Integrated wastewater treatment equipment installation what need to pay attention to matters?

Integrated wastewater treatment equipment *** there are three installation methods: respectively: buried, above ground and semi-buried. Selection of installation methods, to consider the local buried climate and environment, such as the Northeast region, due to low winter temperatures, it is recommended to install buried sewage treatment equipment below the permafrost, if you want to install above ground need to pay attention to the perfection of the winter warming measures.

The second is the installation site, integrated wastewater treatment equipment should be installed on the site to choose the terrain is relatively flat, clean environment, electricity and drainage facilities, this site can facilitate the construction of the installation, but also to facilitate the subsequent use of maintenance. Close to the drainage point, can be dealt with near the discharge, reduce the use of pipe network.

Finally, the equipment check, not only to check whether the equipment itself parts are complete, after the completion of the installation, should be poured into the equipment, check the car whether there is a leakage problem. Before connecting the power supply, also be sure to pay attention to the motor and fan running wind direction is the same as the indicated direction. We must follow the manufacturer's regulations when installing, if the equipment manufacturer can cooperate with the installation, it is the best.