How to write an application letter for environmental assessment?

Question 1: Sample EIA application letter Application letter for approval of environmental impact EIA document for ××× construction project XX Municipal Environmental Protection Bureau: Our organization intends to construct the ×× project (project name) at ××××× (location). The construction content of the project is: ×××× (main construction content of the project). According to the provisions of the Law of the People's Republic of China on Environmental Impact Assessment and the Regulations on Environmental Protection of Construction Projects, our unit has commissioned ××××× (name of EIA unit) to prepare the environmental impact (report, report form) or fill in the environmental impact registration form. It is hereby submitted to your bureau for approval. Annex: 1, × × × environmental performance impact report (table), registration form; 2, ××××; ×××× × × × × (name of the applicant unit) Year Month The applicant unit (person) address: ×××× Zip code: Contact: Contact phone number:

Question 2: how to write the application for doing an EIA to the Development and Reform Commission for the establishment of the project xx Municipal Development and Reform Commission: Our college since February xx provincial *** approval Since the upgrading to a higher vocational college, in order to build qualified plus characteristics of higher vocational colleges, and strive to improve all the conditions of schooling. According to the provincial Department of Education arrangements, will be in xx years of our college "higher vocational training work" assessment, the results will be used as a verification of our college enrollment plan, development scale, professional settings, etc., the main basis, which will inevitably have an important impact on the survival and development of our college.

After a long period of time, our hospital in the provincial forestry department, xx city *** care, support, all undertakings have achieved rapid development, for the forestry industry in our province and the northern region of Fujian economic development has trained nearly 20,000 various types of professional and technical personnel. However, due to the existing campus land is only 198 acres (including the back of the forest land), a serious constraint on the development of the college, and the Ministry of Education of the State "indicators of the basic conditions of ordinary colleges and universities (for trial implementation)," the relevant provisions of the larger gap. Upon our application, the executive meeting of XX City on April 6, xx decided to allocate 300 acres of land in the vocational campus area of Jiangnan New District of XX City for a fee, and at the same time to control another 300 acres of land as the teaching and construction land of our college for the construction of the new campus of the college.

In summary, the College, after thorough research and argumentation, intends to invest in the construction of the new campus in Jiangnan. The total investment in the construction project is 88.33 million yuan, of which the total investment in the first phase of the construction of the Jiangnan Campus in 2006-2010 is 38.83 million yuan, and the second phase of the construction of the organization in 2010-2015 will be 49.5 million yuan, with the construction funds required to be resolved by the college from the financial institutions, loans and other channels of financing and self-financing. After the completion of the first phase of the new campus in Jiangnan, the scale of full-time students can reach 1500-2000 people. According to the relevant provisions of the project construction, we hereby apply to your committee for the establishment of the project.

Please approve the above request.

Question 3: How to write an application for environmental assessment The State Environmental Protection Administration issued the "Qualification Management Measures for Environmental Impact Assessment of Construction Projects" is the main basis for the implementation of specific management of the environmental impact assessment qualification at the current stage, the B evaluation organization should have: 12 or more full-time technical personnel for environmental impact assessment, of which at least six are registered in the organization's environmental impact assessment engineers, and the other personnel The other personnel shall obtain the environmental impact assessment post certificate. If the scope of evaluation of the environmental impact statement includes nuclear industry, there shall be at least two nuclear safety engineers registered with the organization among the full-time technical personnel. Evaluation of the scope of the environmental impact statement evaluation organization, should have more than eight full-time technical staff of environmental assessment, of which at least two are registered in the agency's environmental impact assessment engineers, other personnel should obtain the environmental impact assessment certificate.

The categories are divided by nature, such as: social area, petrochemical, metallurgy electromechanical, etc., not by water, gas, sound.

Question 4: How to write an application for environmental assessment of plastic granulation plant Find a professional EIA company to write an EIA report

Question 5: How to apply for an EIA report A. Legal basis

"Environmental Protection Law", "Environmental Impact Assessment Law", "Regulations on the Management of Environmental Protection of Construction Projects", "Interim Measures for Public Participation in Environmental Impact Assessment", "Zhejiang Province, the construction project Environmental Protection Management Measures" and so on.

Second, the content of the license

The environmental impact assessment of construction projects submitted by the construction unit to review the document, issued by the environmental protection review.

Third, the information to be submitted and conditions

Construction units in the application for permission to evaluate the environmental impact of construction projects, should be submitted to the reception center of the following materials (the following materials are 1):

1, construction units require permission to evaluate the environmental impact of construction projects application report.

2, the provincial department approved the project proposal or other relevant departments effective basis for the project.

3, in line with the technical specifications of environmental impact assessment of construction projects and environmental impact assessment of documents and short version (including electronic documents).

4, the environmental impact assessment documents of construction projects pre-approved by the industry, the pre-approval opinion of the competent industry department is required.

5, the project location of the city, county environmental protection department of the construction project environmental impact assessment documents.

6, construction projects involving soil and water conservation, there must be a water administrative department to review and agree to the water conservation program.

7, coastal engineering construction projects, there must be a marine administrative department for examination and approval.

8, the site is located in the chemical and petrochemical centralized industrial parks, as well as other projects in the presence of toxic and hazardous substances construction projects in the park, the need for regional planning and environmental impact assessment of the review of the document.

9, the planning department of the site selection of the first review of the views and land use of the land resources department of the pre-trial comments.

10, the owner of the corporate commitment to environmental protection measures.

11, the construction unit on the project's publicity materials.

12, other required materials.

Fourth, the processing procedures and time limits

(a) Acceptance

1, the acceptance of the center staff of the applicant's application materials for formal review, and according to the provisions of Article 32 of the Administrative Licensing Law, respectively, to deal with: the application materials are complete, in line with the statutory form, to be accepted, and issued a receipt of acceptance; incomplete or not in line with the statutory form of the application materials, or within five days on the spot or within five days, or within five days. Form, on the spot or within five days of the application unit to inform the full content of the need to make corrections.

2, processing time: 1 working day.

(B) permit review

1, the Construction Project Management Division in accordance with the permit conditions for the application of material for substantive review, the construction project environmental impact report on the short version of the public, the permit review of the views of the leadership of the Office for finalization.

2, for the time limit: EIA report review of construction projects, the general project commitment of 25 working days, special projects according to the EIA law provides 60 working days;

EIA report form review of construction projects, the general project commitment of 12 working days, special projects according to the EIA law provides 30 working days;

EIA registration form review of construction projects, the general project commitment of 5 working days for general projects, and 15 working days for special projects according to the EIA Law.

3, inform the procedure: the review found that the permit is directly related to the significant interests of others, shall inform the interested party and listen to the views; inform the applicant, the interested party has the right to legal or reasonable period of time to make statements and defenses. Permit directly involves the applicant and others with significant interests, before making a decision on the permit, shall inform the applicant, the interested party the right to request a hearing.

Question 6: How to write that application before doing the EIA report? EIA report is a qualified EIA organization to write, environmental management application report is written by the construction unit. Can also be entrusted to the EIA organization on behalf of the work. To send you Beijing, Chongqing two application form format for your reference.

Application Form for Approval of Environmental Impact Assessment Documents for Construction Projects in Chongqing

Construction unit (seal)

Project name

Legal representative Contact person Contact phone number

Correspondence address Zip code

Construction basis Total investment 10,000 yuan

Building address Environmental investment 10,000 yuan

Environmental impact assessment unit name EIA certificate Name of Environmental Impact Assessment Unit EIA Certificate No.

EIA Contract No. EIA Fee Amount

Nature of Construction □ New Construction □ Reconstruction □ Expansion □ Technological Reconstruction

Covered Area Floor Area Industry Classification and Code

Overview of the Construction Project (Production, Service, and Construction Contents, Scale)

Overview of the Surrounding Environment and Environmentally Sensitive Objectives

Possible generation and discharge of pollutants, wastewater receiving water bodies, major ecological impacts and environmental protection measures to be taken

Main conclusions of environmental impact assessment

Main conclusions of the assessment report of the EIA document

Implementation of pollutant emission standards and total pollutant quantity indexes

Annexes (list of related materials):

1. Environmental impact report (table) of the construction project;

2. Evaluation opinion of the technical assessment organization on the environmental impact report;

3. Projects involving soil and water conservation and preparing environmental impact reports shall have soil and water conservation programs reviewed and approved by the competent water administration department.

Beijing Environmental Management Application Registration Form for Construction Projects

Beijing Environmental Protection Bureau:

We hereby report the relevant materials of our project to your bureau and apply for the relevant environmental protection approval procedures.

The project name is located in the district and county Total investment

(10,000 yuan)

Construction unit responsible for environmental protection investment

(10,000 yuan)

Construction location Project nature Responsible department

Correspondence address Zip code Phone number

Covered area

(square meters) Construction area (square meters) Annual increase in water consumption

The project will be implemented in the following areas: (1) water consumption; (2) water consumption; (3) water consumption; (4) water consumption; and (5) water consumption. Water Consumption

(m3) 0 Annual Increase in Coal Consumption

(tons) 0

Drainage Destinations Whether in Water Resource Protection Zone Whether in Coal-free Zone

Type of Construction Project:

Name of Main Products and Annual Output:

Name of Major Raw Materials and Annual Consumption:

Overview of Surroundings:

Remarks:

The project will be completed by the end of this year. Remarks:

Expected to be put into use:

Application registrant Contact phone number Date of application

Application unit seal ... >>

Question 7: How to write an application report for approval of environmental impact assessment documents for construction projects in Zhejiang How to apply for approval to the environmental administrative organs with the right to approve, write the name of the construction project, construction location, construction content, scale, investment, the amount of raw materials used, equipment name, process flow, pollutant emissions. The owner's ID card and a letter of commitment to the authenticity of the content of the application are also attached. After that, the environmental administrative organs will determine the level of EIA, such as registration form, report form, report. The report form and report should be entrusted to the intermediary organization with EIA qualification.

Question 8: EIA application flowchart The procedures for EIA approval are the same throughout the country.

1, commission a qualified EIA company. You take the NDRC project documents as well as the feasibility study report to the EIA company, the EIA company will send people to your processing site for on-site investigation.

2, the EIA company to prepare the EIA report. When the EIA company prepares the EIA report, communicate with the EIA company in time to ensure the quality of your EIA.

3, the EPA commissioned review. After the report comes out, send it to the EPA, if it needs to be reviewed, after the review, some comments will be made, and the EIA preparation staff should be revised according to the review comments.

4, the EPA approval. You finished taking the modified report, hand over a local environmental protection bureau, the environmental protection bureau and publicity, after the publicity will give you an approval document, get approval documents, so that the EIA procedures are completed.

Question 9: What information and conditions are required for a company to apply for EIA qualification? Application materials: (three copies)

Review authority: the Chinese People's **** and the State Ministry of Environmental Protection

The materials to be submitted for the first application

1, application report (including the basic situation of the unit, the contents of the application and the business capacity related to the contents of the application and other circumstances of the brief text description);

2, "qualification of environmental impact assessment of construction projects

3, proof of legal personality (business license of the enterprise legal person or a copy of the certificate of the enterprise legal person) and a copy of the articles of association of the enterprise legal person;

4, proof of fixed assets (property, instruments and equipment purchase invoices or other effective proof);

5, proof of the workplace (proof of real estate, lease contract or other effective proof);

6, proof of the workplace (real estate, lease contract or other effective proof);

7, proof of the workplace (real estate, lease contract or other effective proof) (Proof);

6, environmental impact assessment of full-time technical staff labor relations certificate (issued generally should not be earlier than the application time of six months):

(1) the establishment of institutions can be submitted to the unit's personnel department or personnel management authority of the higher personnel department of the personnel relations (official in the program) to provide proof; the institutions can be submitted to the employment of social insurance management agency issued in the unit's social insurance management agency. (2) Enterprise personnel can submit the list of social insurance (pension, medical care, unemployment) issued by the social insurance management agency or proof of participation in the unit's list of social insurance (pension, medical care, unemployment) or proof and labor contracts;

(3) after the return of the retired or hired personnel can submit the Retirement certificate and the rehiring certificate or labor contract issued by the unit.

(4) For those who cannot provide the above materials due to special circumstances, they should provide a detailed description of the labor relationship and attach other valid certificates.

7, environmental impact assessment of full-time technical staff academic certificates, certificates of registration of nuclear safety engineers, etc.;

8, environmental impact assessment of the internal management and quality assurance system and other relevant documents;

9, personal proof of relevant performance (and the scope of the application for the evaluation of the environmental impact assessment of environmental impact assessment engineers presided over the preparation of the environmental impact assessment report for approval version of the archives) Home, personnel list face and a copy of the approval);

10, the legal representative of the resume and a copy of identity documents;

11, environmental impact assessment engineers applying for the first time or re-registration of the original materials (see the specific requirements of the registration of professional qualifications of environmental impact assessment engineers management of the relevant provisions).

Note: The materials in item 1 above are bound separately, materials in items 2-10 can be combined, and materials in item 11 are organized separately according to relevant requirements.

Question 10: How to apply for environmental impact assessment qualification? At present, it is a bit difficult to apply for environmental impact assessment qualification. It must meet the management requirements of national regulations.

The qualification management is divided into two categories: Class A and Class B.

(1) The qualification of environmental impact assessment is a very important element in the management of environmental impact assessment.

(1) Class A evaluation organizations should have the following conditions:

1) registered in the People's Republic of China *** and the territory of the various types of ownership of enterprises or legal persons, with a fixed workplace and working conditions, fixed assets of not less than 10 million yuan, of which not less than 3 million yuan of industrial and commercial registration of business corporations;

2) to be able to carry out the planning, major watersheds

2) be able to carry out planning, major watersheds, cross-provincial administrative regions, environmental impact assessment of construction projects; can independently prepare the environmental impact report of construction projects with complex pollution factors or significant ecological and environmental impacts; be able to independently complete the engineering analysis of the construction project, the current situation of each environmental element and ecological environment investigation and prediction and evaluation, as well as economic and technical justification of the environmental protection measures; have the ability to analyze and audit the technical reports and monitoring data provided by the collaborative unit

3) have more than 20 full-time environmental impact assessment of technical personnel, of which at least 10 registered in the agency's environmental impact assessment engineers, and other personnel should obtain the environmental impact assessment job certificate. Environmental impact report evaluation scope includes the nuclear industry category, the full-time technical staff should also have at least 3 registered in the agency's nuclear safety engineers;

4) equipped with engineering analysis, water environment, atmospheric environment, acoustic environment, ecology, solid waste, environmental engineering, planning, environmental economics, engineering estimates and other professional and technical personnel;

5) environmental impact report Each category within the scope of the evaluation should be equipped with at least three environmental impact assessment engineers registered in the organization of the corresponding category, and at least two people presided over the preparation of the corresponding category of environmental impact report approved by the administrative department of environmental protection at or above the provincial level.

The category of environmental impact report form for special projects within the scope of evaluation of environmental impact report form should be equipped with at least 1 environmental impact assessment engineer of the corresponding category registered with the organization;

6) within the past three years, has presided over the preparation of at least 5 environmental impact reports for approval by the administrative department of environmental protection at or above the provincial level;

7) has a sound (7) has a sound quality assurance system for environmental impact assessment work;

(8) equipped with special instruments and equipment consistent with the scope of the evaluation, with the ability to digitize documents and archives, and have a more complete computer network system and file management system.

(2) Class B evaluation organizations should have the conditions:

1) registered in the People's Republic of China *** and the territory of the various types of ownership of enterprises or legal persons, with fixed workplaces and working conditions, fixed assets of not less than 2 million yuan, the enterprise legal person registered capital of not less than 500,000 yuan. Among them, the scope of evaluation for the environmental impact report form of the evaluation organization, fixed assets of not less than 1 million yuan, corporate business registered capital of not less than 300,000 yuan;

2) able to independently prepare the environmental impact report or environmental impact report form of the construction project; able to independently complete the engineering analysis of the construction project, the current situation of the various environmental elements and the ecological environment investigation and prediction and evaluation, as well as the economic and technical justification of environmental protection measures; have the ability to independently complete the construction project engineering analysis, investigation and prediction and evaluation and environmental protection measures. Measures of economic and technical justification; the ability to analyze and review the technical reports and monitoring data provided by the collaborating units;

3) have more than 12 full-time environmental impact assessment of technical personnel, of which at least six are registered in the agency's valve impact assessment engineers, the other personnel should be certified to obtain the environmental impact assessment positions. Environmental impact report evaluation scope includes the nuclear industry, full-time technical staff should also have at least two registered in the agency's nuclear safety engineers.

Evaluation of the scope of the environmental impact report evaluation organization, should have more than eight full-time environmental impact assessment of technical personnel, of which at least two are registered in the agency's environmental impact assessment engineers, other personnel should obtain the environmental impact assessment post certificate;

4) equipped with engineering analysis, the water environment, the atmospheric environment, acoustic environment, ecology, solid waste, environmental engineering Environmental engineering and other aspects of professional and technical personnel.

Evaluation of the scope of the environmental impact report for the evaluation agency, need to be equipped with engineering analysis, environmental engineering, ecology and other professional and technical personnel;

5) environmental impact report evaluation of each category within the scope of the agency should be equipped with at least two registered in the corresponding category of environmental impact assessment engineers, and at least one person has presided over the preparation of the corresponding category of the environmental impact report.

The environmental impact report form evaluation scope of the environmental impact report form categories of special projects, should be equipped with at least 1 registered in the agency's corresponding category of environmental impact assessment engineers;

6) has a sound quality assurance of environmental impact assessment work ...... >>