Power Supply As of the end of 2011, there are 29 substations of various voltage levels in Funing Power Grid, including 3 220 kV substations (Haixiang, Dongyi and Yinergy respectively) with a main transformer capacity of 780,000 kVA; 11 110 kV substations with a main transformer capacity of 843,500 kVA; and 15 35 kV substations with a main transformer capacity of 2.22 million kVA. There are 13 220kV lines with a total length of 214.27 kilometers and 15 110kV lines with a total length of 221.9 kilometers in Funing.In 2011, the maximum load of Funing grid was 489,000 kVA and the average load was 250,000 kVA.In 2011, the total electricity consumption of the whole society of Funing County was 2,387.98 million kilowatt-hours. In 2011, the total electricity consumption of Funing County was 2,387.98 million kilowatt-hours, which is the second highest among all counties in Yancheng City. Water Supply Funing County is committed to building a "one main and three auxiliary" urban and rural regional water supply network centered on the ground water plant in the county, supplemented by the East City Ground Water Plant, Kefa Ground Water Plant, and Xieli Ground Water Plant. The total design capacity of 300,000 tons of water supply, has a 170,000 tons of water supply capacity, other relevant water plant phase II project is under construction. Three-tier pipeline network construction is accelerating, the end of the year to achieve a comprehensive unified water supply in urban and rural areas. Gas supply Funing County has four gas companies, has been operating three, three total gas supply capacity of 7800 cubic meters per hour, the actual gas, 470,000 cubic meters per year civil, industrial and commercial 3,037,000 cubic meters. Yancheng Tianda Gas located in Yilin Town is under construction. Communication At the end of 2011, the fixed residential telephone subscribers reached 258,000. 590,700 cell phone subscribers at the end of 2011, and 74,400 international Internet users. Port Furning Port is located in Sheyang River, Tongyu River confluence, the estimated total investment of 260 million yuan, the construction of berths 2,000 meters, the construction of bulk berths 6, 2 general cargo berths, heavy berths and container berths each 2, the entire port will form a terminal operations, logistics and warehousing, port supervision, export processing, port industry, leisure services, six functional areas. Three wastes treatment The county sewage treatment plant invested 150 million yuan, 40,000 tons of sewage treatment per day; Langdi Solid Waste Treatment Center invested 180 million yuan, annual incineration of hazardous waste 3,000 tons; Funing Aoyang Science and Technology Co. invested 80 million yuan to purchase the main processing equipment, designed and installed its own CS2 exhaust gas treatment facilities, which can recycle 218 tons of CS per day, valued at 90,000 yuan, effectively reducing the pollution of the air. Fifty-seven key enterprises and other enterprises have invested a total of more than 500 million yuan, 54 sets of new wastewater treatment facilities, processing 630,000 tons of various types of wastewater per day; 56 sets of new waste gas treatment facilities, processing 90, 910,000 standard cubic meters of waste gas per hour. Garbage Disposal There is 500 square meters of office building 1, covers an area of 40 acres of Xu Zhu garbage disposal site 1, 21 garbage transfer station, sanitation operations 23 vehicles, 800 garbage cans, 1,000 fruit crates.