Production safety meeting minutes

On the production safety meeting minutes

In ordinary learning, work, life, more and more places need to use the minutes of the meeting, the minutes of the meeting with the minutes of the meeting is different, the minutes of the meeting is only an objective documentary material. Proposed minutes to be clueless? The following is my collection of production safety meeting minutes, welcome to read and collect.

Minutes of the meeting on production safety 1

Time: xx year x month x day

Location: conference room

Theme: production safety meeting:

Main content:

1, check and analyze the current situation of production safety, for the existence of hidden safety measures to improve, and strictly supervise the rectification and implementation.

2, to determine the establishment of production safety standardization leading group, and the organization of the division of labor, organized by the general manager, the Ministry of Security specific implementation.

3, improve and revise the safety management system, and develop a safety checklist.

4, require all departments, workshops for the spring dry, windy characteristics, strengthen safety education, pay attention to fire prevention, strengthen site monitoring, safety management personnel to strengthen the inspection.

5, the workshop departments in accordance with the hidden danger inspection table seriously do a good job of inspection and management.

Minutes of the meeting on safety production 2

Participants: the company's competent leadership, each section and the project department in charge of the main content of the meeting: the annual safety production work and arrangements for the deployment

First, the purpose of the meeting:

In order to strengthen the company's construction safety management, effective prevention of a variety of safety accidents, to ensure that the company's safety work target for XX years. The company's XX year the successful completion of the target task of the various safety work, specially convened this safety production work conference, the XX year safety production work on the arrangements for the deployment.

Second, the meeting content:

1, the company's safety work goal to achieve the year without safety accidents, zero accident.

2, the full implementation of the production safety responsibility system, signed at all levels of production safety target responsibility, the company should be strictly in accordance with the requirements of the management approach and the opening and re-construction of the project department signed the production safety responsibility, clear responsibilities of both parties and work. Adhere to the principle that "production must be managed to manage safety", hold regular safety meetings and organize safety inspections. Each section, team, important positions and special positions of individuals should also sign the production safety target responsibility.

3, to improve the safety rules and regulations, so that corporate safety work is based on the law, according to the actual situation of the company to adjust the focus of safety management, to meet the various superiors in the safety inspection work, to summarize the shortcomings of the safety work, and actively improve. To firmly implement the leading responsibility system for the rectification of hidden accidents, the implementation of level-by-level management, construction sites in the presence of hidden accidents must be in charge of the company's safety leaders responsible for the implementation of rectification deadlines, so that the responsibility is clear to the person, the assessment of the implementation of the person, the day-to-day management to do "five in place", that is,: the organization in place, in place, in place, in place, in place, in place, assessment, rewards and penalties in place. In place, rewards and punishments in place.

4, in order to make production safety awareness in-depth, everyone set up a "safety first, prevention first" idea, the company regularly held production safety meetings, no less than one a month, regular safety meetings, safety inspections; attention to safety training and education, no less than one quarterly safety education activities, the organization of sections, departments, project departments, construction personnel, full-time staff and other personnel to ensure the safety of the company's work. Project Department, construction personnel, full-time safety personnel to participate in all; to strengthen the training of special types of operators, certification, review of the inspection and management, strictly prohibit undocumented on duty. The construction site of the new personnel for the safety of the "three" education, and do a good job of education records, after the examination before going on duty, the education rate should be 100%, and the establishment of the three education card.

5, the strict implementation of the "safety inspection" system, the company to take regular inspections and random sampling approach, the implementation of dynamic management of production safety. Such as seasonal safety inspections, rainy season construction safety inspections, special sensitive period safety inspections, lightning, fire, heat stroke prevention, etc., to find out the hidden dangers to be rectified, re-inspection of unqualified will be the implementation of the penalties, hold the relevant personnel accountable, and mandatory work stoppage rectification until qualified.

6, the company actively involved in the "creation of safe and civilized site" activities, and combined with the actual situation of the company and the project, the development of plans to meet the standard. The company should be in accordance with the civilized site standards to create a civilized site, and strengthen the civilized site inspection work.

7, strengthen the supervision and management of safety supplies and facilities, safety supplies (safety nets, helmets, safety belts, insulated shoes, etc.) must comply with the relevant national norms and standards of qualified products. Into the construction site machinery to implement the acceptance of entry, prohibit the use of unqualified machinery.

8, combined with the actual situation of the company, the development of production safety emergency plan, the establishment of emergency rescue organizations, the establishment of a leading group for emergency response to major security incidents, the organization of related emergency drills, emergency rescue equipment, equipment is well prepared to minimize the loss of personnel and property.

9, according to the company's production safety meeting system, regular monthly production safety meetings to summarize, solve, and arrange the production safety work.

On the production safety meeting minutes 3

First, the meeting conveyed the first quarter of XX the province's building construction to prevent serious accidents work conference spirit.

X years, the province's construction safety production situation is generally stable, mainly in the "two year-on-year decline": First, the number of accidents and deaths year-on-year basically flat, a slight decline. Secondly, the number of construction accidents and casualties in most areas decreased year-on-year. However, the number of deaths in construction accidents in our province in the country's provinces and cities are still ranked in the top three, the production safety situation is still grim.

Second, the meeting requested that all areas should grasp the following six aspects of work:

1, grasp the development of XX year safety work planning, planning. Each place should take the initiative to find ways to do the work in front of the early planning, early preparation to ensure that the city's construction safety production this year to continue to maintain overall stability.

2, ready to meet the production safety supervision responsibility assessment. This year, the provincial construction department will be at all levels of construction administrative departments and construction safety supervision agencies for the production safety supervision responsibility assessment, around the organization can organize their own pre-test, strengthen the supervision team construction and improve the relevant management system, at the same time, we should take the initiative to communicate with the higher authorities, and strive for the guidance of the higher authorities.

3, continue to grasp the "safe card" system. Implementation. At present, the city's construction workers "peace card" card rate of about 40%, one is to grasp the city's construction workers "peace card" card rate of increase, two is to make the "peace card" Management humanization.

4, to further enhance the "Guangdong Provincial Construction Department construction safety production dynamic management approach" implementation. Each place should effectively strengthen the supervision and inspection, the violation of the enterprise and individual resolutely deduct points.

5, to continue to implement the production safety license system, strengthen the construction units, supervision units and the awareness of the responsibility of the relevant personnel.

6, to strengthen the safety and technical management of construction projects, improve the construction organization design and special program implementation of the inspection efforts.

Third, the meeting emphasized that all localities should effectively do a good job of production safety in construction this winter and next spring, carefully deployed, and pay close attention to implementation.

In particular, the recent impact of low-temperature rain and fog, to attract great attention to ensure that the country's "two sessions" during the security incidents; to maintain a clear mind, to improve the understanding of the concept of "safety hazards", to be by In the past, only focus on the management of "things", transformed into both the management of "things" to focus more on the management of "people", because "people" management on the emergence of a "people", "people", "people", "people", "people", "people", "people", "people".

Participants: Jiangmen City Safety Supervision Bureau Zhang Yongle, Jiangmen City Construction Bureau Song Qiang, Qi Rongzhim, He Ming, Chen Guangyuan, Qiu Bairong, Huang Huixin, Hua Youkun, Lu Wenbin, Liu Guangsheng, Chen Wangdi, Zhao Jianbo, Pengjiang District Construction Bureau, Liang Yu, Liang Liru, Jianghai District Construction Bureau, Xu Yong'an, Yao Juncheng, Xinhui District Construction Bureau, Chen Wenjie, Liu Zhenning, Heshan City Construction Bureau, Li Yongcan, Yang Rihua, Kaiping City, Zhen Chaoyang, Yu Runhua. Construction Bureau Zhen Chaoyang, Yu Runsiang, Wu Mingqin, Taishan City Construction Bureau Liu Wen, Yang Jinhu, Enping City Construction Bureau Wu Lingyan, Zhang Timrong, the city's costing station, the Construction Industry Association Liu Wanbao, Chen Yimin, Chen Laixing.

Minutes of the meeting on production safety 4

Time:xx year x month x day

Location: conference room

Theme of the meeting: production safety meeting:

The main content:

The meeting on the work of production safety in 20xx year for the deployment of the work:

1, analyze the annual operation of the production of safety in 20xx year, the overall run stable.

2, the 20xx annual production safety work plan, safety production cost investment plan for consideration and adoption, and according to the work plan for the annual production safety work layout.

3, asked the Ministry of Finance to do a good job in 20xx annual production safety costs extraction.

4, the annual production safety target decomposition, requiring all departments, workshops, according to the safety target work arrangements, and safety assessment.

5, the strict implementation of the 20xx annual production safety commitment system, signed the 20xx annual production safety commitment.

6, the strict implementation of the hidden danger inspection system, do a good job in the hidden danger of safety inspection, the hidden danger found in a limited time to rectify and timely comeback.

7. Arrange for production safety inspection after the meeting.

Minutes of the meeting on production safety 5

Meeting time:

Meeting place:

Participants: see the sign-in sheet

General contractor:

Sub-contracting unit:

Moderator:

The main content of the meeting:

On the safety and civilization of the construction site of the 2 # building, the site of material planning classification

First, safety and civilization construction

1, the requirements of the construction site materials are classified and stacked neatly, turnover materials, finished materials, raw materials shall not be randomly stacked, steel pipe according to the length of the different layers of stacking on the shelf.

2, rebar site separate isolation, and with scaffolding enclosure only leave a small door for personnel access, steel processing shed safety and civilization signs need to be reset.

3, the south side of the security channel to strengthen the protection, access to the entrance and according to the requirements of the safety and civilization banners.

4, the construction site at the gate of the rebar waste re-organization, masonry waste pool storage of rebar waste.

5, the southwest side of the second building site re-organization, with the frame pipe built multi-storey shelves paved with wooden planks used for stacking steel pipes, fasteners, top wire and other materials. 6, flammable and explosive substances (such as acetylene, oxygen, etc.) need to be stored separately in a cool place, away from open flames. 7, the ground pump above the safety protection shed and add safety and civilization slogans, the north side of the pump truck pit adjacent to the steel pipe enclosure.

8, the labor side of the construction machinery must be in accordance with the specification requirements, "a machine, a box, a gate, a protection", check the construction site temporary electricity, forbidden to private connection, to eliminate potential safety hazards, a box, a secondary box to set up a sign and will be the power system map posted in the distribution box.

9, the construction site road cleaning and maintenance, the project department and labor units take turns cleaning every week.

10, the erector cantilevered scaffolding erection does not meet the specification requirements, scissor braces lap length of at least one meter, lap area rotating fasteners shall not be less than three, scissor braces angle between 45 degrees ~ 60 degrees, safety net broken in time to replace, "four, ten edge" protection must be in place.

11, the unloading platform there are safety hazards, into the building length of not less than 1.5 meters, the length of the wire rope on both sides of the inconsistent (resulting in uneven unloading), the platform tilt angle is not enough, there is no safety measures, there is no weight limit marking and so on.

12, for the "three treasures" of the use of high-altitude work must wear a safety belt (high hanging low with), into the construction site must wear a helmet, violators fined according to the provisions of the Ministry of the project.

13, the elevator shaft protection is not in place, the edge of the hole and the vent should be protected layer by layer.

14, the tower division is required to carry out a weekly inspection of the tower crane and the formation of inspection records, the tower division up and down the operating room must be via the ladder, it is strictly prohibited to use the scaffolding board from the building up and down the tower crane.

15, in the dangerous area of operation (high altitude, edge of the hole, etc.) is strictly prohibited to receive the phone, to prevent the occurrence of safety accidents.

16, the construction site smoking should be careful not to throw cigarettes anywhere, easy to cause fire.

17, the special operators induction certificate (issued by the Ministry of Construction), safety officer induction certificate and safety assessment certificate reported to the project department archives.

The above safety and civilization issues are subject to rectification within three days, otherwise the 16th floor will not settle the project payment.

Second, the quality of the project

1, in order to ensure that the site (the main structure and the secondary structure) water, decided to masonry cisterns in the construction site, the specifics by the project department and the labor company and the secondary structure of the parties to the agreement.

2, the cistern masonry, by the plumber from the pool to the upper floors of each floor connected to a tee, used as a secondary structure of water.

3, due to the cement stirrup practicality is not strong, can not guarantee the spacing between the double layer of steel requirements, so require Dongfu labor company since the sixteenth floor will be cement stirrups replaced by steel stirrups.

4, each layer of reinforcement inspection, rebar team need to self-check, rebar team leader to take the lead in checking, after passing the report of the labor unit to check, and finally reported to the Ministry of the project to notify the supervisory unit after checking, the top plate reinforcement inspection set up a simple horse road, do a good job of protecting the finished product to prevent trampling on the reinforcement, or not checking the reinforcing bars.

5, pouring completed concrete must be maintained, maintenance time shall not be less than 7 days, with the condition of the test block with the layer to stay.

6, since the sixteenth floor after the watering zone at the template alone to set up a support system, otherwise not acceptance.

7, due to the tight schedule, carpentry should be cleaned up in time after demolding construction waste, shall not affect the construction of secondary structure, or be fined.

8, carpentry and reinforcing steel work reasonable lap, cooperate with each other, shall not appear first after the binding of the scene, otherwise ordered to rework and correct; masonry works, tile work and electrician to cooperate with each other, shall not appear later chiseling wall phenomenon, otherwise a fine of five thousand yuan and is responsible for maintenance.

Third, the progress of the project

1, since the beginning of the sixteenth floor, the concrete pouring time must be reasonable, not because of the machinery, artificial pouring time is too long, otherwise economic measures will be taken to sanction.

2, the project department to ensure that the commercial concrete provided by the good compatibility, to meet the construction requirements, labor units in the pouring of concrete quality problems such as timely notification of the project department to solve, not to add water, or found a fine of 50,000 yuan.

3, from the second floor to clean up layer by layer, each clean up layer and the secondary structure of the party to hand over a layer, in order to prepare for the construction of the secondary structure of the smooth progress of the work as soon as possible to arrange for workers to clean up, such as the labor company does not clean up as soon as possible by the secondary structure of the party to send people to clean up the costs incurred will be deducted from the construction of the labor company payment.

3, this week, the progress of the project in accordance with the actual, this Thursday by the Ministry of the project and the labor company in accordance with the actual situation *** with the development of the weekly progress plan, signed by both sides according to the progress of the construction plan, and after a week of comparison, analysis, corrective action, implementation. If the progress lags due to the subjective reasons of the labor party, it will be economically penalized according to the lag time.

The minutes of this meeting have the same legal benefits as the Contract for Works, and can be used as the basis for the settlement of the project payment, which is valid for all types of work.

Minutes of the meeting on production safety6

Meeting time: x, x, 20xx

Meeting place: Student Union Office

Attendance: all members of the Ministry of Red Cross Affairs

Host: Minister x

Recorder: x

The meeting was as follows: (The meeting was mainly presented by Minister Ding Li, with the vice-ministers making up the story.) .

I. Recently found a few problems

1. There are individual students have complaints about the work of the mood, the attitude is not positive, I hope we can understand each other, unity **** into.

2. I hope that we can overcome the difficulties in volunteer activities.

3. Everyone should have a sense of collective as well as departmental honor.

2. The trial period is one month.

II. The nature of the work of the department:

To carry out volunteer activities in the field of medical, first aid, health, etc. and to participate in the volunteer activities carried out by other departments of the University Volunteer Association.

III. Recent Work Arrangement:

1. China-Korea Exchange Meeting (13-15), volunteers are needed to provide volunteer services. Count the students who are willing to do so.

2. Next Thursday (October 20), in cooperation with the Blood Center of X City, we will hold a mitzvah activity of "commemorating the growth in the form of blood donation", and there will be a full-day duty schedule, so we will count the duty time.

3. For students volunteering in the School of Journalism from the 13th to the 15th and from Wednesday to Friday, the first shift will need to come to the office in the morning to pick up their volunteer passes, and the last shift will need to return their passes.

4. Saturday night departmental dinner

5. Next Wednesday, the University Volunteer Association regular meeting, I hope you take the initiative to speak freely.

4. Some details

1. Everyone should pay attention to receive group emails, and reply to receive.

2. Duty leave must have a leave of absence, leave of absence will be sent out later by group mail.

3. In the future, departmental meetings will be held 10 minutes in advance, and the regular meetings of the Association will be held 15 minutes in advance.

4. Future regular department meetings may be scheduled every Friday.

5. Respond to text messages politely and avoid delays.

6. Silence your cell phone during meetings.

7. Pay special attention to the courtesy of other departments.

8. Pay attention to the format and content of official documents.

9. Newcomers can communicate and talk to their brothers and sisters more often, pay attention to the time and avoid classes and breaks.

V. Free speech.

1. The significance of joining the Chi Association

2. How to become a member of the Red Cross.

3. How to deal with the relationship between work and study.

6. Minister X introduced some of the future activities of the arrangement

1. and X City Blood Center blood collection truck into the campus activities, once a month, from this semester will be planned every month to set the theme, I hope that we have more ideas.

2. Red Cross Society member training in cooperation with the university hospital.

3. December 1, World AIDS Day publicity.

4. First Aid Competition in December

5. Garden Party in December.

6. March 24th anti-tuberculosis campaign.

7. Red Ten member recruitment in early May.

8. May Red Cross member training

7. The minister concluded by emphasizing "responsibility" and closing the meeting.

Minutes of the meeting on production safety 7

~ April 15, the morning of the township government mayor xxx in the township government conference room on the third floor presided over the first quarter of the production safety meeting, the township safety committee members participated in the meeting, the meeting conveyed the spirit of the county recently held a conference on production safety, respectively, listened to the public security police station, power supply, and the prevention of geologic hazards, flood control, such as the work of the person responsible for the safety production The production safety work report, the meeting informed the ~ year town production safety work, and ~ year production safety work was studied and deployed. The minutes of the meeting are as follows:

First, the meeting pointed out:

~ years, in the town safety committee members *** with the efforts of the town's safety production in general to maintain a stable situation. ~ January to March, the town's production safety situation is generally stable. However, the production safety foundation is still relatively weak, especially the relevant owners of the main responsibility for production safety awareness of weak hail individual owners of production safety awareness is not strong, road traffic safety hazards are more serious, etc., the meeting informed the night of April 10, Baofa integrated processing plant occurred in the death of a person's production safety accidents, requiring the relevant responsible units, the responsible person must pay attention to, and strengthen supervision, pay close attention to the implementation of the corrective measures in place, effective The company's main goal is to prevent serious accidents.

Second, the meeting emphasized :

The responsible units, responsible persons must raise awareness, enhance responsibility; to often comprehensive inspection, timely detection of problems; to pay close attention to supervise the rectification and elimination of hidden dangers; to strengthen the collaboration, the **** tube, really solid grasp of the current work of production safety, to create a safe, stable and harmonious DALO.

Third, the meeting requirements:

The relevant responsible units, the responsible person should be strictly in accordance with the deployment of the higher level on the work of production safety and requirements, combined with the actual work and the actual situation of the scope of responsibility, serious, solid grasp of the current work of production safety.

1, strengthen the publicity and training.

To combine the safety month activities, the organization of the production enterprises to carry out a special staff must be licensed to work, the production process must be strictly implemented and comply with the safety of production laws and regulations and policies of publicity, education and skills training, to establish a "production must be safe, safety can be production", "Safety is the greatest benefit" consciousness; the village should cooperate with the public security police station to carry out a comprehensive road traffic safety education, rectification activities.

2, strengthen the responsibility, clear work objectives, pay close attention to the implementation of the production safety responsibility system.

Firmly establish the development is the first priority safety is the first responsibility of the concept of ideological

Emphasis on production safety, in action consciously grasp the production safety. With reference to the control targets issued by the county government, at the beginning of the year the town developed a practical production safety responsibility targets, and the village committees, relevant departments, enterprises signed a production safety target responsibility book, the implementation of the production safety responsibility system at all levels, and really do a clear responsibility, responsibility to the person, strict management, and really make the responsibility fall into place.

3, to continue in-depth investigation and management of hidden dangers, to grasp the key industry areas of production safety supervision.

(1) to establish from the government, enterprise level of the two hidden trouble hierarchical management and major sources of danger hierarchical monitoring system, to do hidden trouble investigation and management system, regular, resolutely eliminate new hidden trouble, the enterprise should be a comprehensive investigation of hidden trouble, the possibility of accidents of all kinds of hidden trouble, to implement the responsibility for the rectification of the funds and monitoring measures, rectification and put in place within the time limit to ensure production safety! The government has strengthened the guidance and supervision of the hidden danger inspection work, urged the establishment of hidden danger inspection and management database, and regularly supervised the hidden danger inspection and management. Improve and perfect the quarterly meeting system, safety production performance reporting system, safety education and training system, improve the relevant departments and enterprises accident emergency rescue plan system. The implementation of three requirements: First, the hidden danger investigation seriously and carefully, leaving no blind spots and dead ends; second, the hidden danger rectification work responsibility, measures, funds, time limits and plans for the five implementation; third, the establishment of a sound mechanism for the grading and management of the major hidden dangers, and consolidate the results of the management of hidden dangers.

(2) to increase the investigation and handling of safety accidents, serious accident investigation and handling, strict accountability, and effectively implement the safety accountability system. In accordance with the occurrence of accidents "four do not let go" (the cause of the investigation is not let go, the responsible person can not be dealt with is not let go, the masses of workers can not be educated is not let go, there is no precautionary measures is not let go of the principle).

(3) highlight the focus, deepen the work of special rectification of production safety, the town safety committee members should be based on the functions of the department to regularly carry out special rectification of production safety, to carry out a good road safety, hazardous chemical safety, non-coal mine safety, civil explosives and fireworks safety, boiler and pressure vessel and other equipment safety, building safety, fire safety, school safety and other special rectification activities. The second quarter of the year, the first quarter of the year, the second quarter of the year.

The second quarter production safety work focuses on two characteristics: one is "May Day" is coming, and the second is the spring and summer rain into the flood season is prone to landslides and other geological disasters. These are the key points and difficulties of work safety, the next stage of work safety should be put into practice. ① Hazardous chemical safety rectification, elimination of safety rectification resolutely closed and banned the "three-in-one", "multi-in-one" places, resolutely closed the existence of major safety hazards in the public **** gathering places. ② building construction safety rectification, special equipment safety rectification, geological hazards hidden danger investigation. ③ Strengthen publicity and education, improve safety quality, strengthen the main person in charge of enterprises, safety production management personnel and special operators safety training, improve safety awareness and safety skills. ④ Strengthen emergency management, improve the monitoring system, each department, each unit, each enterprise should pay attention to the preparation and revision of the plan, to ensure the practicality and operability of the plan, to strengthen the construction of the emergency team.

4. Strengthen the responsibility to implement the reporting system.

From this quarter onwards, the village, the relevant regulatory responsibility unit should be in the last month of the quarter before the 25th written to the town safety office briefly report the unit of production safety supervision performance in the quarter and the responsibility of the production safety work within the scope of the work, and will be used as an important element of the end of the year appraisal of the relevant responsible person.

Participants: xxxx

Minutes of the meeting on production safety 8

Meeting time: xx, xx, xx

Meeting place:

Participants:

Minutes of the meeting:

Meeting content:

1, in response to the current unclear management of the Group's headquarters at noon lunch breaks, which led to some of the Employees arrive late in the afternoon, the work is more loose phenomenon, the meeting put forward for the noon lunch break time period to make uniform provisions of the proposal, such as reference to the apparel industry, 15 minutes ahead of the end of work to avoid the peak period, the arrival time can be delayed for up to 15 minutes.

2, the meeting asked each person to summarize the most impressive points after reading the "Way of the Future of Weizhi Enterprises": ① people, employees, the company's needs, instincts, the essence of the needs

② the best of themselves, humane themselves, acceptance of their own (good and bad aspects) ③ the pursuit of the value of one of the best products, customer service value

④ to create a community, including music, fence, flora and fauna, the environment, etc.

④ to create a community, including music, fencing. flora and fauna, environment, etc.

⑤ Employee Care

⑥ Love and Responsibility

⑦ Gratitude and Harvest

⑧ Harmony with All Things

3. The meeting raised the question of why everyone is not doing the best of themselves, and the participants answered as follows:

① Inertia

② Lack of self-confidence, lack of professionalism

③ Lack of confidence, lack of professionalism

③ Inertia, lack of professionalism

③ Inertia, lack of confidence, lack of professionalism

③ do not know their own goals, what they want

④ can not accept all their own, true expression of themselves

⑤ personal views affect the harmony with the outside world

⑥ obsession

4, the group asked before the end of the year, each person to submit "how to be the best of yourself "10 cases, the department submitted 10 cases of practicing Weishi corporate culture. The meeting decided that before the end of August, the headquarters of the Ministry of Human Resources, each employee to submit in writing at least "how to be the best of themselves" case 5, before the end of September, each person to submit the department to practice the Weishi corporate culture case 2. For the writing of individual cases, the meeting suggested the following format:

① Status: _______

② Implementation: _______

③ Results: _______

For the writing of departmental cases, the meeting gave some examples to illustrate:

① x company production workers, because of long hours of sitting is not good for health, to the company's production department, to the company's production department, to the company's production department, to the company's production department, to the company's production department, to the company's production department, to the company's production department, to the company's production department. Sitting for a long time is not conducive to good health, to the general design of a breathable can be dissipated cushions to facilitate the use of workers.

② clothing company put forward "you wear I wash I iron" activities

③ to the staff to distribute a variety of books

Note: the cases cited by the staff should be time-sensitive, preferably in the last year.

Meeting gains:

Through this **** creation meeting, all colleagues in the Human Resources Department have a deeper understanding of Weizhi's corporate culture, how to do the best of themselves have a more accurate understanding, and for why not do the best of themselves for a deep reflection. In addition, the meeting also made it clear that this year's individuals and departments need to submit "how to be the best of themselves" case 10, stipulated that each participant needs to submit at least 5 cases at the end of August, and at least 2 departmental cases at the end of September, and combined with the actual situation of the department for the case of the writing of the specific proposals and examples

;

These are the first time that we have seen a case in the world.

;