August 20-22, Jiangmen, a number of bridges to implement closed traffic control

This week, Jiangmen has a number of bridges because of the test so there will be traffic control, everyone in the travel by car also pay attention to avoid these bridges, the good thing is that the traffic control time is not too long, the next week can basically go back to normal, yo.

Traffic control information

Because of the city bridge testing needs, Jiangmen Bridge, Beijie Bridge, Fengxi Bridge, Donghua Road Bridge, Duyen Interchange A ramp bridge, the implementation of closed traffic control.

Due to the need of urban bridge inspection work in Jiangmen City, from August 19 to 22, 2021, the Jiangmen Bridge, Beijie Bridge, Fengxi Bridge, Donghua Road Bridge, Duyuan Interchange A Ramp Bridge, will be closed for traffic control.

I. Jiangmen Bridge

August 19, 2021 from 24:00 to 6:00 the next day to Jiangmen Bridge to implement the full closure of testing. Vehicles are requested to drive around other roads such as Donghua Bridge and Beijie Bridge.

II. Beijie Bridge

August 20, 2021 from 24:00 to 6:00 the next day on the Beijie Bridge to implement full closure testing. Please detour vehicles to other roads such as Donghua Bridge and Jiangmen Bridge.

Three, Fengxi Bridge

August 20, 2021, from 1:00 to 5:00, will be implemented on the North Shengli Road Fengxi Bridge semi-closed construction.

Four, Donghua Road Bridge

August 21, 2021 from 1:00 pm to 5:00 pm, will be fully closed to the Donghua Road Bridge construction.

V. Duyen Interchange A Ramp Bridge

From 01:00 to 05:00 on August 22, 2021, the Duyen Interchange A Ramp Bridge on Duyen South Road (entrance of the special ramp for small cars in the direction of *** and at the Duyen Toll Station of the S26 Deep Cen Highway) will be closed for construction.

During the period of road traffic control, vehicles and pedestrians passing through the construction section are requested to follow the instructions of the traffic signs at the site or detour to other roads. All vehicles are prohibited from parking along the construction section except for construction vehicles.

There are two other sections of the road will be implemented traffic control

According to the Nansha Port Railway across the Guangzhou-China-Jiangsu Expressway (S20) Jiangmen section of the bridge bracket removal construction needs, will be the Guangzhou-China-Jiangsu Expressway (S20) Jiangmen section of the Shafu Interchange E, G ramps for traffic control. The details are as follows:

I. Control time

August 23, 2021 to August 25, *** 3 days.

Two, control section

Guangzhou-Zhongjiang Expressway (S20) Jiangmen section Shafu Interchange E ramp (Guangzhou-Zhongjiang Expressway Zhanjiang direction to Jiangmen Avenue Jiangmen direction Shafu E toll station ramp), and G ramp (Guangzhou-Zhongjiang Expressway Zhanjiang direction to Jiangmen Avenue Heshan direction Shafu D toll station ramp).

Three, control measures

(a) GuangZhongJiang Expressway (S20) JiangMen section of Shafu interchange E ramp closed control, prohibit vehicles from GuangZhongJiang Expressway ZhanJiang direction to JiangMen avenue JiangMen direction Shafu E toll station pass.

(2) GuangZhongJiang Expressway (S20) JiangMen section Shafu interchange G ramp implementation of closed control, prohibit vehicles from GuangZhongJiang Expressway ZhanJiang direction to JiangMen Avenue Heshan direction Shafu D toll station.

During the traffic control period, please pay attention to the passing vehicle drivers to control the speed of the vehicle, along the way to follow the traffic signs and guidelines to drive carefully, obey the scene of the public security police, road officers and staff of the command. In order to avoid traffic congestion, please pay attention to the Jiangmen traffic police Sina microblogging, WeChat public number and navigation software, check the real-time road information, plan a good driving route in advance.

Because of the Jianghai District, Jiangmen City, Jianghai four road pedestrian bridge project needs, it is proposed to implement temporary traffic control on Jianghai four road, as follows:

August 23, 2021 23:00 to August 24, 6:00, the Jianghai four road (outside the sea post to outside the sea East ___ post section) the implementation of the full closure of the construction.

During the construction period, motorcycles and small vehicles traveling in the direction of Jianghai 5 Road on this section must bypass Zhonghua Avenue to turn into Guangbo Road, and then Guangbo Road to enter Jianghai 5 Road, and medium- and large-sized vehicles must follow the guidelines to turn around Nanshan Road to pass through Wuyi Road.

Motorcycles and small vehicles traveling in the direction of Jianghai 3rd Road from Jianghai 5th Road must turn to Zhonghua Avenue from Guangbo Road, and then enter Jianghai 3rd Road from Zhonghua Avenue, and medium and large vehicles must follow the guidelines to pass around Wuyi Road.

During the period of road traffic control, vehicles and pedestrians passing through the construction section are requested to follow the instructions of the traffic signs on the site or detour to other roads. All vehicles are prohibited to park along the construction section except for construction vehicles.