Top pipe through the main safety precautions focus on: the construction process of roadway settlement, collapse accidents, underground pipeline damage, electrocution accidents, falls, lifting injuries, traffic accidents, etc.
Second, the technical measures
(1) to prevent roadway settlement, collapse
①do a good job of construction preparations for the construction of the top pipe before the construction of the construction, to the construction personnel of construction technology, safety and technical briefing from the ideological first to establish the quality and safety awareness;
Selecting quality pipe materials, the arrival of quality pipes, the safety and technical briefing. Construction personnel for construction technology, safety technology briefing, from the ideological first to establish quality and safety awareness;
② selection of high-quality pipe, the arrival of materials to do a good job on-site inspection and acceptance of unqualified products resolutely to be returned;
③ do a good job of supplying materials, the beginning of the top of the material before the start of the plan, and in the field ready to prepare a sufficient amount of surplus, in the top of the pipe before the start of the work, ensure that Before the pipe jacking work starts, make sure all the pipes arrive at the site;
④Prepare well before the pipe jacking work;
⑤In the process of pipe jacking construction, lubrication and wear reduction should be done well, and the pressure and lubrication should be adjusted in time according to the factors such as the ground change and the water table condition, etc., and the amount of the soil output should be recorded every day as the basis for analyzing the loss of the strata, and the record will be responsible by the person in charge of it, and the record will be inspected every day at regular intervals;
⑥ In the process of pipe jacking construction, the operation safety of the highway should be ensured at the same time, and a special person should be responsible for detecting the traveling condition of the road and whether the road surface is settling or not.
7 In the jacking pipe through the road surface set up spacing of 2M observation points, according to the jacking position of hourly measurements, found that the settlement of more than 3CM should immediately stop the operation, to find out the reasons and take corresponding measures before continuing the construction.
8 pipe jacking process, do diligently measured and adjusted, axis and elevation control within 5CM, to ensure the smooth progress of the steel pipe.
(2) prevent the pipeline from breaking underneath
①before the pipe jacking construction, led by our unit, contact with the relevant departments to confirm whether there is a pipeline passing within the scope of pipe jacking construction;
②after confirming, adjust the route and elevation of pipe jacking construction in time in order to avoid intersection of the pipelines;
③if abnormalities are found in the process of pipe jacking, contact with relevant departments in time. Contact.
(3) Prevention of traffic accidents
①In the construction of this pipe jacking, except for the highway, the rest are farmland and factories, so the prevention of traffic accidents is mainly to prevent the occurrence of traffic accidents due to the pipe jacking operation of the road closure and the positive bypass highway traffic accidents;
② before the pipe jacking operation, by the person in charge of the highway road administration to contact, and the implementation of the traffic signage;
③ to avoid the road load, such as the road surface load, if the pipe is found to be abnormal, contact with the relevant departments in a timely manner. Avoid roadway loading, such as in the jacking pipe across the roadway traffic accidents or vehicle breakdowns, timely towing away the accident or breakdown vehicle.
Three, emergency resources analysis
(1) the composition and distribution of emergency forces: the head of the relevant departments of the organization, members of the project department.
(2) emergency equipment and materials preparation: on-site fire extinguishers, medical equipment, ambulance vehicles are sufficient, complete medicines, each construction team with walkie-talkies.
(3) higher rescue organizations: the company's emergency rescue leading group, the main emergency resources available locally are ambulances.
Four, emergency preparedness
1, institutions and responsibilities
Once a construction quality and safety accidents, the company's leadership and the relevant departments responsible for the company must immediately rushed to the scene, organizing and directing the rescue, set up on-site rescue leading group.
Responsibilities: research and approval of rescue programs; organization and coordination of rescue personnel, materials, transport, etc.; maintain communication with higher authorities, timely release of information on the scene.
Project department emergency plan leading group and its personnel composition
Team leader (i.e., project manager) responsibilities
1) Decide whether there exists or may exist a major emergency, request emergency services to provide assistance and implementation of off-site emergency response plan, and carry out direct control in the place unaffected by the accident;
2) Review and assess the accident (incident) possible develop and determine its likely course;
3) direct the partial shutdown of the facility and work with key personnel from the leadership team members to direct the evacuation of the site and to ensure that any injuries are adequately attended to;
4) make contact with off-site emergency response agencies and arrangements for the recording of emergencies;
5) implement on-site (facility) traffic control and assisting off-site emergency agencies in their services;
6) controlling the restoration of the affected site after the end of the emergency and organizing the participation of personnel in the analysis and treatment of the accident.
Duties of the Deputy Team Leader (i.e., Site Manager):
1) Assessing the scale and development of the incident, establishing emergency response steps to ensure the safety of employees and minimize damage to facilities and property;
2) Participating in direct ambulance activities, if necessary, prior to the arrival of rescue services;
3) Arranging for search of the injured and evacuation of non-essential personnel to a concentrated area. (3) Arranging for the search of injured persons and the evacuation of non-essential personnel to centralized areas.
(1) Duties of the communication and liaison team:
1) Ensure smooth communication with the top management and outside, and rapid feedback of internal and external information;
2) Maintain communication facilities and equipment in good condition.
3) Responsible for the records and organization of the emergency response process and external liaison.
(2) technical support group responsibilities
1) put forward rescue and repair and avoid the expansion of the accident temporary emergency programs and measures.
2) Guide the rescue and repair team to implement emergency programs and measures.
3) Fixing the defects of the emergency programs and measures under implementation.
4) Drawing the floor plan of the accident site, marking the key areas, and providing accurate rescue and relief information data to external rescue organizations.
(3) the duties of the defense team
1) set up the accident site cordon, post, to maintain the normal operation of rescue and relief within the site.
2) Keep the emergency rescue channel open, guide the entry of emergency rescue personnel and vehicles.
3) After the end of rescue and relief, close the accident site until receiving a clear lifting instruction.
(4) rescue and repair group responsibilities
1) the implementation of rescue and repair of emergency programs and measures, and constantly improve.
2) Finding victims and transferring them to safe places.
3) Take great care to avoid accidental injuries when carrying out emergency repairs or rescuing when the accident is likely to expand.
4) Report directly to the top manager after the emergency repair or rescue and review and evaluate the results.
(5) Medical treatment team
1) Before the arrival of external rescue agencies, the necessary rescue of the victim (such as artificial respiration, bandaging to stop bleeding, preventing contamination of the injured area, etc.).
2) Prioritize severe victims to external rescue agencies.
3) Assist external rescue agencies in transferring the victim to a medical facility and designate personnel to care for the victim.
(6) Duties of the Logistics Support Group
1) To guarantee the supply of protective and rescue supplies and living materials necessary for the personnel of each group in the system.
2) Provide qualified materials and equipment for emergency repair or rescue.
2, emergency resources
Emergency resources preparation is an important guarantee of emergency rescue work, the project department should be based on the nature of the potential incident and the consequences of the analysis, equipped with emergency rescue in the required means of fire fighting, rescue machinery and equipment, transportation, medical equipment and medicines, and life support materials.
In order to comprehensively improve the emergency response capability, the project department should carry out the necessary rescue knowledge education for the rescue personnel, and formulate the corresponding regulations, including the emergency response content, plan, organization and preparation, and effect evaluation. The company carries out emergency plan guidance twice a year, and if necessary, collaborates with the project department to carry out emergency plan drills.
V. Emergency program
1, pavement settlement
First of all, it should be technically and construction to ensure that the avoidance of pavement settlement and control the amount of settlement, in the event of settlement, take the following measures:
(1) in the jacking pipe through the pavement set up spacing of 2M observation points, according to the jacking position of the hourly measurements, and found that the settlement of more than 3CM should be immediately Stop the operation, must find out the reason, adjust the program in time and take corresponding measures before continuing the construction;
(2) If the settlement occurs to be controlled, then continue the construction according to the adjustment program.
(3) If the settlement occurrence cannot be controlled, the pipe jacking operation should be stopped, grouting work should be carried out immediately to ensure the stability of the pavement, and relevant experts should be invited to adjust the program to ensure the safety of the pavement.
2, pavement collapse
First of all, it should be ensured to avoid pavement collapse technically and in the construction, and take the following contingency measures:
(1) Consult with Zhengrao line highway road administration to determine the route of the temporary emergency road, which is used as an emergency access route in the case of pavement collapse;
(2) Liaise with the traffic police department to organize traffic diversion, and to ensure the safety of the road in the case of road closure of Zhengrao line. Rao line road closure to ensure the smooth flow of emergency access routes;
(3) selection of Anping municipal maintenance team as an emergency repair unit, or with the Rao line road road negotiation, selection of the designated unit as an emergency repair unit, to ensure that in the case of pavement subsidence of the road surface repair at the first time to ensure that in the first time to realize the opening of the Rao line of the highway.
3. Other emergency measures will be implemented in accordance with the approved emergency plan for road construction and the temporary power emergency prean.
If an accident occurs in which earth collapses and buries a person, the emergency rescue measures are as follows:
(1) Firstly, count the number of people working in the section and determine the number of buried and crushed people.
(2) Ask the people who know the approximate location of the people buried by the earth, to reduce the time of excavation and rescue, which is conducive to the survival of the rescued people.
(3) the use of manual movement of shovels edge digging and cleaning up the way of rescue, in favor of the buried people not to be sharp edge of the second injury.
(4) the use of a small number of people with their hands from the collapsed pile of earth above the multi-point digging, but the personnel can not be concentrated to prevent the pressure increase caused by the buried people secondary injury.
(5) in the rescue at the same time, the first to 120 or 119 emergency center report to send a car to send rescue, in order to dig out the people after the rescue.
The above is collected and organized by Zhongda Consulting