What items should be accepted before the commissioning of new equipment? How to put a good acceptance of quality
New equipment acceptance must be good quality: attention should be paid to the acceptance of the equipment "check information", appearance inspection and actual operation, the three are unified, closely integrated, adhere to technical standards, in order to ensure quality. Specifically: ① the competent department is responsible for organizing the relevant professional and technical personnel, station chiefs and duty personnel *** with the overall acceptance of the equipment; ② the appearance of the equipment item-by-item inspection, checking, review of drawings, information, test results, relay protection calibration reports, commissioning reports and product specifications, to make the conclusion that can be put into operation; (including checking the position of the relay protection value of pressure plate, etc.); ③ on the circuit breaker disconnecting switch should be pulled, pulled, checked, and the actual operation of the equipment. (including checking the position of relay protection value pressure plate, etc.) ③ The circuit breaker disconnecting switch shall be pulled and closed for test operation, and if there is any problem, it shall be handed over to the construction unit. ④ in the overall acceptance, after passing the test run, formalize the handover and connection procedures with the construction unit.