102 National Highway Bridge across the Yitong River was completed and opened to traffic ceremony officially began at 9:38 pm, after listening to Changchun City Urban and Rural Construction Commission Director Cui Guoguang on 102 National Highway Bridge across the Yitong River?V construction difficulties, the main arch rib, steel box girder segments, assembling new technology, drilled piles with a large hole diameter? The engineering characteristics,? The bridge is not only to gather the hearts of the people of Spring City, but also to accelerate the development of Spring City, power engineering, the bridge is completed, the vehicle from the highway into Changchun city, take this bridge, through the Fourth Ring Road, arrived in northern Changchun, saving nearly half the time? The significance of the completion of the bridge,? Such a large span steel pipe concrete main arch rib, 40-meter wide steel box girder application, the first time in China? Science and technology status and other overall report, Changchun City, vice mayor Wang Xuezhang six companies 102 State Road Bridge across the Yitong River to express warm congratulations on the completion of the bridge to the front line of the construction of China Railway Thirteen Bureau Group builders to express my heartfelt thanks.
The completion and commissioning of the 102 State Bridge across the Yitong River is the crystallization of two years' hard work and sweat of the majority of the builders, and a gift from China Railway Thirteen Bureau Group to the fast and good development of the Spring City.
More about ? Changchun National Highway 102 Bridge across Yitong River? and other national bridge construction scale and bridge building construction enterprise qualification, you can login to the construction network construction pass to check.
More about tender writing production, improve the winning rate, click on the bottom of the customer service free consultation.