel closely focus on clinical needs and hospitals, and establish the idea that everything is for the clinic and everything is for the hospital. The work is summarized as follows:

First, strengthen theoretical study, improve ideological and political awareness, and establish the concept of serving the people wholeheartedly.

Establish a correct world outlook, outlook on life and values, constantly improve ideological awareness and moral cultivation, advocate dedication, and serve the wounded and sick wholeheartedly and serve the people wholeheartedly.

Second, strengthen the study of laws and regulations and implement the post responsibility system.

Without rules, there would be no Fiona Fang. Laws and regulations and job responsibilities are the basic norms of our behavior and the qualified standards of our work. While strengthening ideological work, we should also strengthen the study of laws and regulations, unit rules and regulations and post responsibilities, constantly improve the consciousness of obeying the law, doing things according to the rules, and earnestly performing post responsibilities, and strive to complete various tasks.

Third, strengthen the study of scientific and cultural knowledge and professional and technical knowledge.

Build a logistics combat team that can recruit, fight and win. Hospital logistics work is complex, different types of work have different professional skills and different job responsibilities. To accomplish different tasks, teams with various professional skills and teamwork are needed to better serve the clinical frontline and make the hospital a big group and better serve the people. While strengthening the institutionalization of ideological and political study, all our logistics personnel strengthen the study of scientific and cultural knowledge, strengthen the professional and technical study of each post, and learn dual-technical knowledge or even multi-technical knowledge for single-post work. Improve the level of logistics service in an all-round way, meet the first-line clinical needs, and do logistics work for the hospital quickly, well and economically.

Fourth, thousands of ditches and valleys meet and go through hardships to the ocean.

After several years of hard work and the efforts of millions of people, a new hospital finally began to stand in XX County in the new year.

The project of the new hospital was started on 20 19, and the supporting projects such as civil engineering, decoration engineering, installation engineering, secondary decoration engineering, weak current system engineering, central oxygen supply engineering, air purification engineering, ventilation engineering, central negative pressure engineering, water supply and drainage engineering, sewage system engineering, auxiliary parking lot and road square construction engineering, and greening engineering were completed on New Year's Day in 2020, and 65438+ in 2020. After that, as always, all the project staff continued to improve the finishing work of the project construction, implement special acceptance, do a good job in project tracking service, collect and sort out the technical documents, manage documents and data documents of the project, and actively cooperate with the inspectors of the districts, cities and counties to do a good job in the inspection, rectification and continuous improvement of the project construction. Constantly improve the first phase of the project, while planning and reporting the second phase of the project. At the same time, the feasibility report and project declaration of XX county 120 emergency center construction project have been completed and approved by the National Development and Reform Commission. A construction fund of 50 100000 yuan has been allocated, 3,500 square meters of staff residences in the East Hospital have been repaired, and KTV, library, reading room and table tennis court have been set up. The rehabilitation center and the rehabilitation center for the disabled cover more than 2,000 square meters, and the recreation department 1000 square meters, which has prepared a place for the new business of the hospital next year.

5. Completed the task of changing hospitals for various departments, all kinds of assembly logistics tasks and daily logistics support supply tasks.

In the relocation task, in order to ensure the supply of bedding and disinfection supplies, more than 2,500 round trips were made and thousands of workers were employed every day. Supply of materials and office supplies 1 10,000 yuan or more; The center provides more than 2000 cubic meters of oxygen. Material supply should be accepted and delivered to ensure the clinical and departmental needs. Strengthen the construction of staff canteens and nutrition canteens, ensure the dietary needs of employees, interns and internal medicine patients, and complete meetings, guest reception and other work. In 20 19, the canteen service income from xx to xx was more than XX million yuan.

Six, strengthen the hospital appearance construction, beautify the green environment.

(a) the implementation of hospital cleaning system and community cleaning responsibility system, keep the hospital clean and environmental sanitation.

(2) Greening and beautifying the hospital, and ensuring the green area of the East Hospital. The green area of the new district hospital is more than10.5 million square meters.

(three) actively participate in urban and rural sanitation and cleaning projects, and complete the tasks of urban and rural sanitation and cleaning projects assigned by the county party committee and the government.

Seven. existing problems

Although the logistics has done a lot of work, the hospital is developing and the requirements are improving. We need to constantly find our own problems, solve them and keep up with the needs of the times.

(A) the logistics personnel's ideological and political, professional and technical quality and management level are low, so they need to strengthen their study and constantly improve their own construction.

(B) Some management projects are not in place and are not perfect, such as fixed assets management.

(3) failed to achieve quantitative management and social management.

Eight. Work plan for 2020

(a) continue to strengthen ideological and political study, laws and regulations, rules and regulations, post responsibility system, professional ethics knowledge and scientific and cultural knowledge, and constantly improve the quality of logistics personnel and improve the level of logistics services.

(two) to further implement the post responsibility system, to ensure that logistics services to keep up with clinical needs, to ensure the normal operation of the hospital.

(3) Further solve the existing problems.

(4) Promote the second phase of the hospital relocation project, and ensure that the 120 emergency center project will be completed and put into operation before the end of xx in 2020. Develop Oriental Hospital and put it into operation, and plan the feasibility report of the elderly medical care hospital project.

(five) do a good job in the housing reform of workers' homes.

(six) gradually push the logistics work to socialization and management.