What are the requirements for electrical engineering in hospital laboratory decoration for laboratory testing?

Hospital laboratory testing Xigue-laboratory renovation of electrical engineering has the following requirements:

Biosafety laboratories should ensure the reliability of electricity, electricity load should not be less than the second level, and should be set up uninterruptible power supply to ensure that the main equipment in the power outage no less than 30 minutes after the reserve power supply. Biosafety laboratories should be set up a sufficient number of fixed power outlets, important equipment should be a separate circuit power distribution, and should be set up leakage protection devices.