Emergency plan for summer construction to prevent heatstroke and reduce temperature

Summer construction heat stroke emergency plan

In the ordinary daily life, sometimes encounter unforeseen accidents, in order to make a timely emergency response to reduce the consequences of the accident, from time to time need to prepare an emergency plan in advance. So you know how to write an emergency plan is standardized? The following is my summer construction heat stroke emergency plan, just for reference, I hope to be able to help you.

Summer construction heat stroke emergency plan 1

In order to ensure the smooth construction of the project, to ensure that emergencies in construction, emergency rescue work can be rapid and effective, to maximize the protection of enterprises and workers life, property safety, according to the "China *** XX Municipal Party Committee Xiamen Municipal People's Government on the issuance of the" XXX City disposal of economic and social emergencies work plan "notice" [X Commission hair], "XX Municipal Government on the issuance of the" XXX City disposal of economic and social emergencies work plan "notice". Notice" [X Commission issued (20xx) No. 17] spirit, the development of this plan.

First, this plan is for the construction of a variety of different emergencies developed to ensure that a variety of emergency resources are in a good state of readiness; and can guide the emergency action according to the plan in an orderly manner, to prevent the delay of the accident due to the action is not effective or on-site rescue work of the chaos of the emergency, thereby reducing casualties and property damage. Emergency in construction refers to the emergence of a sudden, causing or likely to cause more casualties, larger economic losses of all types of construction accidents.

Second, the establishment of the construction emergency emergency leading group, responsible for the command and coordination of emergency rescue work. Leading group commander-in-chief by the project manager is responsible for the implementation, if the commander-in-chief is out, by the project executive manager as deputy commander-in-chief to give implementation, when the deputy commander-in-chief is not in the case, by the technical person in charge of the site for implementation. The implementation of rescue work, specific personnel arrangements see emergency plan organization.

Third, when the project and building construction in the occurrence of high temperatures in a variety of emergency symptoms, our company received an emergency report, should immediately start this plan. In the first time respectively to the project emergency rescue command center, "120" ambulance center for help, and to the city safety production supervision bureau, trade unions and other relevant departments to inform the situation. After the emergency, should also be uninterrupted to the relevant leaders, departmental feedback follow-up.

Fourth, in the construction of emergencies, the project department that is, as appropriate, set up a rescue site command, by the accident scene as the commander-in-chief, and the establishment of the following leading groups (see Annex 1 for a detailed list of personnel):

1, heat stroke protection group. Summer construction process, due to the construction industry in the operation, more open-air working environment; personnel work distribution area is complex, variable; labor intensity and other aspects of the impact of the construction project in the summer construction has come to a lot of inconvenience. In order to protect the legitimate rights and interests of workers and life, property safety, for the operating personnel to create a guaranteed, comfortable environment, in the operating personnel in the occurrence of high-temperature adverse reactions, by the team leader to immediately organize the members of the group, the transfer of the accident personnel, and the control, to prevent the increase in the number of people around the construction site accidents. Make the emergency action has a stronger target, improve the efficiency of the action. So as not to cause huge accident losses.

2, information contact group. By the head of the group is responsible for understanding the casualties and economic losses and the scope of the impact of emergencies, the daily organization to collect the weather temperature conditions, and then take the necessary precautions, and the measures taken and the development of the situation, and timely reports to the superiors and the liaison of the relevant departments.

3, safety and security (vigilance) team. Evacuation area and resettlement area of the security work, by the security officer as a team leader and organizing team members are responsible for the development of dangerous conditions to monitor the situation, to prevent the impact of the construction period, and to strengthen the safety education of the personnel of the team to further enhance safety awareness and organization of the site management personnel to carry out safety inspections on the construction site to eliminate potential safety hazards, in order to prevent the occurrence of vicious accidents and how to prevent accidents once the accident occurs will be the impact of the accident Control in the minimum range.

4, on-site medical rescue team. When an accident occurs, the team leader organizes the team members to carry out on-site classification and first aid treatment of the injured, responsible for the implementation of effective rescue of the injured in the first time; and timely transfer to the hospital. The main responsibilities of the ambulance personnel are: to enter the accident area to rescue the injured; to guide the people in the hazardous area to carry out self-rescue and mutual rescue activities; and to concentrate, count, convey and admit the injured. According to the specific circumstances, the rapid development of emergency treatment programs and organization and implementation.

5, logistics support team. The head of the group is responsible for organizing the mobilization of rescue personnel, materials and equipment, supervise and check the implementation of rescue and relief measures in place.

5, in the construction of the emergency occurred, the rescue site command according to the specific circumstances, can be mobilized from the nearby construction site rescue teams, personnel, materials and equipment. At the same time, professional rescue teams, materials and equipment from the emergency reserve rescue team mobilization.

Six, after the occurrence of various types of emergencies, the need to mobilize the main professional rescue teams, emergency rescue materials. The main materials and personnel duties are arranged as follows:

1, personnel, material preparation:

The acquisition of materials for the project department is the responsibility of the materials clerk, the main medicines and medical rescue appliances are as follows:

1, medicines: cold medicines, fever medicines, diarrhea medicines, anti-inflammatory medicines such as therapeutic medicines and Rendan, ten drops of water, Zhengqi Shui, Chrysanthemum Tea, fire-reducing herbal teas, green health food and so on.

2, ambulance apparatus: single frame, ambulance cars, small oxygen cylinders, earpiece, hospital beds, towels, medicines, medicine boxes, freezers (ice) and so on.

3, the project set up a medical room, configured by the professional training, assessment and qualified, licensed full-time medical ambulance staff.

VII, rescue methods:

1, mild patients on-site operators dizziness, weakness, dazzling phenomenon, the operator should immediately stop the operation to prevent secondary accidents, other peripheral operators should be arranged to the symptoms of the personnel to the cool, well-ventilated area to rest, the supply of cool water, wet towels and so on. And notify the project department medical rescue personnel for observation, diagnosis and treatment.

2, serious patients (fainting, shock, severe body dehydration, etc.) When the operation site appears heat stroke personnel, the operation of the surrounding personnel should immediately notify the project department, and promptly transfer the accident personnel to a cool and ventilated area to observe their symptoms, so as to facilitate the arrival of medical personnel to grasp the first-hand medical information. The project department should be based on the specific situation, the emergency commander decides whether to start the heat stroke prevention and cooling pre. And immediately organize ambulance personnel in person to the scene of the accident personnel treatment. The serious symptoms, in the case of the project department medical equipment can not save treatment, should be the first time to transfer to the nearest hospital for observation and treatment. And reported to the company.

Summer construction heatstroke emergency plan 2

In order to ensure the smooth construction of the project, to ensure that in the construction of emergencies, emergency rescue work can be rapid and effective, to maximize the protection of corporate and employee life and property safety, specially formulated this plan.

First, this plan is for the construction of a variety of different emergencies developed to ensure that a variety of emergency resources are in a good state of readiness; and can guide the emergency action in accordance with the plan in an orderly manner, to prevent the delay of the accident due to the action is not effective or on-site rescue work of the chaos of the emergency, thereby reducing casualties and property losses. Emergency in construction refers to the emergence of a sudden, causing or likely to cause more casualties, larger economic losses of all types of construction accidents.

Second, the establishment of construction emergency emergency leading group, responsible for emergency rescue work command, coordination work. Leading group commander-in-chief by the project manager Mei Jinglong is responsible for the implementation, if the commander-in-chief is out, by the site technology responsible for the implementation of Su Guanghua. Implementation of the rescue work unfolding, the specific personnel arrangements are detailed in the emergency plan organization.

Third, when the project and building construction in the occurrence of high temperature in a variety of emergency symptomatic situation, our company received an emergency report, should immediately start this plan. In the first time, respectively, to the project emergency rescue command center, "120" ambulance center for help, and to the City Safety Production Supervision Bureau, the Federation of Trade Unions and other relevant departments to inform the situation. After the emergency, should also be uninterrupted to the relevant leaders, departmental feedback follow-up.

Fourth, in the construction of emergencies occur, the project that is, as appropriate, the establishment of rescue site command, by the project manager Mei Jinglong as the accident scene commander, and the establishment of the emergency response leadership team.

1, summer cooling protection group. Summer construction process, due to the construction industry in the operation, more open-air working environment; personnel work distribution area is complex, variable; labor intensity and other aspects of the impact of the construction project in the summer construction has come to a lot of inconvenience. In order to protect the workers'. Legitimate rights and interests and life, property safety, for the operating personnel to create a guaranteed, comfortable environment, in the operating personnel in the occurrence of high-temperature adverse reactions, by the team leader Xie Yunqing immediately organize the members of the group, the transfer of the accident personnel and control, to prevent the increase in the number of accident personnel around the construction work site. Make the emergency action more targeted and improve the efficiency of the action. So as not to cause huge accident losses.

2, information contact group. By the team leader

Su Guanghua is responsible for understanding the casualties and economic losses and the scope of the impact of emergencies, the daily organization to collect the weather temperature conditions, and then take the necessary precautions, and the measures taken and the development of the situation, and timely reports to the superiors and the liaison of the relevant departments.

3, safety and security (vigilance) team. Evacuation area and resettlement area of the security work, by the safety officer Xu Renhua as a team leader and the organization of the team is responsible for the development of dangerous conditions to monitor the situation, to prevent the impact of the construction period, and to strengthen the safety education of the staff of all shifts to further enhance the awareness of safety and the organization of on-site management personnel to carry out safety inspections of the construction site to eliminate potential safety hazards, in order to prevent the occurrence of vicious accidents and how to minimize the impact of the accidents in the event of an accident. The impact of the accident is controlled to the minimum.

4, on-site medical rescue team. When the accident occurred, by the team leader

Li Zhongyuan organization team members of the injured on-site classification and first aid treatment, is responsible for the first time to the injured to implement effective rescue; and timely transfer to the hospital. The main responsibilities of the ambulance staff are: to enter the accident area to rescue the injured; to guide the people in the hazardous area to carry out self-rescue and mutual rescue activities; to concentrate, count, convey and admit the injured. According to the specific circumstances, the rapid development of emergency treatment programs and organization and implementation.

5, logistics support team. Ni Zhengping, the leader of the group is responsible for organizing the mobilization of rescue personnel, materials and equipment, supervise and check the implementation of rescue and relief measures in place.

5, in the construction of the emergency occurred, the rescue site command according to the specific circumstances, can be mobilized from the nearby construction site rescue teams, personnel, materials and equipment. At the same time, professional rescue teams, materials and equipment from the emergency reserve rescue team mobilization.

Six, rescue methods:

1, mild patients

When the site operator dizziness, fatigue, dazzle phenomenon, the operator should immediately stop the operation, to prevent secondary accidents, other peripheral operators should be symptomatic personnel arranged to the cool, well-ventilated area to rest, the supply of cool water, wet towels and so on. And notify the project department medical rescue personnel for observation, diagnosis and treatment.

2, serious patients (fainting, shock, severe body dehydration, etc.)

When the operation site appears heatstroke personnel, the operation of peripheral personnel should immediately notify the project department, and promptly transfer the accident personnel to a cool, ventilated area to observe their symptoms, so as to facilitate the arrival of medical personnel to grasp the first-hand medical information. The project department should be based on the specific circumstances, by the emergency commander Mei Jinglong decided whether to start the heat stroke prevention and cooling pre. And immediately organize ambulance personnel in person to the scene of the accident personnel treatment. Serious symptoms, in the case of the project department medical equipment can not save treatment, should be the first time to transfer to the nearest hospital for observation and treatment. And report to the company.

VII, the aftermath of the work:

1, according to the accident "four do not spare" principle, do a good job of investigating and handling accidents, to take targeted precautions, strengthen the publicity of the team, education, so that each person has mastered the precautions of the summer construction process, so that each person knows to protect know how to protect themselves; know how to rescue others. Summarize the lessons learned to prevent the recurrence of similar events. Specific precautionary measures are as follows:

1, set up by the information team in the construction site thermometer, and the daily weather conditions for the collection, processing, and then reported to the Ministry of the project to prevent heatstroke and reduce the temperature to ensure that the group, according to the specific circumstances of the corresponding safety precautions.

2, when the outdoor temperature is higher than 39 ℃, the Ministry of the project should be the construction of each team to cool down the special safety briefing, so that its teams to stop on-site construction work.

3, logistics support team, should be able to ensure that the operating personnel at the scene at any time drinking water, emergency drugs.

4, by the heat stroke emergency rescue organizations in accordance with the temperature of the year to develop a set of reasonable, effective "staff schedule" to avoid the highest daily temperature (12:00 ~ 14:00) section of the construction work. Discussed by the Ministry of the project, especially the development of the Ministry of the summer construction work and rest schedule, as follows:

Huitong world community project site staff work and rest time:

Morning: 6:00 ~ 10:00 (four hours)

Afternoon: 15:00 ~ 19:00 (four hours)

Note: in case of a rush to meet the deadline or other special circumstances overtime work required When the schedule or other special circumstances require overtime work, then make further notice.

5, the project set up a "summer construction of special institutions to prevent heat stroke"

6, the project team to carry out safety education, enhance the ability of operators to deal with a variety of situations should be tight. Strengthen the summer construction safety publicity work, so that each person understands and masters the safety of heat stroke prevention and cooling common sense, improve the operating personnel in practice, such as resilience and handling capacity.

Eight, emergency recovery, re-entry

When the emergency recovery, re-entry must be evaluated before the hazardous area, and should be analyzed for accidents, to be the hazardous area has been determined to be safe before entering the scene, continue to operate.

IX, emergency drills

Emergency plans and emergency plans established, after effective training, the project or the company before the arrival of the summer each year to carry out large-scale rescue drills. At the end of each exercise, a timely summary, there are certain gaps in the future work to improve.

1, the purpose of the exercise

1), test the effectiveness of the emergency plan and implementation procedures and the degree of adequacy

2), test the emergency equipment

3), to ensure that emergency response organizations are familiar with their tasks and responsibilities

4), test the coordination of emergency response in the ability to

5), to identify and correct deficiencies in the plan. /p>

6), test the adequacy and effectiveness of emergency equipment

2, emergency plan drills

In order to improve the technical level of the rescue personnel and the overall ability of the rescue team, so as to achieve rapid, orderly and effective in the rescue operations of the accident. Project Department in every six months to carry out a rescue drill, emergency rescue training has become an important work of the rescue team, so in the emergency rescue process, the project department also emphasized the following three points:

1, the drill personnel must be on time in place, and equipped with their respective protective equipment.

2, in the rescue process should do "self-protection, rescue others" and active and effective rescue.

3, must strictly abide by the leadership of the command, to do "false to the truth", the effective implementation of rescue measures.

1, emergency training and exercises the basic task is: exercise or improve the team's unexpected accident situation of rapid rescue blocking the source of timely rescue of the injured, correctly guiding and helping the masses to protect or evacuate, effectively eliminate the consequences of hazards, to carry out on-site emergency first aid and casualty evacuation and other emergency rescue skills and emergency response to effectively reduce the accident hazards, reduce the accident losses.

Emergency plan organization

Site commander-in-chief: Mei Jinglong

Heatstroke protection group: Xie Yunqing

Information liaison group: Su Guanghua

Safety and security (vigilance) group: Xu Renhua

On-site medical care group: Li Zhongyuan

Logistical support group: Ni Zhengping

Summer Construction of heat stroke emergency plan3

In order to ensure the smooth construction of the project, to ensure that in the summer construction emergencies, emergency rescue work can be rapid and effective, to maximize the protection of enterprises and workers life and property safety, specially formulated this plan.

First, the summer is approaching, through the preparation of this plan to guide the development of heat stroke prevention and cooling work, to prevent the occurrence of heat stroke accidents, to protect the personal safety of employees, to ensure that the normal production of the project department, to ensure that a variety of emergency response resources are in a good state of readiness; but also to guide the emergency action in accordance with the plan in an orderly manner, to prevent the delay of the accident emergency due to the action is not effective or the chaos of the scene of the rescue work, so as to Reduce casualties and property damage.

Second, the establishment of the construction emergency emergency leading group, responsible for the command and coordination of emergency rescue work. Leading group commander-in-chief by the project manager xx responsible for the implementation, if the commander-in-chief out, by the production manager xx as deputy commander-in-chief to give implementation. Implementation of the rescue work to start, the specific personnel arrangements see the emergency plan organization.

Third, when the project and building construction in the occurrence of high temperature in a variety of emergency symptomatic situation, my project department received an emergency report, should immediately start this plan. In the first time respectively to the company emergency rescue command center, "120" ambulance center for help, and to the Kunshan City Safety Production Supervision Bureau, the Federation of Trade Unions and other relevant departments to inform the situation. After the emergency, should also be uninterrupted to the relevant leaders, departmental feedback follow-up.

Fourth, in the construction of the emergency occurred, the project department that is, as appropriate, set up rescue site command, by xx as the accident scene commander, and set up the following leadership group (personnel list see Annex 1):

1, heat protection and cooling protection group. Summer construction process, due to the construction industry in the operation, more open-air working environment; personnel work distribution area is complex and variable; labor intensity and other aspects of the impact of the construction project in the summer construction has brought a lot of inconvenience. In order to protect the legitimate rights and interests of workers and life, property safety, for the operating personnel to create a guaranteed, comfortable environment, in the operating personnel in the occurrence of high-temperature adverse reactions, by the team leader xx immediately organize the group members of the accident personnel transfer, and control, to prevent the increase of accident personnel in the surrounding construction work site. Make the emergency action has a stronger target, improve the efficiency of the action. So as not to cause huge accident losses.

2, information contact group. By the leader of the group xx is responsible for understanding the casualties and economic losses and the scope of the impact of the emergency, the daily organization to collect the weather temperature conditions, and then take the necessary precautions, and the measures that have been taken and the development of the situation, and timely reports to the superiors and the liaison of the relevant departments.

3, safety and security (vigilance) team. Evacuation area and resettlement area of the security work, by the security officer xx as a team leader and the organization of team members responsible for the development of dangerous conditions to monitor the situation, to prevent the impact of the construction period, and to strengthen the safety education of the personnel of the team to further improve the safety awareness and the organization of on-site management of the construction

Site safety inspection, to eliminate potential safety hazards, in order to prevent the occurrence of vicious accidents and accidents once the occurrence of how to minimize the impact of the accident. How to minimize the impact of accidents.

4, on-site medical rescue team. When the accident occurs, by the team leader xx organization team members of the injured on-site classification and first aid treatment, is responsible for the first time to the injured to implement effective rescue; and timely transfer to the hospital. The main responsibilities of the ambulance staff are: to enter the accident area to rescue the injured; to guide the people in the hazardous area to carry out self-rescue and mutual rescue activities; and to concentrate, count, convey and admit the injured. According to the specific circumstances, the rapid development of emergency treatment programs and organization and implementation.

5, logistics support team. By the head of the group xx is responsible for organizing the mobilization of rescue personnel, materials and equipment, supervise and check the implementation of rescue and relief measures in place.

5, all types of emergencies occur, the main professional rescue team to be mobilized, emergency rescue materials. The main materials and personnel duties are arranged as follows:

The acquisition of materials for the project department is responsible for the material xx, the main medicines and medical rescue appliances are as follows:

1, medicines: cold medicines, fever medicines, diarrhea medicines, anti-inflammatory medicines such as therapeutic medicines and Rendan, anemarrhenic acid, Huo Xiangzhengqi water, chrysanthemum tea, fire herbal tea, green health food, and so on.

2, ambulance apparatus: single frame, small oxygen cylinders, earpiece, towels, medicines, medicine boxes, freezers (ice) and so on.

3, the project department set up a medical room, configured by the professional training, assessment and qualified, licensed full-time medical personnel.

Six, summer cooling measures

1, to strengthen the majority of employees to prevent heat stroke knowledge of publicity, to carry out a variety of forms of safety and health and summer health care publicity and education activities, so that employees understand the summer safety and health care knowledge, improve self-protection ability.

2, improve and implement the production safety responsibility system during the high temperature, set up a leading group to prevent heat stroke, develop emergency plans, try to avoid high-temperature operations,

implementation of preventive measures.

3, before the summer, to do a good job of high-temperature operation of the employee's health checks, suffering from high-temperature contraindications of employees, should be adjusted to work in a timely manner.

4, to actively take measures to improve the working environment and operating conditions of employees, proper arrangements for employees to work time, strict control of overtime, pay attention to the combination of work and rest, the outdoor open-air work of the staff should try to avoid the midday heat time operation. Appropriately reduce the labor intensity of employees to create a good working and rest environment for employees.

5, the implementation of each employee's summer cooling items, as far as possible in kind to supply employees with summer cooling cool drinks and medicines, to put a good quality of goods, and to eliminate counterfeit and shoddy products.

6, to ensure that the construction staff dormitory, canteen, toilets, showers and other temporary facilities to meet the standard requirements and meet the needs of the work of summer cooling, to effectively do a good job in the construction site of the hygiene and epidemic prevention work, to strengthen the drinking water, food hygiene management; strict implementation of the food hygiene system, to avoid the deterioration of food caused by poisoning; strengthen the monitoring of the summer-prone diseases.

7, during the summer, to strengthen the production safety supervision and inspection work, found that the problem should be promptly urged to rectify to ensure safe production.

8, the summer heat leading group of personnel contact information, alarm and first aid telephone tabulation posted on the bulletin board to prevent accidents can not be contacted in a timely manner.

VII, rescue methods:

1, mild patients

site operators appear dizziness, weakness, dazzling phenomenon, the operator should immediately stop the operation, to prevent secondary accidents, other peripheral operators should be symptomatic of the personnel arranged to the cool, well-ventilated area to rest, the supply of cool water, wet towels and so on. And notify the project department medical rescue personnel for observation, diagnosis and treatment.

2, serious patients (fainting, shock, severe body dehydration, etc.)

When the operation site appears heatstroke personnel, the operation of peripheral personnel should immediately notify the project department, and promptly transfer the accident personnel to a cool, ventilated area to observe their symptoms, so as to facilitate the arrival of medical personnel to grasp the first-hand medical information. The project department should be based on the specific situation, the emergency director Chen Aimin decided whether to start the heat stroke prevention and cooling pre. And immediately organize ambulance personnel to visit the scene to treat the accident personnel. Serious symptoms, in the case of the project department medical equipment can not save treatment, should be the first time to transfer to the nearest hospital for observation and treatment. And report to the company.

Eight, the aftermath of the work:

According to the accident "four do not spare" principle, do a good job of investigating and handling accidents, to take targeted precautions, strengthen the publicity of the team, education, so that each person has mastered the precautions in the summer construction process, so that each person knows how to protect themselves; Know how to rescue others. Summarize the lessons learned to eliminate the recurrence of similar events.

Specific precautionary measures are as follows:

1, by the information team set up thermometers at the construction site, and the daily weather conditions are collected, processed, and then reported to the Ministry of the project to prevent heatstroke protection team, according to the specific circumstances of the corresponding safety precautions.

2, when the outdoor temperature is higher than 39 ℃, the Ministry of the project should be the construction of each team to cool down the special safety briefing, so that its teams to stop on-site construction work.

3, logistics support team, should be able to ensure that the operating personnel at the scene at any time drinking water, emergency drugs.

4, by the heat stroke emergency rescue organizations in accordance with the temperature of the year to develop a set of reasonable, effective "staff schedule" to avoid the highest daily temperature (13:00 ~ 14:00) section of the construction work. Discussed by the Ministry of the project, the development of the Ministry of the summer (based on the Ankang City calendar year high temperature months for the July to October) construction work and rest schedule, as follows: x eight xx construction projects on-site personnel work and rest time

morning: 5:30 ~ 10:30 (five hours)

afternoon: 14:00 ~ 19:00 (five hours)

Attachment: in case of a rush or other special circumstances require the construction work. When there is a need to work overtime in order to meet the deadline or other special circumstances, further notice will be given.

5, the project set up a "summer construction of special institutions to prevent heatstroke" specific personnel arrangements see: Annex 1.

6, the project team to carry out safety education, to enhance the ability of the operating staff to deal with a variety of situations should be tight. Strengthen the summer construction safety publicity work, so that each person understands and masters the safety of heat stroke prevention and cooling common sense, improve the operating personnel in practice, such as resilience and handling capacity.

7, the project set up a full-time medical staff, strengthen the project within the medical care publicity, to protect the lives of personnel, to create a humane construction site.

IX, emergency recovery, re-entry

When the emergency recovery, re-entry must be evaluated before the hazardous area, and should analyze the accident, to be sure that the hazardous area has been determined to be safe before entering the scene, continue to operate.

X. Emergency training and drills

1, training

① Before the implementation of the project, the personnel involved in the construction of the project to prevent heat stroke knowledge education, learning about the general knowledge of heat stroke and first aid first aid simple methods, and require proficiency in the use of construction.

② study the plan, so that the majority of employees know how to prevent heat stroke work

2, drill

Emergency response plan and emergency response plan established, after effective training, the Ministry of the project each year before the arrival of the summer to carry out a large-scale rescue drills. At the end of each drill, a timely summary, there are certain gaps in the future work to improve.

1) the purpose of the exercise

① test the effectiveness and adequacy of the emergency plan and implementation procedures

② test the emergency equipment

③ ensure that the emergency response organization is familiar with their tasks and responsibilities

④ test the coordination of emergency response in the people

⑤ identify and correct the defects in the plan

⑥ test the adequacy and effectiveness of the emergency equipment

⑥ test Adequacy and effectiveness of emergency equipment

2) Emergency plan drills

In order to improve the technical level of the rescuers and the overall ability of the rescue team, so as to achieve rapid, orderly and effective results in the rescue action of the accident. The project will be emergency rescue training into a potential rescue team of an important job, so in the emergency rescue process, the project also emphasizes the following three points:

① drill personnel must be on time, and with their respective protective equipment.

② In the rescue process should be "self-protection, rescue others" and active and effective rescue.

③ must strictly abide by the command of the leadership, to do "false to the truth", the effective implementation of rescue measures.

④ must be done once a month to ensure that the coordination of the work of various departments and practicality.

3) The basic task of emergency training and exercises is: to exercise or improve the team's unexpected accident situation of rapid rescue and blocking the source of timely rescue of the injured, correctly guiding and helping the masses to protect or evacuate, effectively eliminating the consequences of the hazards, carry out on-site first aid and casualty transfer and other emergency rescue skills and emergency response comprehensive quality, effectively reduce the hazards of the accident, reduce the loss of the accident.

;