Three qualification standards:
1, the enterprise in the past five years has undertaken a single capacity of 50,000 kilowatts or more thermal power units coal-fired flue gas desulphurization project, or the following six of the four or more engineering construction, engineering quality is qualified.
(1) Biogas digester project for poultry and animal manure with a single pool volume of more than 100 cubic meters;
(2) Anaerobic biochemical treatment pool project with a single pool volume of more than 200 cubic meters;
(3) Comprehensive treatment project for noise, hazardous gases, dust, sewage, and industrial wastes in general industrial projects;
(4) Flue gas desulphurization project for more than 10 tons of industrial and Centralized heating coal-fired boiler flue gas desulphurization project;
(5) Class I, Grade B or above hospital medical sewage treatment works;
(6) a single contract value of more than 3 million yuan of environmental protection projects.
2, the manager of the enterprise has more than 5 years of experience in engineering management; technical personnel with more than 5 years of experience in construction technology management and has the specialty of intermediate or higher title; financial personnel with more than junior accounting title.
Enterprises have the title of the engineering and technical personnel of not less than 15 people, including not less than 5 people with intermediate title or above, and not less than 3 people of related professional engineers and technicians.
Enterprises have no less than 5 project managers with level 3 qualification or above.
3, the enterprise registered capital of more than 1 million yuan, the enterprise net assets of more than 1.2 million yuan.
4, the enterprise in the past three years the highest annual project settlement income of more than 3 million yuan.
5, the enterprise has with the scope of the contracted works of construction machinery and quality testing equipment.
Third-level enterprises: can undertake a single contract value does not exceed five times the registered capital of the construction of the following projects:
1, a single pool volume of 300 cubic meters and the following poultry, animal manure biogas project; a single pool volume of 400 cubic meters and the following anaerobic biochemical treatment pool project;
2, a single capacity of 200,000 kilowatts and the following coal-fired flue gas desulphurization of coal-fired thermal power generation unit project; 20 tons and the following industrial and central heating coal-fired boiler flue gas desulphurization project;
3, small industrial projects, noise, harmful gases, dust, sewage, industrial waste comprehensive treatment works;
4, the first class and the following grade hospital medical sewage treatment works.