What equipment in shaft construction requires wire rope suspension from the derrick

Bucket, formwork, bracket, etc..

1. Bucket: In shaft construction, the bucket is a loading container used to transport materials and slag. Due to the large weight, wire rope is used for suspension to ensure safety and stability. The wire rope makes the lifting process more convenient and efficient by connecting the bucket to the derrick.

2. Formwork: In shaft construction, formwork is used as a support structure for concrete pouring. Made of wood or metal, it has a certain weight and volume. In order to ensure that the formwork can be firmly fixed in the designated position to withstand the pressure of concrete, in the installation process to use the wire rope will be suspended in the derrick.

3, bracket: shaft construction using a variety of types of brackets to provide stability and support structure. Support structure includes columns, horizontal bars and other components, through the use of wire rope connected to the main building or equipment to achieve vertical or horizontal support. The suspension of the wire rope allows the support to withstand the gravity and loads generated during construction, ensuring safety and stability.