The year-end summary is a step to guide and promote the work, can better promote the next year's work. The following is my personal year-end summary of equipment maintenance engineers sample four, I hope you like!
Equipment Maintenance Engineer Individual Year-end Summary 1
This year has done the following work:
1, the departments of computer software, hardware, mail printer, network maintenance work level and in place. Let the use of equipment to minimize the failure rate, in the event of failure immediately local solution. There can not be a local solution will also be given in the shortest possible time to solve.
2. Timely updating of system patches prevents viruses and hackers from damaging and attacking through system vulnerabilities. The latest patches are also applied to applications such as ie, outlook, office, etc. In addition, some unneeded services are turned off, and guset accounts are closed.
3, on the center of each computer to install anti-virus software, to avoid the virus in the company's LAN self-replication and mutual dissemination, occupying the LAN network resources, and even make the system crash, loss of hard disk of important information and other hazards, and timely upgrade of the software, regular removal of isolation of the virus folder.
4, the project server room system update, the system from the original 2000 update to Xp, reinstalled all the software, to solve part of the original problem can not be solved, and redeployment of antivirus software solutions.
5, switches, routing and other network hardware equipment maintenance, shielding the center of the port not used, security settings, etc., to ensure the safety of all the company's computers work properly, optimize the speed of the routing operation, save bandwidth, improve the speed of Internet access and stabilization, so that we can access the Internet much faster, to ensure that the network is smooth;
6, for the server, 3 times by the hacker attack. Take corresponding solutions. Redeploy the server.
7, school servers, hardware installation, repair, debugging, projector equipment, regular cleaning, maintenance.
8, the telephone exchange department belongs to set, telephone line adjustment, telephone recording equipment installation and debugging.
9, rtX server, mail server, web server, build, optimize, information collation and testing. User data import and backup.
10, in order to maximize cost savings, and for all school computers set the system automatically hibernate, effectively saving a considerable portion of resources.
11, strengthened the maintenance of network equipment, equipment that often fails to take the appropriate solutions. The company is currently a *** nearly 80 computers, due to more machines, daily failures are more common, the main computer failure: system failure, network failure, software failure, etc., many machines due to long-term use, resulting in a large number of garbage files in the system, the system files are also partially damaged, which led to a system crash, reinstallation of the system, and some of the other is a network failure, line problems.
This is the first time I've ever seen a computer with a PC.
Nearly a year, I always adhere to the strict requirements of their own, hard work, in their ordinary and ordinary jobs, and strive to do their jobs, never bring emotions to work. In the specific work, I try to do a good job of service. Looking back on the work of the past year, I have made new progress in my thinking, learning and work. But I also recognize my own shortcomings:
1, because of the repetition of simple problems repeated solution, may be in place is not timely.
2, their own thinking is still very narrow on the development of modern network technology is not enough to recognize the full range of their own speed to master the new technology is not fast enough.
3, sometimes I do not know the problem and the leadership of the prophet. In fact, from the point of view of our company's structure, these are normal, but I feel ashamed.
Equipment Maintenance Engineer Personal Year-end Summary 2
Time flies, from graduation to work to the present immediately after a year's time. In this nearly a year of work in the process I not only deepen the original learning knowledge understanding, but also on the previous books did not touch or contact not deep knowledge has a further understanding. Since the work, in the unit leadership of the careful cultivation and teaching, through their own continuous efforts, whether in thought, study or work, have made great strides and great gains, now the work is summarized
Ideology, adhere to the important idea of adhering to the pragmatic, and constantly improve their political and ideological awareness and level of continuous exploration and pursuit.
Learning, since joining the work I have been strict with themselves, seriously treat their own work, their own very good for their own position, although came to Xinjiang this piece of work far away from home, the conditions are very difficult, but for our young people, but also not lost as an exercise in self-experimentation, the challenge of self-opportunity. Theory from life above life should be restored back to life, in such a place as Xinjiang, there are many good things worth discovering, it is worthwhile for us to study the place. I always keep in mind that I have to work in the work of continuous learning, the theory and practical work well combined together. In the work of the continuous change of self, timely and different requirements for their own, in the work of the continuous summing up of experience, to enhance their ability to work at the same time, in the work of the continuous learning, but also in the work of the gradual growth.
At work, the first task after arriving in Xinjiang is to be arranged to the site of the aggregate work area, follow the site staff to work together, and then it is arranged to the electrician class to follow the exercise. During this period has been conscientious to cooperate with the site of the master electrician work, listen to the master electrician's arrangements, very good to help the master electrician to complete the work of the task at the same time, I have been formally arranged to the aggregate working area as a technician. In order to enter into the state of technician in the shortest time so that I can do my job better in the future, I collected information from all over the world after work and asked my seniors about the production operation, machinery and equipment in the aggregate area. From the beginning of the official notice to stay in the aggregate area as a technician, I know my own burden is very heavy, I always keep in mind the saying that to give others a bowl of water, you need to have a bucket of water. Because I know to become a qualified technician is not an easy thing, as a technician not only to be able to deal with things in the field office, but also more importantly to be able to solve the problems that arise on the scene, to the scene of the operation and maintenance of machinery and equipment to do a good job. In order to improve production efficiency, we have to come to do a good job in the maintenance of machinery and equipment, and his premise is to deal with the problems of machinery and equipment in advance, to solve the problem in the absence of line. This requires the technician to be able to find the problem, so as to solve the problem in a timely manner, in order to achieve the maintenance of machinery and equipment does not affect the normal production tasks.
At present, my project department should be the owner's request and in my aggregate work area supplemented by a stone powder production section, is currently in the intense construction stage. As a direct participant in the production and operation of stone powder, we are actively preparing for the installation of stone powder equipment. As the technician of the section, I have the responsibility and obligation to make full preparation for the smooth installation of the equipment. In order to complete the installation and debugging of the equipment, I am actively working with the equipment suppliers, in order to complete the task smoothly, quality and quantity. During the installation of the equipment, let me feel y, a set of production equipment can be successfully put into production in the link, it is necessary to do the preliminary work is how complex, I am fortunate to be able to participate in which is really my honor, during this period I paid a lot, but I also harvest a lot of, I enjoy it.
Through nearly a year's work, I have become more and more clear about the operation of the site, more and more familiar with the machinery and equipment, and more and more close to the colleagues in the area, in the first half of the time has been gradually integrated with the aggregates area. In addition to the construction of artificial aggregate production in the construction of an overall understanding of the system at the same time, but also gradually improve their own understanding of the equipment and automatic control, working in Xinjiang during this period of time my personal ability to work has improved to a certain extent, which is inseparable from the leadership's concern and the help of the colleagues around me, I will continue to work hard in the future, make persistent efforts. I will continue to work hard in the future, keep up the good work, strict requirements for themselves, and constantly realistic and innovative, and continue to refine themselves, do my best to do a good job, and strive to achieve greater results.
Equipment Maintenance Engineer Personal Year-end Summary 3
In the blink of an eye, I came to the maintenance center has been two months, in the maintenance center I served as a laptop maintenance engineer position. In the leadership, colleagues care, help, I quickly entered the role of XX repair center is currently the only one XX by the electronic city of their own IT repair service departments, but also XX the only state-owned repair center. The company's spirit of doing China's best technology service providers, to provide customers with first-class after-sales service, "integrity-based, customer as a friend" service purpose, "real, trustworthy", and constantly strive. As a staff of ENTC, I feel very honored and proud. At the same time, I also know that only by constantly improving my business level, maintenance technology and work harder, can I fit and meet the needs of the rapid development of the maintenance center. The following is a summary of my work over the past two months.
First, the main responsible for the work:
1, in the repair center, I am mainly responsible for the reception of customers at the front desk, for customers laptop problems to answer, as well as customer computer repair test.
2, answering the phone visits, the customer's questions to answer.
3, desktop computer repair
Second, the recent plan:
1, efforts to learn professional knowledge, notebook repair, desktop repair, monitor repair, data recovery. Strive to be a multi-faceted maintenance.
2, efforts to learn management knowledge, self-improvement, for the leadership to worry.
Self-evaluation:
Strong communication, adaptation, management, innovation, motivation, teamwork, affinity, like to meet new challenges, the electronics industry in the village of Zhongguancun more understanding.
The leadership gave me a lot of space for development, so that I can better play their own ability, I would like to thank the leadership, I will continue to work hard for the development of the company's ability to play the most. I represent the Sea Dragon Repair Center, always in mind, in words and deeds, and constantly ask for their own, to serve customers with a smile, so that customer satisfaction, satisfaction and return.
Equipment Maintenance Engineer Individual Year-end Summary 4
20xx year in the company's correct leadership, I in accordance with the spirit of the company's work and work requirements, combined with their own duties, hard work, hard work, conscientious effort to complete the work of the task, and achieve good results. Now the 20xx personal work is summarized as follows:
First, equipment maintenance work
20xx received the company's maintenance orders *** count XX units, an average of 17 units per month. After receiving the maintenance orders, I promptly arrange for employees to carry out maintenance, I also often repair with the staff. After everyone's *** with the efforts and hard work, all completed the maintenance work task. 20xx maintenance pass rate of 94.6%, basically meet the target requirements, but there are 5.4% did not meet the target, need to further efforts in the future work, and strive to achieve a pass rate of 100%.
Second, the maintenance work situation analysis
20xx maintenance work compared to last year, there has been greater progress in the number of repairs in the maintenance of a certain growth in the quality of maintenance has improved. The main reason is to continuously improve the maintenance service mode, actively explore new maintenance modes, focus on repairing the equipment that customers need urgently, and at the same time to solve the problems encountered in the maintenance of equipment by combining the theory of maintenance of different instruments with practice, so that their maintenance capabilities and skills have been qualitatively improved. 20xx maintenance work compared to the previous year, the main lack of systematic and systematic system, the magnitude of the maintenance management and strength Weak, poor teamwork, the work is more difficult to carry out.
Third, the maintenance of the work of the Department of deficiencies
First, the maintenance of the work of the Department of passive, which is due to their own subjective initiative is poor, there is a "participate in or not participate in the same" negative thinking, which leads to passive work. Secondly, although I want to do a good job at the beginning of the program goals, but the focus is still concentrated on efforts to improve their own maintenance skills level, ignoring the department's vision of the construction, resulting in the stagnation of the department of many things. Third, although the annual maintenance pass rate of 95%, but 5% of the maintenance did not pass, the reason is that their own communication with the department is not timely, resulting in lagging behind the instrument parts, the phenomenon of maintenance procrastination. Fourth, as the department's director, I lead people with poor skills, teaching level is insufficient, their ideological awareness and business skills need to be further improved.
Fourth, 20xx year work plan target
1, strengthen learning, improve their overall quality. I want to study the spirit of the company's work and business skills, to do in the work of learning, learning in progress, and effectively improve their business skills and management capabilities, to be able to deal with unexpected maintenance events, improve the efficiency and quality of maintenance work, and strive to achieve the maintenance of the pass rate of 100%.
2, strengthen the construction, promote the development of maintenance work. I want to strengthen the department team building and innovation and optimization work, enhance departmental cohesion, set up a good image of the department, to do a real job, promote the development of maintenance work, to ensure that the company and customer satisfaction. At the same time, I want to actively cooperate with other departments **** with good maintenance work, resolutely complete the company's tasks, and strive to achieve good results.
3, improve the plan, improve the quality of maintenance work. I want to seriously develop the maintenance department monthly work plan, clear weekly maintenance tasks, in accordance with the monthly plan to do a good job of maintenance work. To strengthen the summary of the maintenance work, good to adhere to, poor to improve, and promote the quality of maintenance work to improve, establish the department's maintenance quality reputation.
Related articles :
1. maintenance worker year-end work summary 9 minutes
2. 2019 maintenance year-end work summary sample
3. 2019 mechanic maintenance year-end work summary
4. comprehensive maintenance first half of the year summary of the work of the example
5. enterprise maintenance 2019 year-end work Summary