The bidding technical program should be prepared in accordance with the specific requirements of the bidding documents for the preparation of technical standards. Each point of the bidding document requirements should be reflected in the technical program, and in the technical program layout directory, so as to facilitate the evaluation of the bid evaluation committee accurate and fast evaluation.