Gao Neng Environment*** has five waste-to-energy projects.
The completed waste incineration power plants in China are Wuhu City Chengnan Waste Incineration Power Generation Project , Everbright Environmental Energy (Changzhou) Waste Incineration Power Plant , Hengyang City, Hunan Province, Yongqing Environmental Protection Waste Incineration Power Plant , Sanfeng Environment Guangxi Nanning Waste Power Plant , Jinjiang Environment Kunming Xishan Waste Incineration Power Plant , etc. The above five projects have been put into use.
Mechanical grate incinerator:
Principle of operation: garbage through the feed hopper into the grate tilted downward (the grate is divided into drying area, combustion area, combustion area), due to staggered movement between the grates, the garbage will be pushed downward, so that the garbage in turn through the various areas on the grate (garbage from one area to another when entering the area. It plays the role of a big turn over), until it is burned out and discharged from the furnace.
Combustion air enters from the lower part of the grate and mixes with the garbage; the hot flue gas passes through the heated surface of the boiler to produce hot steam, while the flue gas is also cooled, and finally the flue gas is treated by the flue gas treatment device and discharged.
Features: The grate furnace domestic waste incineration technology is stable in operation, has a strong ability to treat the garbage thoroughly, is suitable for continuous operation, and the emission is up to standard after the optimized flue gas treatment technology.