Engineering Junior Title Review Work Summary Sample
Time is an arrow, go quickly, a period of time has come to an end, this is a period of precious work time, we have gained a lot, to write a work summary for this year's work. Then you have understood the work summary? The following is a sample of the work summary of the junior title review of the engineering class that I have helped you to organize, welcome to share.
First, the project
In this year, I participated in the Guangdong Daya Bay 800,000 tons of polyethylene project, the oil extraction plant to stay eighteen transfer station (Phase II) renovation project, the Li-II station renovation project, the road 70 joint station reconstruction and expansion project, as well as the construction of the North China Oilfield Erlian. The trial mining ground project of Tai 53 well group of Erlian Branch of North China Oilfield is currently under construction. Just arrived at the unit to work in the South China Sea Petrochemical Project Department in Daya Bay, Guangdong Province, the South China Sea Petrochemical Project is a joint venture between Sinopec and a foreign company, in the South China Sea Petrochemical Project, I took part in the finishing of technical data and translation of drawings in Block 1014, and was responsible for the anticorrosion and thermal insulation and elimination of tailings in Block 1012 at a later stage. After returning to Renqiu, I took part in the renovation project of Oil Extraction Plant No. 3 Stay 18 Transfer Station (Phase II) and the renovation project of Li-II Station. The projects of Stay 18 and Li-II Station are the renovation projects of the old station, and there are a lot of dangerous places in the station where the fire is connected with the head, together with the complicated local relations, which caused great inconvenience to the construction. In March this year, I participated in the road 70 joint station reconstruction and expansion project, road 70 joint station is located in the junction of Suning County, Hebei Province, Wanli Township and Xian County, Kongzhuang Township, north of the Guyang River, the contents of this expansion are: the construction of additional external transmission system and dewatering system, the construction of additional water injection and sewage treatment system.
The project I am currently participating in is the Tai 53 well group test mining ground project, in which I am mainly responsible for the construction of the station process, single wells outside the station and the civil construction part. Uriastai oilfield is located 7km north of Dongwuqi, Xilingol League, Inner Mongolia Autonomous Region, about 50km away from Mongolia and about 165km away from Arshan oilfield base, which belongs to the Uriastai depression at the northeast end of Manit depression in Erlian Basin. The ground project of Tai 53 well group test mining consists of four parts: metering and oil pulling station, natural gas compression, off-site system, and Ar-Yilian pressure regulating station. There is one new metering and oil pulling station, located in the north side of Tai 53 wells, with one 9-head metering skid, two separators, two heat exchangers, one natural gas dryer, two oil removers, two hot water pumps, one water injection pump, four 40m3 elevated oil tanks, one 10m3 water return tank, and a separator operation room, a duty room, a hot water pump room, a distribution room, a maintenance room, a water pump room, and a storage room, Laboratory and other plants; the system outside the station has the construction of 9 oil wells and 4 water injection wells; the expansion project of Tai 27 water injection pump house and the test mining ground project of 3 water injection wells; the natural gas compression part is located on the north side of Tai 53 wells of Uriasthai oil field, in the middle of the metering and pulling station. The unit is to receive the trial associated gas from the primary production separator, the associated gas into the unit, through the dew point control skid block separation dehydration, dealkynization. Then part of the natural gas goes to the gas generator for fuel, and part of it goes to the natural gas compressor to be pressurized to 25mpa, and then goes to the molecular sieve dehydration device for dehydration. After pressurization and drying, the natural gas is loaded into a high-pressure cng trailer and transported to AYL, which is used as fuel for the heating furnace after pressure regulation; AYL regulating station accepts cng compressed natural gas from the 53 metering and oil pulling station, and enters into the regulating skid through the unloading port, and then is used as fuel for the heating furnace after two heat exchanges and two levels of throttling.
Second, the improvement of professional knowledge
I am studying material forming and control engineering, which is the former welding equipment and technology. In the school only learned some theoretical knowledge, the opportunity to practice very little, the site is a good place for me to learn and practice. After arriving at the site, I found that the theoretical knowledge I learned in school was too superficial, and it was very difficult to practice, so I asked the master workers to teach me humbly at the site, and I asked if I didn't understand anything, and after one year's work practice, I increased my professional knowledge, improved my practical ability, and combined theory and practice very well. In Nanhai petrochemical project, the official language is English, in order to be able to better complete the work, use the noon time and evening time to learn professional vocabulary and practice speaking, as far as possible and foreigners on the construction site to communicate, through the study and exchange of my English level has improved greatly, especially the level of speaking. I made full use of my spare time to systematically study the theoretical knowledge of oilfield production and management, learn from my masters, go deep into the field construction line, and focus on accumulating experience and absorbing lessons in practice, so that I quickly adapted to the work, and tried to complete my own work.
Third, the experience of participating in the work
Previously I heard that the oil construction work is tired, the workers are very hard to come to the site to feel the hard work of the workers, in the Erlian region, the workers will be described in four special, especially able to suffer, especially able to work, especially able to dedication, especially able to endure. Workers have three seasons a year outside the construction, can not take care of their parents, wives and children, they work hard, never a word of complaint, this kind of selfless dedication is the spirit I must learn. I learned how to face difficulties, how to be a human being, and how to set up a correct outlook on life and values from the exchanges with the workers. Whether in Nanhai Petrochemical or in the oil extraction three plants and Erlian area, the requirements for the quality of the project are getting higher and higher, and the technicians have to be strict, especially in the management of the low old bad problems and mandatory provisions. Through a year of work and study I feel as a technician must be careful, conscientious, do a good job every step of the work, be familiar with the process, be familiar with the drawings, be familiar with the specification, but also continue to learn and engineering-related, and professional-related knowledge, with knowledge to arm themselves.
Fourth, the company's recommendations
With the development of society, people's demand for quality is increasingly high, quality is a solid foundation for the survival and development of an enterprise. The improvement of quality depends on the overall quality of workers and the improvement of technical management level, in order to be able to face more fierce competition, the training of high-quality, high-level professional technicians and managers is the focus of the company.
The past work, in the care of the leadership and comrades support and help, after continuous efforts, I adapted to this kind of work, with a certain degree of technical work ability, but there are still some shortcomings, in the future work, I want to strengthen learning, overcome shortcomings, and strive to improve their professional and technical level can continue to improve. At the same time I clearly recognize that, in order to adapt to the new situation of the development of oilfield construction, the future also need to continue to strengthen theoretical learning, especially new technologies, new theories, hard work, exercise and growth in practical work, and continue to accumulate work experience, improve business capacity and work level, for the development of the company to make their own new and greater contribution.
Engineering junior title review work summary 2
First, to strengthen the standard equipment management, to ensure the accuracy of the transmission of quantity and value.
We often say that the measurement meter is the power enterprise business activities in the "scale", then the standard measurement equipment is calibrated "scale" tool, the power enterprise has extraordinary importance. I **** have standard equipment 19 sets, to ensure the stability and healthy operation of these devices, I presided over the establishment of a standard measurement equipment accounts, clear management, regular inspection, to avoid overdue service.
The performance of the portable single-phase meter calibration station is not very stable, we are maintained by the manufacturer once a year, from time to time with other standards to do comparisons, problems solved in a timely manner, so as not to cause serious consequences. 20xx year we **** sent 12 sets of standard equipment, due to the work in place, the measures are effective, sent to the inspection of the qualification rate of 100%, well received by the leadership of the Institute of Electricity and Research praise.
Second, improve the meter management, maintain the legitimate rights and interests of both sides of the electricity supply and use.
Through the business census, we established a meter account, the measurement of the meter into the standardized management. We have determined the meter calibration workflow, by specialists on the account of the implementation of dynamic management, to ensure that the account and the actual consistent. Meter in the calibration before checking the account, registration work records, calibration by the microcomputer automatically record error information, calibration by the person to change the meter account; if you need to change the meter is issued by the "metering device replacement record", and according to the actual situation issued by the "metering device back to fill the amount of electricity report".
The consequences of doing so, effectively curbing the individual through the meter to do articles, for personal gain of bad behavior. In order to ensure the quality of meter calibration, we implement the meter calibration lifetime responsibility system, meter as long as it is determined to be man-made adjustments unqualified error, regardless of how long, should be held accountable for calibration of the responsibility of the person, will not be tolerated. 20xx, we *** calibrated meter 4741, current transformers 4,814, exceeding the planned task of 56.7% for the Bureau of loss and energy saving to provide technical support.
Third, pay close attention to bus balance management, eliminate the blind spot of line loss management.
Generally speaking, line loss is composed of high-voltage line loss and low-voltage line loss, these two levels of line loss have a strict appraisal system, which has been generally valued; between high-voltage and low-voltage line loss of bus balance is easy to be ignored. In fact, the bus balance is not allowed to be ignored, such as my bureau in 20xx annual power supply 299.7 million kwh, if the bureau bus balance rate from 0.5% to 1%, the whole year to choose to lose more power 1.49 million kwh.
The bus balance of the rate of the high and low, mainly depends on the accuracy of metering devices. In order to ensure the accuracy of the station metering device, in July 20xx, we will station metering meter all replaced by multi-function electronic meter, and in accordance with the provisions of the metering regulations quarterly on-site calibration, to ensure that the meter stable operation. Through this work, the bus balance rate has been greatly reduced, and the balance rate of MiBei and BanDong stations has been reduced from more than 1.5% to less than 0.5%, which is particularly effective. In order to timely and accurately understand the balance of the station, we set up a special person every day to pay attention to the balance of each station and weekly accounting, as long as a station is found for two consecutive days the balance rate of more than 0.5%, then immediately rushed to the scene to find the cause.
On the metering faults reported by the stations, we ensure that personnel are in place within 12 hours to solve the problem at the fastest speed. 20xx, we **** change the meter 46 pieces, on-site calibration of 146 pieces of times, to deal with the station metering faults of 3, to ensure that the whole bureau of the annual bus balance rate of 0.5 percent or less. In order to complete the power supply pointer, to ensure economic benefits, the replacement of electronic meter work we set off in the early hours of the morning, try to work in the low period of electricity consumption, the first to open the Bureau of the "zero point project" precedent.
Four, pay attention to site management, fully cooperate with the work of loss reduction.
Site management includes work on positioning, acceptance and various forms of site investigation. Every positioning or acceptance, I ask team members to be responsible, not limited to making records, but to really involved, the gatekeeper strict gatekeeper. 20xx September, in the Sibao Leather Plastic Co., Ltd. 1,000kva capacity increase project acceptance, we carefully check the wiring, we found the manufacturer's measurement of the wiring error, to prevent a serious measurement of the accident.
For other field work, whether it is electricity census, or focus on the investigation of certain lines, platforms, or the investigation of the load of the public distribution substation, I insist on seeking truth from facts, and strive to investigate the real first-hand information for the leadership of the decision to provide a reliable basis. In addition, I will also be on-site investigation as their own in-depth grassroots, contact with the first line of a rare opportunity, through the site investigation, for the power supply comrades to solve practical problems, but also enrich their experience, supplement the lack of knowledge. 20xx, we *** investigation line 30, 8 Taiwan, correcting the wrong wiring 11.
Fifth, optimize the reactive power configuration, to provide technical support for the work of loss reduction.
Reactive power management is an important part of line loss management, for the management of reactive power, I am not satisfied with the power supply center to report a few tables, fill in a few figures, but devote themselves to this work. On the one hand, I went to Beisha, Dongyang, and Dabu Village to correct the wiring of the reactive power meter, help the power supply office to measure the reactive power status of the users, determine the reactive power compensation program for the users, and check the effect of reactive power compensation.
On the other hand, we consulted the relevant data, understood the latest development of reactive power compensation, and constantly supplemented our own mind to seek practical work methods for our reactive power compensation work. Through unremitting efforts, the comrades of the power supply office and many power users to the work of the understanding of the work is constantly improving.
One, adhere to the ideological and political learning so that my ideological and theoretical qualities continue to improve
Over the years, I consciously practiced the above purpose in action, with enthusiasm, actively, conscientiously, carefully to complete each task, strict compliance with the laws, regulations and the unit's rules and regulations, adhere to the principle of fairness and impartiality, and the work of the company is not only to ensure that the work of the company, but also to improve the quality of the company's products and services, and to improve the quality of the company's products. The company's main goal is to provide the best possible service to its customers, and to provide the best possible service to its customers, and to provide the best possible service to its customers.
Second, the practice of work so that my business skills continue to grow, the ability to work constantly strengthened
In the work, hard work, willingness to work, the project seriously and carefully, and work with the site construction staff. To the experienced construction workers to seek advice, learning and improve their own work on the shortcomings.
Since the work, my work content is mainly: to participate in the Beichuan Earthquake Memorial Museum project of internal management, a clear understanding of the construction process. I to "safety first, quality-oriented" principle of work to carry out the work, through their own efforts and their own experience accumulated in the work, can do to minimize the quality, safety hazards, to ensure that no quality and safety accidents, found that the problem of timely reporting of the situation to the superiors.
November 20xx to the present, transferred to xxx urban and rural construction investment Co. In less than a year's time in the company's work, to participate in 20xx new rural construction roads, rivers and sewage pipe acceptance of the completion of matters, 20xx new rural construction mapping survey and 20xx mud towns and small-scale projects bidding work, each link carefully, to enhance their own technical management capabilities.
Summarizing the recent work, although I have made some achievements, but there are also many shortcomings. In the future 'work, I will, as always, continue to do my best, continuous learning, pioneering, improve their own business quality, enhance their ability to work with tenacious fighting spirit, invigorated and full of spirit into the work. I love this industry, I will be strict with myself and strive for greater progress!
Engineering junior title assessment work summary 4
First, political and ideological aspects:
Ideologically, I insist on seeking truth from facts, and constantly improve my political and ideological awareness and level, and constantly explore and pursue. Politically, I have strict requirements for themselves, actively participate in various political activities, a variety of learning and training, consciously study political theory, close the flesh and blood connection between the party and the people, the service center, building the team throughout, and strive to walk in the front, as an example, regardless of personal gains and losses, the courage to suffer and dedication, and to establish a correct world view, outlook on life, values.
"Honestly as a person, this is the work" is a foothold in society is fundamental, but also I always keep in mind the sentence. Have good professional quality and professional conduct, can be loyal to their own units, the individual career planning and unit development closely integrated. Courageous and innovative, good at pioneering, can withstand high work pressure; hard-working, focusing on cooperation, with young people's fire like work enthusiasm and vigor.
Second, professional learning:
From the work in the past few years, I y appreciate the radio and television transmitting and safety broadcasting technology work trivial and heavy, each link can not slack. In the process of work, I continue to learn and reflect, progress in learning, growth in reflection, so that I can one day in the future can also become an excellent technical backbone. Work with a clear purpose, a positive attitude, study the business, hard work. Love their own career, solidarity with colleagues, open-mindedness to seek advice, and abide by labor discipline. Participate in various activities organized by the unit, strengthen the cultivation and improvement of their own quality, starting from themselves. Engineers, the special nature of the profession determines our "people-oriented, safety first" inevitability.
During the work period, through the leadership, colleagues, talk and exchange, the transmission and launch center has a gradual understanding; secondly, under the leadership of the leadership, continue to study all kinds of rules and regulations, professional readings, but also from the initial inferiority complex, worried about the work, to the work of self-confidence, and continue to cultivate the enthusiasm for self-work and initiative. In the operation period, I followed the engine room colleagues first from how to turn on the machine to start learning, in the process of turning on the machine to pay attention to what matters and how to control the machine, under the leadership of colleagues, I slowly began to learn to reverse the signal and other simple operations, in the process of reversing the signal to focus on the object of monitoring, the normal operating state of the equipment and how to determine the failure of the transmitter and troubleshooting, in each operation of the duty period, my colleagues have to be my first time to learn about the work of the transmitter. During each operation watch, my colleagues have to ask me questions, and strive to learn a simple operation in every eight hours. During the shift, we must do a good job of accident prevention, must grasp the current state of the equipment, the existence of defective equipment to strengthen the monitoring.
Since entering the department unit, the center through various ways to provide us with a good learning environment. From the beginning of the induction training to the weekly shift arrangements for professional knowledge training, monthly departmental examination training, in the manufacturers' representatives to assist in the work, the leaders are also seizing the opportunity to invite the manufacturers' technical staff to give us the knowledge of the various professions, in the process of continuous training, each of us have gained a lot of things. In the science and technology is changing rapidly, the competition is getting more and more intense today, I personally realize that, constantly learning new knowledge, mastering new skills, and constantly improve their own business level and work skills, in order to meet the needs of the work and adapt to the development of society. In the process of work, I will continue to learn from experienced colleagues to learn their own technology or skills have not really mastered, and learn to use, the work process of some of the information is also collected and organized, transformed into information to prepare for the required; spare time to read some professional books, view some professional websites, learning and mastering of some of the advanced knowledge of professional and technical knowledge; but also look at some of the management or other aspects of the books or websites, to learn a variety of knowledge, to improve their comprehensive knowledge, and to improve their own work, and to adapt to the development of society. Learning all kinds of knowledge, improve their comprehensive ability. In the future work, I will continue to learn and practice, improve their own quality, so that their own progress and social development synchronization, in order to meet the needs of the work, and at the same time to treat the work to be able to be proactive, diligent and hard-working, undaunted by difficulties, and dutiful. With the right attitude to all work tasks, love their own work. Have a strong sense of responsibility, seriously comply with the rules and regulations of the center, and strive to improve their efficiency and quality of work as an assistant engineer.
The bits and pieces of the entry into the job for several years, so that I y appreciate the importance of converting the work of thinking and repositioning. Complete the exchange, make up for the shortcomings, improve the ability to improve themselves, and strive to make themselves grow into a qualified, high-quality staff.
;