Reference price: 11,000
Advantages: unique soft-tissue level model can effectively avoid secondary surgery, more models, higher stability, wide range of adaptation.
Brand history: 61 years of use: lifetime
Sweden Astra/Astra
Reference price: 11,000
Advantages: the use of bone-preserving design, which can make the dental implants can ensure long-term functional and aesthetic stability, and many models and specifications.
Brand history: 34 yearsUseful life: 45 years
.
USA 3i
France Androgyn/Anthogyr
Germany Fjardin/Ankylos
Adin/Adin8
Italy BB
USA Bicon/Bicon
Germany ICX
USA Jamiroquai/Zimmer
.USA HaoSheng/hiossen7
Korea Osstem/Osstem60
Korea Dentium/Dentium50Click to apply for dental implant subsidy
Beijing Zhongnuo Stomatological Hospital Level 3 Stomatological Hospital, which has set up digitalized 10,000-level laminar-flow aseptic operating room, adopts the most advanced international PACS system, and makes the doctors and surgeons to be more professional and more professional by applying advanced information technology to the operating room. technology to the operating room, enabling doctors to obtain a large amount of important information related to the patient in real time, thus facilitating operation and improving efficiency. In accordance with the requirements of the World Health Organization, the environmental design of the operating room, purified air-conditioning system, foot-controlled automatic induction door, manual airtight door, and quality control of cleaning are strictly carried out in accordance with the dual operational specifications of the Chinese National Health Supervisory Agency and the American Dental Association (ADA) to ensure aseptic operation throughout the entire process, and the green disinfection concept of "one person, one sterilizer for one use, and one destroy for one use" has been implemented to ensure that the operating room is sterile. The green disinfection concept of "one person, one use, one sterilization, one use, one destruction" is implemented to ensure the whole aseptic operation. The hospital actively responded to the call of the new policy of collective purchasing, and the subsidy for half-port full-port implantation was raised to 3-10 million yuan.