Introduction: Safety is the basis of enterprise development, the workshop safety management work should be carried out in depth "safety first, prevention first" policy, to promote production safety, always put safety in the first place, to do the prevention of prevention, to reduce the rate of safety accidents so as to achieve the best safety state.
Workshop quality problems how to control Part 1
First, strengthen the training, improve the organization
(1) to strengthen the training of managers, improve the quality of production safety management. Regular, regular, batch training of production management personnel at all levels, engineers and technicians, seriously study the relevant laws, regulations and normative documents to improve the quality of management of production safety, so that the production safety can manage, will manage, manage well.
(2) Strengthen the pre-service training of operators (three-level training) to improve the operator's awareness of production safety. The new operators must be pre-job safety technology education, so that they are familiar with and comply with the type of work and the various safety technology operating procedures, and safety technology examination, only after passing the qualification to be able to go on duty operation. For those engaged in electricians, mechanics and other special types of personnel must have the appropriate documents, through the examination before being allowed to operate on duty.
Establishment of production safety management team. Department manager, director of the Safety Office as the leader, to the workshop director, each team leader as a member. Formulate and improve the safety responsibility system for managers and operators, regularly study and solve problems in production safety, preside over the investigation of accidents, and put forward opinions on the treatment of responsible persons and improvement measures. At the same time, the organization of safety inspections, safety meetings, exchange of experience in safety work, to ensure that the production is carried out in a safe state.
Second, grasp the implementation of safety operating procedures, so that the action to implement safety.
1, workshop managers at all levels should be strict management, the safety of the work with the actual combination of the work to grasp the work of strict, fine, and practical. Grasp strict is to take the principle of heavy rewards and penalties in safety management, equal treatment; grasp fine is to go deep into the actual, from the smallest place to do, from the droplets to do, to see the slightest thing, to prevent the slightest step. From the control of anomalies, reduce obstacles, prevent accidents on the article, clear the responsibility of each position, the task is broken down, each in its own way, each responsible for its own responsibility, layer after layer of responsibility, the implementation of the person; grasp the real is to be down-to-earth, the safety of the work can not be a little bit of falsehoods, from the practical point of view, not only in the verbal, and not only in the article, but to lead by example, in-depth reality, down to the body to grasp the implementation. For the actual workshop, come up with practical measures and methods, together with the workers, group efforts, up and down, spend a lot of effort to solve the problems one by one.
2, pay close attention to all kinds of safety hazards. Hidden danger is not removed, such as a thorn in the back. By carefully analyzing the accidents over the years, the reasons are manifold, but a very important point is that there is no determination and effort to find and eliminate the existence of hidden equipment and management deficiencies. Therefore, we must have to bite the bullet is the perseverance and courage, not to find out the hidden problems, not to eliminate the defects will not stop. At the same time, check the hidden danger is a very hard, detailed, specific work, must be combined with the "safety inspection", and actively create a large-scale, full participation in the activities of the atmosphere of a great momentum. Clearly check what, how to check, who is responsible for the specific implementation in place, to the person. To check the details, check the real, to achieve "horizontal to the edge, vertical to the end, leaving no dead ends".
1, supervise the construction unit to implement the production safety organization guarantee system, establish a sound production safety responsibility system .
Project general contracting unit enterprise legal representative of the enterprise construction safety production is responsible for the overall responsibility; project manager is the first person responsible for the project safety production, the project construction safety production is responsible for. The implementation of total subcontracting of the general contracting unit, the subcontracting unit of production safety to implement unified leadership, unified management. For the works contracted by subcontracting units, the general contracting unit shall make detailed safety briefings, put forward clear safety requirements, and carefully implement supervision and inspection. Supervision should check whether the construction unit safety production organization and guarantee system is established, whether the safety production responsibility system is implemented, whether the safety production guarantee system is effective operation, and require all the construction units involved in the project must strictly carry out the implementation of the various rules and regulations of safety production.
2. Require construction units to consistently carry out compliance safety education.
Requirements for the project department to strengthen the legal system education; supervise the construction unit project manager to regularly or irregularly organize the project department management and operating personnel to learn the national and industry safety regulations and construction safety technical specifications, procedures, standards; grasp the workers to enter the "three levels of safety education". Supervise the construction unit in each process before construction, carefully written and oral safety technology, and for signature procedures; according to the progress of the project and for the accident-prone seasons, the organization of the construction party held a special meeting of the safety work, and to encourage its various forms of safety education activities.
3, supervise the construction side in pay close attention to the safety inspection at the same time timely implementation of the rectification of hidden safety problems.
Establishment of a sound construction site safety management organization, equipped with full-time safety personnel; to strengthen the construction site scaffolding, holes, edges, safety net erection, construction of electricity dynamic patrol inspection. The overall lifting scaffolding, templates, tower cranes, machinery should require the construction unit after the installation of the organization acceptance, strictly for qualified use of the handover procedures, to prevent inadequate protective measures and the use of operating with disease.
4, supervise the construction unit to use qualified safety protection equipment.
Construction site must use the quality of qualified safety supplies. Safety nets, helmets, safety belts, leakage protection switches, standard distribution boxes, scaffolding connectors, etc. to carry out material review work to ensure that the procurement of products in line with national standards. Construction units are required to carry out inspection and testing before use strictly prohibit the use of poor quality, failure or state-ordered elimination of products to ensure the safe use of protective equipment.
Workshop quality problems how to control Part 3
20xx year, our workshop in the plant to ensure that each set of devices to turn equipment under the premise of normal inspection, maintenance, undertake the xx project, is now on the maintenance and quality of the work of the project to do the following summary.
First, build a full quality assurance organization
At the beginning of the workshop leadership team, for the maintenance of the year, the installation of the task of the characteristics of the careful layout and arrangements, the establishment and improvement of the workshop's quality assurance institutions and systems, for key projects, compared to the system of project managers, by the director of the workshop, the deputy director and the management of all managers composed of a xx Project construction management team, clear project manager, technical manager, safety, quality and other responsible person's authority and responsibility. Established a unit of engineering qualification rate of 100%, zero quality accidents, QC results of one, the project delivery and inspection of a pass rate of 100%, the customer opinion processing rate of 100%, the use of engineering materials is correct rate of 100%, the delivery of technical documents true, accurate and construction synchronization rate of 100% of the overall quality objectives. This will refine the overall work to the person, so that everyone is clear about their respective tasks, each responsible for their own, so as to work for the quality of work, from the institution to lay the foundation.
Second, improve the quality assurance measures
In order to ensure that the key projects can be completed on time and according to the quality of the workshop leadership and technical staff to develop a series of effective quality assurance measures. First from the workshop selected some production backbone, composed of engineering installation group. For the characteristics of the project, the workshop engineers and technicians, workers technicians and production backbone for special training, in order to better understand, familiar with the project and equipment conditions. Before the construction of the project, the workshop organized engineers and technicians and construction workers, carefully study the technical requirements of the construction drawings and the relevant standards and regulations, so that engineers and technicians and construction workers to understand and master the technical requirements of the construction and quality standards, and more consciously and strictly implement the construction norms and standards, to comply with the operating procedures and construction discipline, and to ensure the quality of the construction.
In the construction process, strengthen the quality control of the construction process, strict implementation of the construction process discipline, according to the procedures for construction, in order to ensure that the quality of construction to meet the requirements of the design provisions of each process should be inspected to determine the qualification of the checklist signed on the approval before the next process of construction.
In addition, give full play to the role of full-time quality inspectors, the implementation of the quality veto system, the quality of the first place. Quality inspectors do their duty, adhere to the scene every day, check the quality of construction and construction discipline, found that the problem of timely notification, deadline for rectification, so that unqualified not acceptance, do not meet the standards are reworked. The quality of the entire project, the site supervision, quality supervision station and the owner's affirmation.
Third, seriously carry out QC activities
This year, our workshop actively organize the various teams to carry out QC group activities, the focus of the daily work and the difficulties of the project, each activity is seriously discussed, carefully summed up *** completion of the results of the QC activities of 5. The future maintenance work has a good guiding role.
In short, through a year of workshop up and down the *** with efforts to make the workshop equipment installation and equipment repair and maintenance of quality management level on a stage, the future we have to continue to work hard to learn more advanced management methods, and strive for quality management work on a new level.
Workshop quality issues how to control Part 4
First, the organization of mobilization
The establishment of the "quality month" activities of the leading group, the director of the workshop to serve as team leader, leading the work of the whole situation, through the workshop meeting, the shift before and after the shift will be propaganda.
Second, focus on the activities
In accordance with the company's quality activities in the month of the organizational arrangements, the workshop throughout the company's quality activities in the month of the entire content of the activities, and the specific refinement of the activities of the electrical instrumentation project, involving 7 items, including publicity and launching, high efficiency and quality overhaul, the motto of the collection of papers, rationalization proposals, safety and quality training, etc., have been Specifically to the responsible person, to determine the task indicators, and developed a perfect assessment of rewards and punishments. By the end of the month, these activities have all exceeded the expected completion of the task indicators. In this regard, the work of the more reaction to the characteristics of the electric instrument is the leading cadres contact point system, workshop three leaders for the contact point of the work of the status quo, the existing problems, can expand the space for detailed and unique education and guidance, not only to open up the front-line team's thinking, but also to promote the quality of the month activities really blossomed in the front line.
Three specific work
Electro-mechanical workshop leaders in-depth to the point of contact, combined with the actual team, around how to "reduce the accident rate of electro-mechanical stabilization of product quality" carried out a thematic discussion on the workshop has been led by the implementation of and has been effective. Work continue to adhere to the implementation of the work, for the workers proposed to stabilize the production of electro-mechanical bar Chen recommendations appropriate combing and summarizing, operable immediately arranged for the implementation of the strong. The main contents are:
First, the DCS technical group on the new arrival of the system card, the operating station motherboard anticorrosion spraying, and sealed bags to protect, reduce the logistics of the storage link of the bad card chances.
Second, the exhaust gas adsorption outdoor with ordinary plastic gas source tube gradually eliminated, replaced by more adaptable to the environmental conditions of the PTFE material gas source tube.
Third, the use of spinning practice parking maintenance opportunities, refining, bath station, drying valve testing, from the automatic control room to send orders, check the valve opening and the automatic control room screen is consistent, faulty valves to be replaced to ensure that the valve regulating function is stable.
Fourth, for the street lamp pole top sealing is not good, rain splash water led to street lamp line short circuit problem, electric repair section using sealant to do a good job of sealing the top of the lamp pole.
Fifth, the implementation of the weekly inspection program, on-site instrumentation for regular calibration, to ensure that the instrumentation is stable and accurate. Especially the key measuring instruments are re-calibrated calibration.
Six, public works section for the jurisdiction of the three substations, 12 PC room, increase the frequency of inspection patrols, record equipment operating parameters, to ensure stable and reliable power supply.
Seven, the electrical section to find a reasonable maintenance cycle, for the production line of the bottleneck motor equipment regular weekly inspection and replacement, replacement of the motor to do repair and maintenance, as spare parts to enrich the inventory.
VIII, with 80,000 tons of project construction, to complete the arrival of the instrumentation inspection into the warehouse and 80,000 tons of temporary power supply and distribution of the site of the emergency overhaul tasks.
Fourth, the motto, rationalization proposals, essay collection activities
Workshop organization of each section of the staff for the "quality month" theme of activities, respectively, the summary of the quality of the month, the small motto, rationalization proposals, the quality of the month of the essay for 65, 23, 14, after the finishing and refinement of the confirmation of the presentation of the "quality month" activities, the quality of the month of the "quality month", the quality of the month of the "quality month" activities. After finishing and refining, the workshop confirmed that 30, 6 and 14 articles were submitted to the functional department respectively. So far, the electric instrument all over the completion of the company's quality month activities leading group decomposition to the electric instrument of the task indicators.
V. Summarize and improve
January as the company's "quality activities" has drawn to a close, but the quality of work is far from over, the electro-mechanical workshop of all cadres and workers will continue to adhere to the quality of the month during the formation of a good style, a good method, the "Grasp the quality level enhancement, promote the transformation of the development mode" this concept is further institutionalized, in the implementation of change and efficiency, three science and technology, create a series of activities, continue to highlight the quality of work, to promote the workshop production and maintenance, technical reform and technological measures, basic management work to further deepen, refine, for the construction of quality and harmonious electrical instrumentation, for the overall coordination and sustainability of the company.
How to improve the quality of the workshop?
Workshop quality issues how to control Part 5In response to the company's 20XX "quality month" activities, to promote the "quality month" activities of the implementation of various measures, in the quality month activities, as the company's external operations, the "front" of the "face". In the quality month activities, as the company's external business "front" unit, the workshop has been committed to the quality of service, technical skills to improve the quality, to achieve the "user zero complaint" goal, to establish the brand image of Ancai gas station in the industry. The following is the XX workshop organization to carry out quality month activities details:
First, the quality month meeting:
1, September 3 around the company's 20XX "quality month" activities notification, the workshop based on the characteristics of the work of the gas station, held to improve operating skills and service quality. The workshop held a special meeting on the "Quality Month" activities, which is mainly focused on the quality of service.
2, the workshop held on September 12, "abide by labor discipline, improve service quality, set up Ancai brand" theme meeting, requiring all station personnel to set an example, strict requirements for their own quality in the quality of the month, strict quality control, to improve the quality of service to promote the improvement of sales volume.
3, September 27 workshop held a "quality month" phase summary meeting, employees enthusiastically on the recent study of quality management knowledge, fire safety knowledge and quality month skills competition activities, to participate in the fire safety knowledge of the network competition and other exchanges. The workshop hopes that through the "quality month" activities, to strengthen the business construction, vigorously carry out job training and professional technical learning.
Second, the form of publicity
workshop hanging "adhere to the quality of victory, improve the competitive strength" of the quality of the month of publicity slogans, in the station area to post quality of the month of publicity posters, the production of quality of the month of the board, the driver of the quality of the publicity in a variety of forms of publicity quality of the month of activities. The company's website has been updated with the latest information on the quality of its products and services.
Three, quality and safety hidden trouble investigation
1, the weather turned cool, increase the exposure of outdoor gas columns, gas machine and other equipment inspection and hidden trouble elimination efforts, on September 5, there is a hidden trouble on the 6 plus the gun on the pull off the valve replacement.
2, the Department of Maintenance organized staff on September 7-13, the station equipment maintenance and repair, the 3 # compressor oil injection repair, to ensure that the compressor exhaust temperature is stable, stable operation of the equipment.
3, to carry out everyone to check a violation of the quality of work activities, routine inspection, self-correction and self-checking before each shift handover, hidden trouble detection, hidden trouble inspection and elimination results informed the whole workshop.
4, September 18, point inspectors found 2 # compressor inlet valve leakage, and more serious, after consulting the workshop leadership, its emergency repair, to ensure reliable operation of equipment.
5, to add the gun grounding line for hidden trouble detection, regularization, to add the gun hose on the implementation of the lifting equipment rust, anticorrosion treatment; station equipment and lighting system for a comprehensive inspection, will be found in a timely manner to rectify the problem.
Fourth, reduce costs to improve quality, energy efficiency
1, the workshop actively carry out the quality of the month, "reduce costs to improve quality, energy efficiency" as the content of the activities: in order to save the cost of overhaul, the workshop organization maintenance department personnel of the station area of the exposed pipeline and ancillary components of the rust, Anti-corrosion, painting; in order to ensure that the gas dispenser high-pressure hose for the regular replacement of the work carried out smoothly, in advance of the gas high-pressure hose and grounding line, the discharge pipe and other accessories into the protection of the hose standby.
2, in accordance with the overhaul program, the workshop's three compressors cooling water system are required to do descaling. In order not to affect the production, the workshop according to the construction plan provided by the manufacturer, the use of three compressors without stopping to take turns to work on the three compressors in the station descaling cleaning work. In the construction process, the maintenance department in accordance with the requirements of the workshop, combined with the construction unit, to develop a detailed construction plan and related safety measures, through this construction, the maintenance staff to learn new knowledge, growth of new talent, improve the level of maintenance.
3, the company's end of the station valve replacement, the use of the morning off-peak hours, through careful preparation beforehand, the replacement of the process of tightly organized, fast, smooth completion of the replacement task, did not have an impact on production and sales.
V. Enhance the quality of service
1, in order to increase sales and improve the quality of service, the workshop to prepare an analysis of the conversion of the staff of the gas car analysis report, arranged for personnel to the company's various departments to send and on-site investigation, in order to better serve the majority of employees with its brainstorming.
2, the workshop to refuel drivers to customer satisfaction surveys, to carry out the "user zero complaint" evaluation activities, and the organization of quality management knowledge learning, to improve the quality of staff attention to quality, improve the quality of service initiative.
Six, skills competition:
September 17 - September 21 workshop was held to fill the gas filling skills and service specifications as the theme of the "quality month" technology, skills competition, filling the Department of the operation of the staff to the team as a unit of the competition, the workshop leader On-site evaluation, the big match activities produced one, two, three, through this activity not only cultivate and improve the staff's operating skills and quality level, but also promote the production of gas station production safety and stable operation.
VII, quality training:
In the workshop of all employees to carry out comprehensive quality management training and education, so that all employees to participate in the workshop quality management activities, called on the staff of the workshop quality management aspects of the more valuable advice.
XX workshop through the quality of the month of the activities carried out, not only to make the staff to improve their own quality awareness, practiced a solid basic skills, to promote the enhancement of the sales of gas; more so that the "customer-centric, set up a brand, reputation-oriented" central idea in the XX workshop in the quality of the month of the activities have been further sublimated.
How to solve the workshop quality problem?
Workshop quality problems how to control Part 620xx, overhaul workshop in the "market-oriented, quality as the focus, to the cost of the main line, to the benefits of the center, to management innovation as the driving force" principle of guidance, all workers sincere unity, rise to the occasion, struggle, solid work, successfully completed the branch issued by the overhaul and the gas volume increase; more so, "to the customer center, establish a brand, reputation," the central idea of the XX workshop quality month activities in further sublimation. Branch of the overhaul and machining tasks, at the same time, in the market, accelerate the development of new products and quality control has achieved better results. Now the repair workshop quality management work this year is summarized as follows:
First, the leadership attention, careful planning, organization and implementation.
Workshop product quality as the foundation of life, vigorously implement the quality strategy, and strive to improve product quality and quality management level. In the "20xx quality month activities", the workshop set up to the main leader of the "quality month" activities led by the leading group, around the theme of the activities, combined with the actual, in accordance with the documents and the company to carry out the requirements of the quality month activities, and carefully formulate and implement a quality The company's quality month activity program.
The second, to take a variety of forms, widely publicized, and enhance the quality of awareness of all staff.
The workshop combined with the actual, take a variety of forms to carry out publicity activities. Through the team discussion, blackboard newspaper, quality month essay, hanging posters and banners in the workplace and other forms, vigorously publicize the quality and safety knowledge, create a good atmosphere of everyone cares about the quality, everyone attaches importance to quality, and further enhance the quality of the workers' awareness, promote the quality of the workshop management work to improve the level of the completion of the year's task, has played a great role in promoting.
Three, highlighting the focus, to carry out special inspections, strengthen the site management.
The workshop revised and perfected the three-level safety education and training, 5S on-site set management, work standards and management processes of the team and each position, and established a workshop, team safety management system at two levels; production, maintenance, service and other key links as a key link, to grasp the site operation management, the team as a key part of the monitoring of the team and the key key vital parts installed conspicuous signs and dangerous parts. Parts of the installation of eye-catching signs and hazard identification points; workshop quality and safety and facilities and equipment, 5S management and other special management from the site management, text data of all aspects of the designation of a person responsible for; regular and irregular supervision and inspection, the existence of the problem of warning, and feedback to the team, timely plug the loopholes in the quality control, to ensure that the quality of the overhaul and the quality of the products processed to reduce the cost of production, improve the The company's main goal is to improve the quality of its products and services, and to reduce production costs and improve efficiency.
Four, high-quality completion of the annual maintenance tasks.
This year, the workshop completed the company's annual facilities and equipment, pipeline network overhaul task 6/6 (items / units), overhaul project completion rate of 100%; complete the branch production overhaul task 89, temporary and emergency tasks 12, as of the end of November has been completed, machining qualification rate of 100%; 15 hidden security risks, processing rate of 100%; Safety standardization team to meet the standard rate of 80%; the total number of accidents of all kinds of 0, 0 employees injured in the line of duty, a strong guarantee of the company's production and operation of the smooth progress of the task.
Fifth, carefully planned quality program and effective implementation, the successful completion of the annual product quality objectives.
This year, the workshop **** completed Jiayuguan Dingan office building 300 sets of confidential cabinets processing and production and on-site installation of the task; Jiayuguan office building, the General Manager of the Office of the General Office of the archives 39 columns of 54 groups of dense cabinet racks processing and installation; the company's low-profile projects 1250mm, 900mm, 273mm, and 630mm x 400mm white iron ducts More than 400 meters of processing production and on-site installation; the company's low and other projects such as various types of distribution boxes and cabinets more than 500 units (sets), more than 8,000 meters of cable trays, a variety of components 9,000 pieces (sets); 24 sets of low-flow blowing device research and development production. Whether the production of overhaul or machining products, have realized a substantial increase in production, quality control level steadily improved the new leap, which for the workshop in 20xx the smooth realization of the quality objectives and the development of the workshop to create the conditions.
Sixth, strengthen the quality of training.
Workshop actively selected employees to participate in the new version of the quality system and procedure documents held by the company's training courses, and organize the relevant personnel to all employees should know the post should be able to post operating procedures and site safety management of the basic knowledge of the training, so that the staff really recognize the importance of quality and safety.
Looking at the whole year, the workshop through the comprehensive strengthening of quality management, quality and quantity to complete the production and maintenance tasks, quality management has made some progress, the results are remarkable. But at the same time, there is still the improvement of the quality management system, improve the work of the impetus is not enough to improve the effect is not obvious, the staff of the quality of the responsibility of the awareness of the weakness of the process technology to improve the work of the weak and other problems. Therefore, in the future quality management work, the workshop will always adhere to the "grasp the quality level, promote the transformation of the development mode" concept and its further institutionalization, actively participate in the quality and safety activities, continue to highlight the quality of work, and promote the workshop production and maintenance, technological reform measures, management work to further deepen, refine, so that the quality management of the workshop continues to move up to a new level, so that the quality management of the workshop is not a good idea, so that the quality management of the workshop is not a good thing. Workshop quality management constantly on a new level.
How to control the quality of workshop problems Part 7In order to improve the quality of machinery factory products, improve the quality of work and enthusiasm of employees, improve the sense of responsibility of departmental personnel, and enhance the cohesion of the enterprise, in September 20xx our company carried out the "quality month" activities, under the leadership of the company's business unit, the workshop attaches great importance to, Under the leadership of the company's business unit, each workshop attaches great importance to, carefully organized, strict requirements, the quality level of each workshop has achieved remarkable results, product quality has been greatly improved. Now the activities are summarized as follows:
First, the leadership attaches great importance to the careful organization
In order to better carry out the activities of the quality month, the Division of machining held a meeting of the entire plant staff mobilization activities to carry out the activities of the quality of the month the purpose of the activities and the requirements of the brief description, and announced that the quality of the month activities to begin. The specific implementation of the quality month activities, the activities of the arrangement of the issues made a concise review. Specific requirements were made for the improvement of each workshop, and the quality month activities were formally kicked off. Requirements to quality month activities as an opportunity to create "everyone cares about quality, everyone attaches importance to quality" atmosphere.
Second, strengthen the training
In this "quality month" activities set off a climax of learning, so that employees set up the concept of quality, improve the quality of staff awareness. Workshops through a variety of forms, to carry out quality training for employees. Machining workshop: the operators are trained to operate in the way of teaching by example, and workers are required to strengthen self-inspection and strictly control the quality of parts; the staff of the whole workshop are trained in the use of gauges. Structural workshop: insist on regular meetings to improve the quality awareness of the staff, every day after the end of production, the quality inspector summarizes the production and quality of the day, and regularly in the workshop to publicize; so that the quality of the workshop as a whole has improved to a certain extent. Work mold workshop to strengthen the staff's drawing recognition training, and gradually carry out staff drawing recognition ability training.
Third, strict control of the quality of the production process
In order to effectively realize the process of quality control, the workshop staff to improve self-checking ability to strengthen the self-checking of the production process. Workshop inspectors to improve the strength and frequency of inspection, all sizes in accordance with the company's internal control standards are strictly enforced, and detailed records. The director of each workshop strictly manages the quality of each workshop, so that the product quality have improved significantly.
Fourth, the quality of the month in the problem is still more
September quality month, the quality of our workshop products have improved significantly, but there are still a lot of problems, the appearance of the quality of the product to be improved, the product is not polished enough to carefully, and some of the details need to be improved, the quality of the month later there has been a lot of improvement, but there are still shortcomings.
The quality of the month activities through the company's personnel *** with the efforts of the successful conclusion of the quality of the month activities have greatly improved the quality of awareness, improve the skill level of personnel and management level, to achieve the desired goal, and achieved good social benefits. Quality month so that the quality of our company has improved greatly, I hope that the workshops to maintain the current good situation, the quality of unremitting, the formation of the month is the quality of the month, day to day to grasp the quality of the good atmosphere, so that the quality of our company continues to a new level, to establish the quality of the company's reputation, the creation of a brand, invincible in the market.
Workshop quality problems how to control Part 8In the automotive skills competition, I tutored the automotive spraying project, after a period of training, the students achieved a good result of the second prize in the province, for the next competition can be further improved, summarized as follows:
First, the reason why the skills competition in the good results, mainly depends on the following aspects:
(a) top-down, attaches great importance to
After receiving the notice of the competition, the rapid selection of players, develop programs, intensive training. The training process, the school leadership attaches great importance and strong support. In the leadership's encouragement and support, my students and I firmly believe that we can overcome the difficulties and complete the training task.
(B) carefully organized, planned training work
Seriously analyze the race situation, the development of skills competition program, detailed arrangements for each stage of the plan to ensure that the entire competition project work in an orderly manner. Before the start of the training held a mobilization meeting, so that both players are clear about their mission and responsibility, to improve the awareness of the competition and attention, put aside distractions, focus on training. According to the program arrangement, first of all, targeted to strengthen the theoretical knowledge of the players. We tried every possible means to find relevant information and videos to create conditions for strengthening the theoretical knowledge of the players. Subsequently, according to the individual situation of the players together to develop a plan for the smooth running of the competition laid a good foundation.
(C) strengthen the training, hard work and preparation
First, I held a strengthened training of the project, for the characteristics of the contestants using different training methods, pointing out the direction of their efforts to overcome the shortcomings, enhance the training of perseverance, and establish the spirit of hard work. Modify the project homework sheet several times, and students together to study the order of homework suitable for their own, improve the efficiency of homework, reduce the time of homework. Secondly, we strengthen the counseling efforts, overcome the family's personal difficulties and all kinds of difficulties arising in the intensive training, and carefully counsel. Poor training conditions, we ensure the density and precision of training.
(D) calmly respond to the battle, and strive for results
Before the contest for students psychological counseling, reduce pressure, light load. Through a day of hard work and competition, the players lived up to expectations and achieved remarkable results.
Second, the skills competition in the shortcomings
Our shortcomings are mainly manifested in the following aspects:
1, the competition is the window of vocational skills, is the window of the development of the industry. The content of the competition is broad and comprehensive, which requires us to be close to the competition in our professional settings and curriculum.
2, the competition to pay attention to, this is the general direction, we implement more attention to the methodology. Students picked, we must be responsible for it, only is not mentally retarded, think of ways are likely to be tempered. Naughty is a vocational school students **** nature, students in school for three years we do teachers is not in the main focus of this one? So I suggest not to discriminate against naughty students, maximize their opportunities.
3, teacher skills operation, professional knowledge is not comprehensive. The next reason is the lack of awareness of participation, no competitive drive.
4, the school hardware is not hard, the site equipment conditions are not enough.
5, the home field advantage is incomparable. Smarties are annoying.
6, the instructor's workload, delaying the main time of training.
Third, the future intention and next year's goal
The next step will be around the competition to do the following work:
1, do a good job of interest group organization, popularization and training, and strive to make more students to become the scope of the training to improve the impact.
2, around the competition to adjust the teaching plan, rearrange the content of the relevant courses.
3, the competition for teaching, the model of the competition training deep into the classroom, so that every student to become a participant in the teaching to establish a skills-based, permeated with the awareness of theoretical learning.
4, I suggest that all of our vocational schools in the future to strengthen exchanges and cooperation to achieve resources **** enjoy; more experts to school guidance; efforts to improve the internship training equipment; to improve the level of teacher skills education and teaching; only in this way, we next year's provincial competition for the first prize, the future of the competition will go further,
.