Quality Assurance

In daily life and work, more and more people are exposed to and use the warranty letter, the warranty letter is generally a kind of instrument issued by an individual or a unit to a higher organization or a collective when there is some guarantee. A reference to the guarantee is how to write it, the following is my carefully organized quality assurance letter 4, welcome to share.

quality assurance letter Part 1

Party A (medical institutions): Yalijia Denture Manufacturing Co.

Party B (processor):

In order to ensure the quality of the denture, strengthen the management of the quality of the denture, the strict implementation of the "Denture Management Law" and "Denture Quality Management Code", the two sides in the spirit of equality and mutual benefit, the principle of consensus to sign a quality assurance agreement.

First, Party A should be a legitimate denture business enterprises, for Party B to provide the red seal of the enterprise stamped "Denture Business License", "Business License" copy of the license business scope and validity should be in line with the provisions.

Second, Party B should be a legitimate medical institutions and denture business enterprises, the purchase of loans should be issued to Party A stamped with the red seal of the medical institutions, "Medical Practice Permit" copy or stamped with the red seal of the business enterprise denture "business license" copy of the business license, the scope of business and the validity period of the document should be in line with the provisions.

Third, Party A shall provide Party B with dentures that meet the quality standards, and its packaging in accordance with relevant state regulations.

Fourth, Party B found in the acceptance of quality problems, the right to reject, and promptly notify the Party.

V. Party B should have the conditions to place Party A's denture, due to improper storage and care of denture quality accidents caused by Party B is responsible for.

VI, other outstanding issues in the principle of equality and reciprocity in the negotiated settlement.

VII, this agreement in duplicate, A and B each party to sign a copy.

VIII, this agreement shall enter into force on the date of signature. Valid for two years.

Party A (signature): Party B (signature)

Legal representative: Legal representative:

Year month month

Quality Assurance Part 2

First, the interpretation

1. This "Residential Quality Guarantee" referred to as "user". "

Includes the property owner (buyer) and user of the residential project house.

1.1 Owner: The developer, owner, tenant and other legal users of the residential building.

1.2 Users: natural persons, legal persons and other organizations that actually occupy or rent the premises, including the owners or visitors invited by the natural persons, legal persons and other organizations that actually occupy or rent the premises, as well as other third parties.

2. The "development unit" referred to in this "Residential Quality Guarantee":

refers to Shijiazhuang Jiashih Real Estate Company Limited, i.e., the seller of the "Contract of Sale and Purchase of Commodity Housing".

3. "Property Management Company" in this "Residential Quality Guarantee":

refers to Shijiazhuang Sunshine Waterfront Property Services Co. After the establishment of the Residential District Owners' Committee, the property management company shall be selected and employed by the Owners' Committee.

4. This "Residential Quality Warranty" referred to in the "Residential Construction Quality Warranty": refers to the residential construction works (including renovation works) after the completion of the acceptance of the quality defects in the warranty period, be repaired.

5. "Warranty for equipment and facilities in the household of the renovated residence" referred to in this "Residential Quality Warranty":

It means that all kinds of equipment and facilities provided by the Company to the owner are warranted during the period of warranty, as listed in the "Decoration and Equipment Standards" attached to the "Contract for Sale and Purchase of Commercial Properties" of the renovated residence. However, the "renovation work" included in item 4 above shall be repaired or replaced during the warranty period, except for the "renovation work" included in item 4 above. Except.

Second, the quality assurance based on

This "residential quality assurance" is based on the following provisions:

1. "Urban Real Estate Development and Management Regulations" (People's Republic of China **** and the State Council Decree No. 248).

2. "Construction Engineering Quality Management Regulations" (Decree of the State Council of the People's Republic of China **** and the State Council Decree No. 279).

3. "Measures for Quality Warranty of Building Construction Projects".

4. Ministry of Construction on the issuance of "commercial residential implementation of residential quality assurance and residential instruction manual system of the provisions of the notice" (Jianfang (1998) No. 102).

5. Other relevant laws, rules and regulations.

Third, the warranty period

1. This "Residential Quality Warranty" referred to in the "residential warranty period", are from the date of completion and acceptance of housing and according to the "contract for the sale of commercial real estate" date agreed to be delivered to the buyer of the house (or notification of the delivery period of the second day). The second day of the notification of the delivery period) from the calculation.

3. Construction works in the specified warranty period, the occurrence of engineering quality problems, the responsible party to assume responsibility for the quality of the corresponding responsibility, and is responsible for the warranty costs. The quality problems caused by the development unit shall be the responsibility of the development unit; the quality problems caused by the design shall be the responsibility of the design unit; the quality problems caused by the construction shall be the responsibility of the construction unit. By the Company unified to the relevant units to issue a notice for warranty.

4. Quality defects caused by unqualified products such as building materials, components and equipment, and equipment and facilities within the household of the well-decorated residential units shall be guaranteed by the Company, and the Company shall bear the warranty responsibility and warranty costs, and the Company shall then recover the compensation from the responsible parties in accordance with the law.

5. By the municipal level (including municipal) qualified professional testing unit identification, is to affect the structural safety of the quality problems, or permanent defects in the quality of the project, the warranty responsibility is not subject to the limitations of the warranty period.

6. More than the warranty scope and warranty period, the property management company is responsible for the maintenance, and in accordance with the relevant laws and regulations of the fees and charges of the property management company's service charges.

Fourth, the quality of construction works warranty and warranty period

Under normal use and no man-made damage to the conditions of the quality of construction works warranty and warranty period as follows:

1. Foundation works and the main structure of the project:

Warranty period: the reasonable use of the design documents specified Warranty period: reasonable use as specified in the design documents.

2. Roof waterproofing works, waterproofing requirements of the bathroom, room and leakage prevention of external walls:

Warranty period: 5 years.

3. Heating system pipe leakage, air leakage, etc.:

Warranty period: 2 heating period (heating period from January 15 to March 15 of the following year).

4. Electrical piping, water supply and drainage piping, equipment installation:

Warranty period: 2 years.

Fifth, rough housing interior decoration works and equipment installation project quality warranty parts, content and warranty period

In the normal use of the conditions of no man-made damage to the rough housing interior decoration works and equipment installation works of the parts of the warranty content and warranty period as follows:

1. parts: living room walls, ceiling, bedroom walls and roofs. Roof, bedroom wall roof, kitchen wall roof, bathroom wall roof.

Contents: plaster layer drumming and peeling, mortar alkali peeling.

Warranty period: 2 years.

2. Part: living room floor, bedroom floor, kitchen floor, bathroom floor.

Content: cement floor drum cracking, large sand.

Warranty period: 2 years.

3. Parts: split doors, windows, screens and hardware.

Content: warping and cracking, the switch does not work, the hardware is damaged for non-man-made reasons, and the screens are dislodged for non-man-made reasons.

Warranty period: 1 year.

4. Parts: power sockets, electrical switches.

Content: can not be used normally.

Warranty period: 6 months.

5. Part: visual intercom system.

Content: can not be used normally.

Warranty period: 1 year.

6. Part: door, basement door locks

Content: can not be used normally

Warranty period: 6 months

7. Part: kitchen and bathroom downpipe

Content: clogging

Warranty period: 3 months

8. inside and outside the home meter, water meter, gas meter within one year of normal use of the damage can be Replacement of a

Note: the part of the user's own transformation is not covered by the warranty

Six, the quality of decoration works and equipment installation works in the refined decoration of residential quality warranty parts, content and warranty period

In the normal use of the conditions of unmanipulated damage to the refined decoration of residential interior decoration works and installation of equipment in various parts of the warranty period

In the normal use of unmanipulated damage to the conditions of decoration works and equipment installation of residential parts of the warranty content and warranty period. Warranty content and warranty period as follows:

1. Part: living room wall ceiling, bedroom wall ceiling, kitchen wall ceiling, bathroom wall ceiling.

Content: paint finish peeling, ceiling cracking.

Warranty period: 2 years.

2. Part: living room floor, bedroom floor.

Content: floor cracking.

Warranty period: 2 years.

3. Part: kitchen floor, bathroom floor and so on.

Content: tile drums fall off.

Warranty period: 2 years.

3. Part: sectional doors, interior doors, windows and hardware.

Content: warping and cracking, the switch does not work, and the hardware is damaged for non-man-made reasons.

Warranty period: 1 year.

Quality Assurance 3

Party A:

Party B (supply unit):

In order to strengthen the quality management of the whole process of drug production and operation, to ensure the quality of drugs in circulation, to ensure the safety of human medication, and to safeguard the health of the people, by the negotiation of the A and B parties to the signing of the "Agreement on Quality Assurance of Pharmaceutical Products. ".

First, A and B must conscientiously implement the "Drug Administration Law", "Product Quality Law", "Economic Contract Law", "Consumer Protection Law", "gmp", "gsp" and other relevant laws and regulations.

Second, Party B must provide Party A with the State Food and Drug Administration, the State Administration for Industry and Commerce audit issued by the "drug production (business) license" and "business license" copy, and provide the original letter of authorization of the representative of the enterprise Faber, copies of the ID card of the sales staff, sales invoices and seal samples and other relevant information.

Third, the quality of drugs supplied by Party B must comply with the quality standards of Faber and the relevant quality requirements, the quality of drugs supplied in accordance with the relevant laws and regulations are fully responsible for the quality of drugs, due to the quality of drugs produced by Party B is fully responsible for all the consequences of the problem. Supply of drugs factory generally shall not exceed the production date of six months, or both sides to determine the negotiation, the drugs factory shall not exceed the production date of months.

Fourth, Party B supply of whole packaged drugs must be accompanied by product certification, drug packaging must comply with the "Drug Instructions and Labeling Regulations" and the State Food and Drug Administration promulgated the relevant laws, regulations and requirements for the transportation of goods.

Fifth, Party A should implement the incoming inspection and acceptance into the system, there should be in line with the gsp requirements of the storage and custody of the drug conditions, to ensure that Party B's drugs are stored according to the requirements of the label.

Six, Party A wants to buy the first varieties (including new specifications, new dosage forms, new packaging), Party B should be provided in advance of the production of the drug production approval documents, drug quality standards, drug test reports, drug manuals and other relevant information and samples for Party A audit, Party A audit, only after the purchase of medicines from the Party B, the Party should be accompanied by the same shipment and the batch number of the test report of the drug.

VII, Party B to provide the same variety of drugs at a time, the number of 50 pieces of the following, the product lot number shall not exceed three batches, or both parties to determine the negotiation, the product lot number shall not be more than a batch of the whole package shall not be more than two (including two) of the different product lot number of the drugs mixed.

VIII, Party B for the drug business enterprises, Party A purchased from Party B imported drugs, Party B should provide "imported drugs registration certificate" and the port of the Pharmaceutical Inspection Institute inspection report copy, and stamped with the original seal of the supplier's quality management organization.

This agreement is in duplicate, each party holds a copy.

This agreement is valid from the date to the date

Party A (official seal)

Representative (signature)

Party B (official seal)

Representative (signature)

Year month

Quality Assurance 4

Create safety and quality standardization of construction sites, "Letter of Commitment. " My company in the construction will conscientiously implement the system of responsibility for production safety and production safety rules and regulations, strict implementation of operating procedures, to ensure the effective use of production safety costs, and according to the characteristics of the project to organize the development of safe construction measures to eliminate hidden dangers of safety accidents, timely and truthful reporting of production safety accidents, seriously and actively accept the supervision and inspection of the safety regulatory bodies. Now on the creation of safety and quality standardization site to do the following commitments:

First, set up a full-time project manager, do not change the project team members, such as the need to replace the project team must be agreed to by the construction unit to report to the project location within five days of the construction administrative department for the record.

Second, the construction site full-time production safety management personnel in line with the "building construction enterprise production safety management organization set up and full-time production safety management staffing approach" the number of requirements.

Third, the construction site employees have been through safety education and training, management personnel with valid certificates, special operators must be issued by the Department of Construction of building construction special operators qualification certificate.

Fourth, the construction site in a timely manner for personnel engaged in dangerous operations for accidental injury insurance.

Fifth, the construction site strictly implement the "construction safety and quality standardization implementation standards", to create a standardized site of safety and quality, and to meet the following requirements:

(a) civilized construction and environmental protection

1, the construction site is closed management, surrounded by brick masonry or color steel plate enclosure, the height of not less than one point eight meters, closed continuous, intact, effective; Construction site set up janitorial room and light box type security door, and set up signs.

2, the construction site dormitory meets the requirements: indoor net height of not less than two point five meters, no more than twenty people living in each room, each person's bed area of not less than two square meters, and a single person with a single bed, well ventilated.

3, the construction site canteen meets the requirements: cooking staff with health certificates on duty, and wear overalls, caps; canteen operating room, storage room is divided; operating room walls, floor tiling, equipped with water supply and drainage facilities in line with health standards, equipped with easy to use washing facilities.

4, construction noise, dust, construction waste pollution prevention and control in line with the standards of relevant environmental protection regulations.

(B) "three treasures", "four mouths" and edge protection

1, helmet, safety belt, safety net in line with the standard requirements, employees correctly use safety protection equipment.

2. Hole openings and adjacent edges are protected in accordance with regulations; suspended operations are protected in accordance with regulations; and protective measures meet the requirements of standardization and stereotyping.

(C) vertical protection

1, the main construction of the project using steel scaffolding, dense mesh vertical protection.

2, the frame material without steel and wood mixed, frame and wall tie stable, frame foundation, pole, scissor braces, large and small crossbar, horizontal pocket net nodes in line with the specification requirements, the height of the protection to meet the requirements.

3, steel pipe, fasteners in accordance with the provisions of the qualified testing organization for testing.

(D) shed and safety channel set

High-rise building construction or lifting equipment within the turning radius of the crane arm, set up safety channels and safety guards to meet the requirements of the double anti-smashing shed, and other personnel fixed

operation and centralized operation of the place set up with rain, sun protection function of the protective shed.

(E) construction crane equipment

1, the use of construction crane management is strictly enforced "supervision and management of construction crane safety regulations" (Ministry of Construction Decree No. 166).

2, the construction of lifting machinery has been registered for the record, to obtain the record certificate.

3, the construction of lifting machinery before use by a qualified testing unit passed the test, and through the supervision, installation, use of units **** with the acceptance.

4, the construction of lifting machinery from the date of installation and acceptance within 30 days, to the construction safety regulatory bodies for the use of registration.

(F) temporary electricity

1, the construction site temporary electricity in line with the "construction site temporary electricity safety technical specifications" (JGJ46-20xx) requirements.

2, external power line protection in line with the norms, standards, temporary power using TN-S zero protection system, and in line with the requirements of three-level power distribution, two-level protection, in accordance with the provisions of the leakage protection device;

3, distribution box clean, dimensions in line with the requirements of the provisions of the product quality of electrical products in the box, the disconnecting switch to use the transparent plastic shell circuit breakers.

(VII) other requirements

1, do not use the state expressly eliminated, prohibited the use of processes, equipment, materials that jeopardize construction safety.

2, not in the building has not been completed to set up staff group quarters.

3, the construction site of the temporary building in line with the requirements of safe use.

4, production safety management meets the requirements: the unified use of "construction safety information

management system" software, set up special management, in line with the actual situation of the construction site, the relevant information in accordance with the provisions of the implementation of the signature formalities, the construction site related to the acceptance of the records in a timely and complete.

Violation of the above provisions, acceptance of construction safety regulatory bodies in accordance with the "Work Safety Law", "Construction Safety Management Regulations" and other relevant laws, regulations and rules of punishment.

Bidder: (seal)

Legal representative: (signature or seal)

Date: July 7, 20xx